Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | GAAQG WORKS AND SERVICES PRIVATE LIMITED 1₹8.4 LAccepted-AOC | 1 | Accepted-AOC 1 | |
| 2 | 2₹8.4 L+₹4,324.02 (0.51%)Rejected-AOC | 2 | Rejected-AOC 2 | |
| 3 | 3₹9.1 L+₹70,745.66 (8.42%)Rejected-AOC | 3 | Rejected-AOC 3 |
Tender Value
Refer Docs
EMD Value
₹20,500
Closing Date
18 Oct 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
BLY
RECONSTRUCTION OF VRB FOR SABEYPUR DY AT KM 6.300
2023_UPIDC_845812_2
03/EE/RCD/2023-24
Open Tender
Civil Works - Canal
Item Rate
35 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹266
₹20,500
1 Nov 2023
13 Oct 2023
18 Oct 2023
13 Oct 2023
18 Oct 2023
13 Oct 2023
Amount
Earth work in foundation in dry soil including lift up to 1.50 M & lead up to 30 M back filling, waterring and ramming of excavated earth into the trenches and disposal of surplus earth as directed by the Engineer-in-Charge.
Centring & shuttering for C.C. work including cost of shuttering material , labour and T&P required for proper completion of work for slab, lintels, sun shades,foundation, column & walls etc.
Laying C.C. 1:3:6 Mix (M-10) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering.
Centering & shuttering for R.C.C. work including cost of centering & shuttering material, labour and T&P required for proper completion of work etc.
Reinforcement including cutting, bending & binding in position including all cost of labour, material and T&P etc. complete.
Laying R.C.C. 1:1.5:3 Mix (M-20) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement.
R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement.
Supplying and laying tarfelt sheet below aproach slab as paper bearing including cost of all material labour and T&P required for proper completion of work.
Laying Brick work C.M. 1:4 Mix cement & coarse sand including cost of all material, labour and T&P etc. complete.
Pointing in 1:2 with cement & C/sand mortar.i/c cost of all material labour T&P etc.
Dismantling Brickwork or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60 m as per direction of Engineer in Charge
Finishing of wall with water profing cement paint of approved make such as super snocem durocem robicem, supreme quality of required shade on uncoated wall surface (one coat) over one coat white cement primer to give even shads after throughly brushing the surface to remove all dirt and dust and remaining of loose powder ed material including curing & cost of all materials.
Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of private land and earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and initial lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank withen 30 m distance as directed by Engineer in charge & also including all cost of borrwed earth from pvt. land, material, labour & T&P etc. complete.
Earth work in diversion removing including lift upto 1.5m and lead upto 30 m, including cost of driver/assistant driver, POL,maintenance of machine, contractor profit, taxes etc butexcluding leveling, dressing & compaction.
m/s madan lal contractor and suplayars
M/S HASNAIN AHMAD CONTRACTOR
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .