Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Finance | -31.11% | ₹3.8 L | L1 | Admitted-Finance |
| 2 | L2₹4.0 L+₹17,358.26 (4.53%)Admitted-Finance | -27.99% | ₹4.0 L+₹17,358.26 (4.53%) | L2 | Admitted-Finance |
Tender Value
₹5.5 L
EMD Value
₹11,000
Closing Date
5 Aug 2026, 1:00 pmClosed
Executive Engineer CMD JKPDC Udhampur
Executive Engineer CMD JKPDC Udhampur
Plugging of leakage inside canal between RD 4000m to 5020m CHEP III (Shutdown work)
2026_SPDC_314102_1
ENIT 08 of 2026-27
Open Tender
Civil Works
Percentage
udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
CP and AO JKPDC Jammu
₹11,000
Office of the Chief Engineer CID Wing JKPDC Jammu
27 Aug 2026
2 Jul 2026
7 Aug 2026
2 Jul 2026
5 Aug 2026
2 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Silt clearance from canals. Inclusive of initial lead and lift. ( 50m & 1.5m respectively ):Wet | - | cum | 1 | - |
| 2Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil | |||||
| 3Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in- charge: 1:3:6 or richer mix (i/c equivalent design mix) | |||||
| 4Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | |||||
| 5 | 12mm Cement plaster finished with a floating coat of neat cement of mix: 1 : 3 ( 1 cement : 3 fine sand) | 1 | sqm | - | - |
| 6 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared | - | sqm | 1 | - |
| 7 | Weed clearance: From canals(including extraction of roots) | - | sqm | 1 | - |
| 8Carriage of materials | |||||
| 8.01 | Sand upto avg. distance of 05Km by MT | 19.16 | cum | 200.74 | ₹3,846.18 |
| 8.02 | Stone aggregate upto avg. distance of 05 Km by MT | 27.77 | cum | 200.74 | ₹5,574.55 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
SBDW1.pdf
Tender Documents • 1.06 MB
BOQ_1016868.xls
BOQ • 0.24 MB
ExtensioneNIT08.pdf
PDF • 0.30 MB
Extension001.pdf
PDF • 0.42 MB
Corrigendum.pdf
PDF • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .