Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹73.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | Rejected-Technical | - | Rejected-Technical Incorrect Undertaking Format | ||
| 3 | Rejected-Technical | - | Rejected-Technical Undertaking not enclosed |
Tender Value
₹77.7 L
EMD Value
₹1.6 L
Closing Date
24 Jul 2026, 4:00 pmClosed
Executive Engineet
PWD RnB Division Rajouri
(i) Improvement/Upgradation of Rajouri town roads. (3rd Call)
2026_PWDJK_316790_4
e-NIT No 52 of 2026-27 Dated 18-07-2026
Open Tender
Civil Works
Percentage
Rajouri
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,500
Executive Engineer
₹1.6 L
18 Aug 2026
18 Jul 2026
25 Jul 2026
18 Jul 2026
24 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling manually/ mechanically including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: Bituminous road. | 625 | Sqm | 305.95 | ₹1,91,218.75 |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 1:4:8 or leaner mix (i/c equivalent design mix) | 9 | Cum | 1,064.55 | ₹9,580.95 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 180 | Cum | 218.4 | ₹39,312 |
| 4 | Drain Clearance In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m. | 180 | Cum | 331.15 | ₹59,607 |
| 5 | Providing and laying in position Cement concrete of specified grade excluding the cost of centering and shuttering – all work upto plinth level.1:5:10(1 cement : 5 coarse sand : 10 graded crushed stone aggregate 40 mm nominal size) | 180 | Cum | 4,826.5 | ₹8,68,770 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size | 36 | Cum | 5,733.6 | ₹2,06,409.6 |
| 7Centering and Shuttering including strutting, propping etc and removal of form work for mass concrete | |||||
| 7.1 | Foundations, footings, bases of columns | 240 | Sqm | 286.35 | ₹68,724 |
| 7.2 | Suspended floors, roofs, landings, balconies and access platforms | 9 | Sqm | 718.2 | ₹6,463.8 |
| 8 | Providing and laying Reinforced Cement Concrete 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) in suspended floors, balconies, landings and staircase having upto 15° slope. excluding cost of centering and shuttering , all work upto floor V level | 0.9 | Cum | 9,821.85 | ₹8,839.67 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_1035004.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .