Tender Value
₹14.6 Cr
EMD Value
₹14.6 L
Closing Date
9 Apr 2026, 6:00 pmClosed
The Registrar
REPAIR, RENOVATION & UPGRADATION WORKS OF THE CONVENTION HALL BUILDING
287301
Estate / Tender / 5629 / 2026
Open
Civil Works - Buildings
Works
Surat
10 documents required · 10 mandatory
₹21,240
Yes
THE REGISTRAR, VEER NARMAD SOUTH GUJARAT UNIVERSITY, SURAT
₹14.6 L
Yes
19 Mar 2026
19 Mar 2026
19 Mar 2026
9 Apr 2026
19 Mar 2026
NAME OF WORK: -
PROPOSED REPAIR, RENOVATION &
UPGRADATION WORKS OF THE
CONVENTION HALL BUILDING (2ND Attempt)
VEER NARMAD SOUTH GUJARAT UNIVERSITY, SURAT
Sr No Section Description Page No
1 Invitation for Bid (IFB)
2 Section -1 Instructions to Bidders
3 Section -2 Qualification Information
4 Section -3 Conditions of Contract
5 Section -4 Contract Data
6 Section -5 Technical Specification
7 Section -6 Form of Bid
8 Section -7 Bill of Quantities
9 Section -8 Securities and Other Forms
10 Section -9 Drawings
11 Section -10 Documents to be furnished by Bidder
12 Section -11 Standard Specification of Materials
13 Section -12 Detailed Technical Specifications
14 Section -13 Additional Technical Specifications
15 Section -14 List of Approved Makes
INVITATION FOR BID
VEER NARMAD SOUTH GUJARAT UNIVERSITY UDHNA -
MAGDALLA ROAD, SURAT.
E-TENDER NOTICE
Tenders for the works given below are invited from the Government registered contractors. Tenders are invited
for the following works through online process on https:// tender.nprocure.com
1. TENDER FOR PROPOSED REPAIR, RENOVATION & UPGRADATION WORKS OF THE CONVENTION
HALL BUILDING AT VNSGU CAMPUS, SURAT. (2ND Attempt)
1.) Estimated Amount (Rs.) : 14,57,75,718=03
2.) Earnest Money Deposit (Rs.) : 14,58,000=00
3.) Tender Fee (Rs.) : 21,240=00(18000=00 Tender Fee + 3240=00 GST)
4.) Time Limit : 09 Months (Excluding 3 months of Monsoon period )
5.) Registration Class : “AA” Class & Sp. Building Cat. I
6.) Solvency Certificate : 2,91,55,143=61 (Current Financial Year)
Tender documents are available on https:// tender.nprocure.com
1 Date & Time of Downloading of tender Dt. 19-03-2026 to Dt. 09-04-2026 up to 18.00 hrs.
2 Last Date & Time of online Submission of Dt. 09-04-2026 up to 18.00 hrs.
offer form / price bid
3 Physical submission of tender fee (Non refundable) On or Before Dt. 18-04-2026 on working days.
EMD & Other required tender document etc. (In
hard copy) by post only at V.N.South Gujarat
University, Udhna - Magdalla Road, Surat-395007.
4 Opening of offer form / price bid (on line) Dt. 20-04-2026 up to 11.00 hrs. onwards if possible.
Note : Tender Fee will be accepted in DD only & for Bid Security (EMD) in form of DD / FDR / Bank Guarantee.
The Veer Narmad South Gujarat University reserves the right to reject any or all tenders or part of it which in
the opinion of Veer Narmad South Gujarat University.
UNIVERSITY ENGINEER
VEER NARMAD SOUTH GUJARAT UNIVERSITY
NATIONAL COMPETITIVE BIDDING
E-TENDER NOTICE
1. The Veer Narmad South Gujrat University,Surat invites bids for the construction of works detailed in the
table. The bidders may submit bids for any or all of the following works.
Package Name of work Approximate Bid security Cos Period of Class of
No. value of (EMD) t of completion Registration/
Works (Rs.) docu Category of
(Rs.) ment contactor if
1 Proposed Repair, 14,57,75,718.03 14,58,000.00 21,240.00 09 Months “AA” Class & Sp.
Renovation & Up (18,000.00 (Excluding Building Cat. I
gradation Works of the Tender 3 months of
Convention Hall Building Fee + Monsoon
at VNSGU Campus, Surat 3,240.00 period )
at Veer Narmad South GST)
Gujarat University,
Udhna-Magdalla Road,
2. Prospective/Interested bidder may download the Bid Documents from website
https://www.tender.nprocure.com free of cost till the Time and Date as mentioned on online NIT at website
https://www.tender.nprocure.com.
3. However, Bidder who is submitting the Bid Online will have to pay the Bid Document Fee / Tender Fee
through Demand Draft only of any Schedule Bank payable at Veer Narmad South Gujrat University,
Surat and in favour of ‘Registrar, Veer Narmad South Gujarat University, Surat’. Once the Bid is received
online, Bid Document / Tender Fee will not be refundable.
The Demand Draft for Bid Document / Tender fee and FDR / Bank Guarantee against Bid Security / EMD
shall be submitted in electronic format through online (by scanning) while uploading the bid, this
submission shall mean that bid document / tender fee and Bid Security / EMD has been received.
Accordingly, the offer of only those shall be opened whose Bid Document / Tender Fee and Bid Security /
EMD have been received electronically. However, for the purpose of realization of Demand Draft, and FDR
/ Bank Guarantee bidder shall send the same in original through R.P.A.D. so as to reach to Registrar, Veer
Narmad South Gujarat University, Surat within 7 Days from the last day of bid submission.
Penetrative action for not submitting Demand Draft / FDR / Bank Guarantee in original to Executive
Engineer / Tender Inviting Authority by bidder shall be initiated.
4. Bids received online, will be opened on the time, date and place as specified in the online NIT at website
https://www.tender.nprocure.com in the presence of the bidders or their authorized representatives, who
wish to remain present.
If the office happens to be closed on the day of opening of the bids as specified, the bids will be opened on
the next working day at the same time and venue.
5. A pre bid meeting will be held on d a t e m e n t i o n e d at the office of Registrar, Vnsgu , Udhna Magdalla
Road, Surat to clarify the issues and to answer questions on any matter that may be raised at that stage
as stated in clause 9.2 of ‘instructions to Bidders’ of the bidding documents. if required.
6. #Bid Security (EMD) is equal to 1% of Estimated Amount put to bid / tender and should be rounded off to
the next thousand rupees.
7. Other Information is as under:
A. Agencies can prepare and edit their offers a number of times before the end of the tender submission
date and time. After the tender submission date and time, the bidder cannot modify / edit / withdraw their
submitted offer in any case. No written or online request in this regard shall be granted.
B. Offers in physical form will not be accepted in any case.
C. Demand Draft purchased by the other then bidder and issued after the last date of submission of Bids, will
not be considered or accepted.
D. The cost incurred by the contractor for this offer for clarification or attending discussion,
conferences or site visits will not be reimbursed by the Employer or Engineer-in-Charge.
E. Conditional tender shall not be accepted.
F. Any changes, addition, alternation made in the prescribed form attached with tender are liable
to be rejected.
G. Any change in format or conditional Bank Guarantee will not be accepted and the bidder will
be considered non-responsive.
H. All the bidders are instructed to fill in information strictly in accordance with the format given
in the checklist /qualification document / tender document.
I. It is mandatory for the bidders to supply each and every information as asked strictly in
electronic format at appropriate places only.
J. Blank / insufficient information shall be treated as nil information and shall result in
disqualification.
K. Even if the bidder has been qualified in a similar or larger size of project in the past, it shall
not be deemed to be a ground / reason for not giving required information for this work / bid.
L. Information supplied for earlier projects shall not be considered while evaluation of this bid.
The Government will not ask for any other information, unless it is found absolutely necessary
by the competent authority.
M. If found necessary, the contractor will be intimated for negotiation.
SET OF DOCUMENTS TO QUALIFY THE APPLICANT / CONTRACTOR:
INSTRUCTIONS TO THE APPLICANT / CONTRACTOR:
A. The qualification process shall lay high emphasis on the ability and competency of applicants
/ contractors to do high quality work within the given time schedule.
B. The work certificate of sub-contract shall not be considered for evaluation.
C. All the information shall have to be filled in the prescribed statement, wherever
D. All the details, required in the prescribed statement, shall have to be duly filled up. No information
shall be left out. Relevant item without required information shall not be considered for evaluation.
E. All the required attachments shall have to be invariably attached. Relevant item, without
required attachment, shall not be considered for evaluation.
F. VEER NARMAD SOUTH GUJARAT UNIVERSITY reserves the right to accept or reject any one or
all of the offers / tenders without giving any reasons thereof.
G. VEER NARMAD SOUTH GUJARAT UNIVERSITY reserves the right to restrict the list of qualified
applicants to any number deemed suitable by it. Decision of the VEER NARMAD SOUTH GUJARAT
UNIVERSITY for qualifying the applicants shall be final and binding to all.
H. All information has to be typed in English language. All pages of the qualification documents have
to be initialed by the applicant. All corrections, erasures or overwriting therein, have to be initialed
by the applicant / contractor.
I. Conditional Bid shall be laible for rejection without any prior notice.
J. Application received from a joint venture / consortium shall not be considered.
The tenderers are specifically informed that the "Project Management Consultancy" &
"Third Party Inspection" shall be carried out by the agency appointed by the University. All the
instructions given by the said agency shall have to be followed and carried out by the successful
tenderer. During the execution at any time the University may carry out Quality check/s & Test/s
as per applicable IS code & the payment shall be released only subject to satisfactory results of
the check/s & Test/s. The opinion of the Consultant shall be considered for the results of Check/s
Signature of the Applicant with full address
INFORMATION REGARDING THE APPLICANT / CONTRACTOR:
A. Name of the applicant / contractor :
B. Address of the applicant / contractor :
C. Phone nos. :
D. Registration no., date & authority :
E. Name & particulars of the authorized representative for the :
details furnished hereunder
F. Type of organization, including particulars of Proprietor /
Partners / Directors: (Sole Proprietorship, Partnership,
Private Ltd., Co-Operative Body, etc. )
(Attested copy of deeds of Memorandum of Association shall
G. P.F. Registration Certificates :
H. I. T. PAN no. :
I. GST Registration No. :
J. Name and address of the bankers :
1.Bank Facilities available
- Letters of Credit
- Solvency Certificate
Signature of the Applicant with full address
Proposed Repair, Renovation & Up gradation Works of
(1) General Description of the Work :
the Convention Hall Building at VNSGU Campus, Surat
at Veer Narmad South Gujarat University.
(2) Estimated Cost : Rs. 14,57,75,718=030
(3) Earnest Money Deposit :
(4) Security Deposit
(i) Initial Security Deposit : 5% of the Tender Value
(ii) To be deducted from R. A. Bills : 5% of each R. A. Bill amount.
(5) Time allowed for the completion of :
12 months (Excluding 3 months of Monsoon period )
the Work from date fixed in Work
Order Letter to commence
(6) Defect Liability Period : For original building works the defect liability period will
be 4 Year or elapse of 04 monsoon period following date of
possession of building taken over by user agency following
the certified date of completion, whichever is later. For the
purpose of deciding the monsoon period, the 30th
September shall be treated as the date.
(7) Construction Cess will be :- 1% OF TOTAL BILL AMOUNT
deducted from the bill Amount
(8) Water charges :- 1% of Bill Amount (Only applicable when water supply provide by
deducted from the University. Water charge not applicable in case of University not
bill amount provide Water, in this circumstance contractor must be arrange sweet
(9) Testing of Material :- It should be specifically noted that the material brought by the
Charges contractor at site of work and Cube Testing and other testing at the
approved laboratory as per direction of the Engineer-in-charg. All the
charges for the Transport and Testing of Material and Sample shall
have to be borne by the Contractor, The Frequency of the testing such
material and sample shall be accordance to R & B Department rules
OR directed by Engineer-in-charrg. or 1% charge deducted from the
The Tenderer must understand clearly the Rate / Price quoted with
(10) TAXES AND :-
considering all Taxes. & Applicable GST paid separately by University.
Any other Taxes / duties obtained for the Work from any source, shall
be borne by the Contractor. No 'D' or 'C' Form shall be supplied by the
VNSGU Moreover, the Contractor shall have to bear any revision of all
applicable taxes and / or duties implemented by the Authority from
time to time, and no extra payment shall be made for the revision
of taxes and / or duties on Materials : / work.
VEER NARMAD SOUTH GUJARAT UNIVERSITY
ELIGIBILITY / TECHNICAL PROPOSAL
ELIGIBILITY CRITERIA PART - A & PART - B
Eligibility Criteria of Proposed Repair, Renovation & Up gradation Works of the Convention Hall Building at
VNSGU Campus, Surat at VNSGU
The Bideer have to must be submit the following documents as seen in E Format & As per bellow Details in
Part-A & Part-B Necessary Physical Documents copy also submit as per Minimum Eligibility Criteria along
with Pre Qualification criteria requirements.
PRE-QUALIFYING CRITERIA OF THE BIDDER, PART - A
1. Registration Certificate – “AA” Class & Sp. Building Cat. I.
2. Bank Solvency Certificate of Rs. 2,91,55,143=61 ( Current Financial Year)
4. GST Registration No.
5. Tender Fee – DD of Rs. 21,240=00 (Rs.18000=00 Tender Fee + Rs. 3240=00 GST 18%)
6. EMD – DD / FDR / Bank Guarantee of Rs. 14,58,000=00
7. Work Experience Certificate:
Experience of having successfully completed similar works during the last 05 years, ending on the last
day of the month previous to the one in which bids are invited i.e. from 31.12.2020 to 01.01.2026.
a. One similar completed works costing not less than the amount equal to 40% of the Estimated Cost
"Similar work" shall mean R.C.C. framed structure/ building works such as Standalone Auditorium,
Auditorium built in Institutional Buildings / Performing Arts Center / Convention Center / Movie Theatre /
Multiplex in Govt. (Central and States)/ Semi Govt./ PSUs/ Govt. undertaking/ Govt. companies/ IITs, IIMs
along Rehabilitation work.
Experience Satisfactory performance of "Similar work".
In projects where the executed “Similar work/s” is part of institutional buildings, the work done amount for
the part of the "Similar work" will only be considered as bidder's experience. Submitted certificates must
indicate the separate amount and details of the "Similar work" in such cases.
The above executed project/s should have Civil, Plumbing, Sanitation, Electrical, ELV, Fire Detection &
Fighting, Air Conditioning, Interior Design, Acoustics, Auditorium Chairs, Landscaping / Rain Water
Harvesting, Audio Video Components such as Speakers, DSP, Microphones, Amplifiers, Switching
System, AV Over IP System, Projection & Screen integration, Video Display & Recording Systems,
Performance stage lighting and Stage Drapery/Curtain control systems including Stage Rigging, Stage
Lighting Fixtures, Controllers, Curtain rigs & mounting, Motors & controllers, DMX programming, FR
Fabrics, and all other associated works and services
Exerience in similar works as mentioned here in 3.1 as a joint venture / consortium / sub-contractor will
not be considered, unless explicitly stated otherwise at someplace in the tender document. (with
considering approximate Estimated cost of Rs. 14,57,75,718=03) (Valid Form 3(a) or Authentic Valid
Experience Certificate must be scanned)
8. Turn Over Certificate :
1. Achieved a minimum annual financial turnover completed in all classes of civil construction work
in any one year over the last five financial years of the Annual Value of contract / contracts.
Annual Turn Over of any one of the last five financial years. i.e. from 2020-21 to 2024-25 updated
to current financial year shall be Value of minimum Rs. 7,28,87,859=02 (Please submit CA
2. For arriving at updated value, turnover of any financial year shall be multiplied by the
enhancement factor corresponding to that year.
No. Year Financial Year Multiplying Factor
1 Base (Year of inviting Tender) 2025-26
9. Bid Capacity Calculation Certificate: Bid Capacity Calculation sheet provided by the Bidder ( Certificate by
the CA if possible not mendetory)
10. Declaration of Litigation History
Date : Seal & Signature of the Contractor
PRE-QUALIFYING CRITERIA OF THE BIDDER, PART -B
Note : Financial Criteria : 1 (1.1), Registration : 2 (2.1 & 2.2) Pl. submit as per Part-A Sr.
SR. CRITERIA DOCUMENTS REQUIRED
1.0. Financial:
Copy of certificate from Chartered
Average Annual financial turnover during the last 5 Accountant along with copy of Balance
1.1 years, ending 31.03.2025, shall be at least 50% of the Sheets.
estimated cost. & Statement – A.
2.0 Registration:
The bidder shall have “AA” class Registration as Civil
Works Contractor with PWD/CPWD of Gujarat State,
Municipal Corporation(s), Central Government etc. /
2.1 equivalent registration as civil works contractor of any Valid Registration Certificate.
other state government capable of executing works of
unlimited value.
Registration as Civil Works Contractor with Special
Categary-1 (Buildings) of Gujarat State / equivalent to
2.2 Special Categary-1 (Buildings) in other State capable of Valid Registration Certificate.
executing work of unlimited value.
The bidder shall have “C” Class with State or Central Govt.,
or GWSSB and Registration as approved contractor in “C”
2.3 Valid Registration Certificate
class R & B Electric Division with valid Electrical Licence.
Power of Attorney, Partnership Deed or Registration
2.4 Relevant document shall be submitted
3.0 Relevant Experience:
Experience of having successfully completed similar (A) Copies of completion certificate
works during the last 05 years, ending on the last day of issued from Head of the concerned
the month previous to the one in which bids are invited office clearly indicating name of
i.e. from 31.12.2020 to 01.01.2026. work, nature of work (different
works completed), start date,
b. One similar completed works costing not less completion date, work done amount
than the amount equal to 40% of the Estimated and remarks of successful
Cost completion of the work.
"Similar work" shall mean R.C.C. framed structure/
building works such as Standalone Auditorium,
Auditorium built in Institutional Buildings / Performing (B) Statement – B.
Arts Center / Convention Center / Movie Theatre /
Multiplex in Govt. (Central and States)/ Semi Govt./ PSUs/
Govt. undertaking/ Govt. companies/ IITs, IIMs along
Rehabilitation work.
Experience Satisfactory performance of "Similar work".
In projects where the executed “Similar work/s” is part of
institutional buildings, the work done amount for the part
of the "Similar work" will only be considered as bidder's
experience. Submitted certificates must indicate the
separate amount and details of the "Similar work" in such
The above executed project/s should have Civil, Plumbing,
Sanitation, Electrical, ELV, Fire Detection & Fighting, Air
Conditioning, Interior Design, Acoustics, Auditorium
Chairs, Landscaping / Rain Water Harvesting, Audio
Video Components such as Speakers, DSP,
Microphones, Amplifiers, Switching System, AV Over
IP System, Projection & Screen integration, Video
Display & Recording Systems, Performance stage
lighting and Stage Drapery/Curtain control systems
including Stage Rigging, Stage Lighting Fixtures,
Controllers, Curtain rigs & mounting, Motors &
controllers, DMX programming, FR Fabrics, and all other
associated works and services
Experience in similar works as mentioned here in 3.1 as a
joint venture / consortium / sub-contractor will not be
considered, unless explicitly stated otherwise at
someplace in the tender document.
3.2 Enhancement Factors
Following enhancement factors shall be used to calculate
the effective work done amount as on date for similar
completed works as mentioned in 3.1 :
Year of completion of Enhancement
similar work Factor
4.0 Other details:
Blacklist: The bidder shall have to submit an
The BIDDER shall note that in case the BIDDER is affidavit on a non-judicial stamp paper of
blacklisted / stated as defaulter / barred from Rs.300/- that the bidder is not blacklisted
participating in Bids by any of the government agencies / / became defaulter / barred or banned
semi government agencies or any other equivalent from executing further works during last
agencies during the last 5 years, then in that case, the years.
BIDDER shall be disqualified and shall not be allowed to Punitive actions shall be taken against the
participate in the Bidding process, though BIDDER bidder who submits false or misleading
satisfies all the qualification conditions mentioned above. information, which may include the
In this regard, the decision of the Surat Municipal disqualification from this tender process
Corporation shall be final and binding to BIDDER. to the prevention of participating in future
tenders of V.N.S.G.U..
Works on Hand & Litigation:
The BIDDER, including any Partner / Director, shall Statement – C.
provide details of all their ongoing projects along with (Submit declaration on letter pad of the
stage of litigation, if any, against the Employer / bidder's firm even in case of no litigation)
5.0. Special experience for Roofing:
Experience of having executed long span Steel / Metal The bidder shall submit relevant
Truss / Roofing system having a span of minimum 21.00 documents with proof of execution of such
5.1 meters at various heights consisting of double / triple a system.
6.0. Special Experience:
6.1. Building Structural Restoration & Renovation works:
The bidder shall have proven and demonstrable The bidder is expected to have the specific
experience in building repair, restoration, and experience of Structural Repair &
renovation works, particularly in projects involving Restoration of RCC structures of the size
careful, controlled, and methodical dismantling of and value of minimum 30%, of the total
existing civil components in occupied or sensitive public project estimate.
Such experience shall include, but not be limited to, The experience certificate(s) submitted
judicious breaking, removal, and reinstatement of the by the bidder shall clearly indicate the
following: nature of the work, scope of
• Existing flooring systems and finishes restoration/renovation, value of work,
• Waterproofing treatments and associated period of execution, and successful
substrates completion, and shall be issued by a
competent authority.
• Infill brick masonry and non-load-bearing walls
• Plaster, screed, and allied building components OR
The bidder shall also possess experience in repair,
rehabilitation, and strengthening of RCC structural
The bidder shall submit an MOU on a non-
members, including beams, slabs, columns, and
judicial stamp paper of Rs.300/- with any
staircases, wherever required, using approved repair
other Specialized agency for Structural
techniques, compatible materials, and standard Repair & Restoration to carry out the
engineering practices, ensuring no adverse impact on works in this project. The bidder must
the existing structural stability.
submit the credentials and certified work
The bidder’s experience shall specifically demonstrate
completion certificates of said agency.
the ability to:
The agency shall independently fulfill
• Execute restoration and renovation works in a all PQ criteria as mentioned.
phased and non-destructive manner
• Protect existing structural elements and
services during dismantling operations
• Maintain safety, serviceability, and continuity of
the building during execution
• Adhere to relevant IS Codes, R&B & PWD
norms, Tender Specifications, and applicable
statutory norms.
6.2. Acoustic Interior Execution Works:
The bidder shall have proven and demonstrable The bidder is expected to have the specific
experience in execution of acoustical interior works experience of SITC (Supply, Installation,
for auditoriums, theatres, lecture halls, or similar Testing & Commissioning) of Acoustical
public assembly spaces, involving large seating Interior related works.
capacity and performance-oriented environments. The experience certificate(s) submitted
Such experience shall include, but not be limited to, by the bidder shall clearly indicate the
design-coordinated execution, supply, installation, type of facility (auditorium / theatre /
and finishing of specialized acoustical components, similar), seating capacity, scope of
carried out in accordance with approved drawings, acoustical works executed, value of
specifications, and performance requirements. The scope work, period of execution, and
of works shall typically include: successful completion, and shall be
• Wall and ceiling acoustic treatment systems issued by a competent authority.
• Sound-absorptive, reflective, and diffusive
• Acoustical false ceilings, baffles, and clouds
The bidder shall submit an MOU on a non-
• Timber, perforated, fabric-wrapped, or judicial stamp paper of Rs.300/- with any
composite acoustic panel systems
other specialized agency, specializing in
• Integration of acoustical elements with lighting, the Acoustic Interior Execution Works
HVAC, AV systems, and architectural finishes to carry out the works in this project. The
The bidder shall possess experience in executing bidder must submit the credentials and
acoustical works that require precision installation, certified work completion certificates of
strict tolerances, and performance sensitivity, said agency as stated above.
ensuring compliance with specified acoustic criteria The agency shall independently fulfill
such as reverberation time, sound clarity, speech all PQ criteria as mentioned.
intelligibility, and noise control, as applicable to
auditorium use.
The bidder’s experience shall demonstrate the capability
• Execute acoustical interiors in coordination with
architectural, structural, electrical, HVAC,
and AV services
• Maintain dimensional accuracy, alignment, and
finish quality critical to acoustic performance
• Handle works at height, large-span ceilings, and
complex geometries typical of auditorium
• Protect and preserve installed acoustic systems
during phased execution
All works shall be executed in accordance with relevant
IS Codes, NBC provisions, R&B norms & Tender
Specifications, and accepted acoustical engineering
practices, including manufacturer-recommended
installation guidelines.
6.3. Fire Fighting system
The bidder is expected to also have the
specific experience of SETC (Supply,
Erection, Testing & Commissioning) of
Fire fighting system as per the current
norms, including sprinkler system, smoke
detectors, fire alarm system, automatic
pumping system, etc., Experience
certificate submitted by the bidder shall
indicate the specific experience of fire
Specific Experience of SETC (Supply, Erection, Testing &
fighting system.
Commissioning) of Fire fighting system as per the current
norms, including sprinkler system, smoke detectors, fire
alarm system, automatic pumping system, etc.
The bidder shall submit an MOU on a non-
judicial stamp paper of Rs.300/- with any
other fire fighting agency to carry out the
FPS & FAS works in this project. The
bidder must submit the credentials and
certified work completion certificates of
The agency shall independently fulfill
all PQ criteria as mentioned.
6.4. Performance Stage Light & Motorized Curtain Control system
The bidder shall have proven and demonstrable The bidder is expected to also have specific
experience in Supply, Installation, Testing, and experience of SETC (Supply, Erection,
Commissioning (SITC) of performance stage lighting Testing & Commissioning) of Performance
systems and motorized curtain control systems for Stage Lighting & Motorized Curtain
auditoriums, theatres, cultural halls, or similar public Control Systems.
assembly facilities of large seating capacity.
Such experience shall include, but not be limited to, The experience certificate(s) submitted
design-coordinated execution, supply, installation, by the bidder shall clearly indicate the
integration, testing, and commissioning of specialized type of facility (auditorium / theatre /
stage lighting and curtain control systems, executed in similar), seating capacity, scope of
accordance with approved drawings, technical stage lighting and curtain control
specifications, and performance requirements. The scope systems executed, value of work, period
of works shall typically include: of execution, and successful SITC, and
• Performance stage lighting fixtures including shall be issued by a competent authority.
LED profile lights, Fresnel lights, PAR lights,
wash lights, and effect lighting OR
• Lighting control systems, dimmer racks, DMX-
based controllers, consoles, and associated The bidder shall submit an MOU on a non-
software judicial stamp paper of Rs.300/- with any
other specialized agency / OEM to carry
• Stage lighting trusses, rigging interfaces,
out the special works in this project. The
cabling, patch panels, and power distribution
bidder must submit the credentials and
certified work completion certificates of
• Motorized main curtains, masking curtains, said agency.
border curtains, and associated track and drive
The agency shall independently fulfill
all PQ criteria as mentioned.
• Curtain motors, control panels, limit switches,
safety interlocks, and manual override systems
The bidder shall possess experience in executing stage
lighting and curtain control works that require precision
installation, system synchronization, and operational
reliability, ensuring compliance with specified
illumination levels (lux), uniformity, control
response, operational safety, and performance
sequencing, suitable for live performances and multi-use
auditorium operations.
The bidder’s experience shall specifically demonstrate
the capability to:
• Achieve specified stage and performance
lighting levels, uniformity ratios, and color
rendering requirements
• Execute safe and synchronized operation of
motorized curtain systems with smooth start–
stop motion, accurate limit setting, and fail-safe
• Integrate lighting and curtain control systems
with AV systems, stage management controls,
and electrical infrastructure
• Ensure compliance with electrical safety
norms, earthing requirements, load
calculations, and redundancy provisions
• Carry out comprehensive testing, programming,
and commissioning, including operator training
and system handover
All works shall be executed in accordance with relevant
IS Codes, NBC provisions, CPWD Specifications,
applicable electrical standards, and manufacturer-
recommended installation practices, ensuring
operational safety and performance reliability.
6.4.a. Authorization from O.E.M. :
OEM: Manufacturer’s Authorization Letter, Authorization letter, duly signed and
authorizing the “Bidder / Specialized Agency stamped on the Official Letter head of the
with which the primary bidder has executed O.E.M.
M.O.U.” Supply, Install, Test & Commission and
perform comprehensive maintenance of its
equipment, is mandatory for all major
components such as Stage Rigging, Stage
Lighting Fixtures, Controllers, Curtain rigs &
mounting, DMX modules, Fabrics.
Bid without authorization letter will be rejected
without any further notice.
The Authorized Bidder must have direct operations
presence in India for the last 3 years minimum.
(Documentary evidence) self-declaration
The OEM must have dedicated Service / Support centre in shall include all contact details.
India through directly owned service centre / their
authorized distributors / channel partners, in India.
Minimum Qualification Criteria for the
6.4.b. Proposed Original Equipment Manufacturer
(OEM) of Stage Lighting Luminaires:
ISO Certification. (ISO 9001 & 2015, ISO 14001:2015 & ISO Copy of ISO certificates
Genuity of branded products. Manufacturer Declaration for all products
to be attached stating the same.
Proof of Establishment and established business in India Declaration from OEM to be attached.
of the luminaire brand:
Minimum 7 years with RGB LED luminaire products, Own
R&D facility & a manufacturing / dedicated vendor set up
Compliance of Technical Specification: Mandatory for Compliance certificate for each product.
Stage Lighting equipment.
Mandatory Certification: BIS approval and other Certifications to be submitted.
certificates (CE/FCC/UL/LM79 and LM80)
OEM’s minimum mandatory in-house plant & Machinery: Self-Attested Documentary proof to be
- SMT Machine in house for LED Mounting for SMD LED’s attached.
followed by Reflow Oven and Drying.
- Powder Coating facility with Gun.
- Torque machines.
- Grinding and Bench Drill.
6.5. Audio Visual System
The bidder shall have proven and demonstrable The bidder is expected to also have specific
experience in Supply, Installation, Testing, and experience of SETC (Supply, Erection,
Commissioning (SITC) of complete Audio-Visual (AV) Testing & Commissioning) of Audio-Visual
systems for auditoriums, theatres, lecture halls, Systems.
convention centres, or similar large public assembly
facilities. The experience certificate(s) submitted
Such experience shall include, but not be limited to, by the bidder shall clearly indicate the
design-coordinated execution, supply, installation, type of facility (auditorium / theatre /
integration, testing, and commissioning of specialized similar), seating capacity, scope of AV
AV systems, executed in accordance with approved systems executed, value of work, period
drawings, technical specifications, and performance of execution, and successful SITC, and
requirements. The scope of works shall typically include: shall be issued by a competent authority.
• Professional sound reinforcement systems
including main speakers, sub-woofers, front-fill OR
and delay speakers
• Audio processing equipment such as mixers, The bidder shall submit an MOU on a non-
digital signal processors (DSP), amplifiers, and judicial stamp paper of Rs.300/- with any
audio interfaces other specialized agency / OEM to carry
out the special works in this project. The
• Wireless and wired microphones including
handheld, lapel, podium, and conference bidder must submit the credentials and
certified work completion certificates of
microphone systems
• Video display systems including LED video walls, The agency shall independently fulfill
laser / DLP projectors, projection screens, and
all PQ criteria as mentioned.
confidence monitors
• Video processing, switching, routing, and control
• Centralized AV control systems, touch panels,
automation software, and interface with stage
lighting and acoustical systems
• AV racks, structured cabling, termination panels,
power conditioning, and earthing systems
The bidder shall possess experience in executing AV
systems that require high fidelity, system integration,
signal integrity, and operational reliability, ensuring
compliance with specified acoustic performance,
sound pressure levels (SPL), speech intelligibility,
video resolution, brightness, contrast, and latency
requirements, suitable for multi-use auditorium
The bidder’s experience shall specifically demonstrate the
• Achieve specified sound coverage uniformity,
clarity, and intelligibility across the seating
• Deliver video display systems meeting
specified resolution, luminance, and viewing
angle requirements
• Integrate AV systems seamlessly with
acoustical treatments, stage lighting systems,
curtain controls, and building services
• Ensure proper system tuning, calibration, and
equalization, including feedback control and
noise mitigation.
• Carry out comprehensive testing,
commissioning, and functional
demonstrations, including operator training
and system documentation.
All AV works shall be executed in accordance with
relevant IS Codes, NBC provisions, Tender
Specifications, applicable electrical and low-voltage
system standards, and manufacturer-recommended
installation practices, ensuring safety, performance, and
long-term reliability.
6.5.a. Authorization from O.E.M. :
OEM: Manufacturer’s Authorization Letter, Authorization letter, duly signed and
authorizing the “Bidder / Specialized Agency stamped on the Official Letter head of the
with which the primary bidder has executed O.E.M.
M.O.U.” to Supply, Install, Test & Commission and
perform comprehensive maintenance of its
equipment, is mandatory for all major
components such as Audio Components such as
Speakers, DSP, Microphones, Amplifiers, Switching
System, and Projection system.
Bid without authorization letter will be rejected
without any further notice.
The Authorized Bidder must have direct operations
presence in India for the last 3 years minimum.
(Documentary evidence) self-declaration
The OEM must have dedicated Service / Support centre shall include all contact details.
in India through directly owned service centre / their
authorized distributors / channel partners, in India.
6.5.b. Certification – AVIXA
Copy of membership certificate in the
AVIXA (Audio visual and Integrated Experience
name of the Bidder / Specialized Agency
Association) Membership.
with which the primary bidder has
executed M.O.U.”
6.5.c. Genuity of branded products:
All products supplied and installed should be original or Manufacturer Declaration for all products
the O.E.M. Branding. to be attached stating the same.
6.5.d. Certified Technology Specialist (CTS)
Self-Declaration from bidder with
Bidder should have at least one (Certified Technology
Certification, Engineer Profile, Salary
Specialist-Design) CTS-D/CTS-I and one CTS i.e.
statement of in-house / project specific
Certified Technology Specialist-General (AVIXA/
partnership MOU to be attached to be
Infocomm) Certified Engineer on their team.
6.5.e. Dante Certification:
Self-Declaration from bidder with
Mandatory to have Minimum 1 certified professionals on
Certification, Engineer Profile, Salary
team, in-house /in partnership with via MOU (i.e. on
statement of in-house / project specific
Payroll) with Dante Level 3 Certification for the OEM
partnership MOUto be attached.
equipment being used.
6.6. Special Wooden Stage Flooring Execution Works:
The bidder shall have proven and demonstrable The bidder is expected to also have specific
experience in execution of performance-grade experience of SITC (Supply, Installation,
wooden flooring systems for auditorium stages, Testing & Commissioning) of Performance
theatres, cultural halls, or similar public performance Stage Wooden Flooring Works.
facilities, designed for live performances, rehearsals, and
multi-use stage activities. The experience certificate(s) submitted
Such experience shall include, but not be limited to, by the bidder shall clearly indicate the
design-coordinated execution, supply, installation, type of facility (auditorium / theatre /
finishing, and protection of specialized stage wooden similar), stage area and flooring type,
flooring systems, executed in accordance with approved scope of wooden flooring works
drawings, technical specifications, and performance executed, value of work, period of
requirements. The scope of works shall typically include: execution, and successful completion,
• Solid hardwood or engineered wooden stage and shall be issued by a competent
flooring systems authority.
• Sub-floor systems including sleepers, battens,
resilient pads, and levelling layers
• Shock-absorbing, sprung, or semi-sprung
flooring assemblies, where specified
• Moisture barriers, acoustic underlays, and The bidder shall submit an MOU on a non-
vibration isolation layers
judicial stamp paper of Rs.300/- with any
• Surface finishes including matt / semi-matt other specialized agency to carry out the
lacquers, oils, or performance-grade coatings special works in this project. The bidder
The bidder shall possess experience in executing stage must submit the credentials and certified
wooden flooring works that require high precision, work completion certificates of said
dimensional stability, and performance sensitivity, agency.
ensuring compliance with specified load-bearing The agency shall independently fulfill
capacity, impact resistance, slip resistance, shock all PQ criteria as mentioned.
absorption, and acoustic behaviour, suitable for stage
performances, movement, and equipment loads.
The bidder’s experience shall specifically demonstrate
the capability to:
• Achieve uniform level tolerances and seamless
joint alignment across large stage areas
• Ensure adequate structural strength and
durability to withstand dynamic loads from
performers, stage equipment, and movable sets
• Control moisture content, thermal
movement, and expansion joints to prevent
warping, creaking, or surface failure
• Integrate flooring systems with stage lighting
fixtures, trap doors, service access panels,
and edge details
• Execute finishing works that provide consistent
surface texture, glare control, and performer
All works shall be executed in accordance with relevant
IS Codes, NBC provisions, Tender Specifications,
applicable timber and flooring standards, and
manufacturer-recommended installation practices,
ensuring safety, durability, and long-term performance.
INSTRUCTIONS TO BIDDERS (ITB)
Instructions to Bidders
Table of Clauses:
Sr. Description Page
1. Scope of Bid.
2. Source of Funds.
3. Eligible Bidders.
4. Qualification of the Bidder.
5. One Bid per Bidder.
6. Cost of Bidding.
B. Bidding Documents:
8. Content of Bidding Documents.
9. Clarification of Bidding Documents.
10. Amendment of Bidding Documents.
C. Preparation of Bids:
11. Language of Bid.
12. Documents Comprising the Bid.
13. Bid Prices.
14. Currencies of Bid and Payment.
15. Bid Validity.
16. Bid Security.
17. Alternative Proposals By Bidders.
18. Format and Signing of Bid.
D. Submission of Bids:
20. Deadline for Submission of Bids.
22. Modification and Withdrawal of Bids.
E. Bid Opening and Evaluation:
23. Bid Opening.
24. Process to be Confidential.
25. Clarification of Financial Bids.
26. Examination of Bids and Determination of Responsiveness.
29. Evaluation and Comparison of financial Bid.
F. Award of Contract:
32. Award Criteria.
33. Employer’s Right to accept any bid and to Reject any all Bids.
34. Notification of Award and Signing of Agreement.
35. Performance Security.
36. Advance Payment & Security.
37. Correct or Fraudulent Practices.
SCOPE OF TENDER :
Salient features and details of the Work, for which applications are invited, are as under :
Sr. Name of the Work Total estimated cost Period of
No. including Steel & Cement completion
01. Proposed Repair, Renovation & Rs. 14,57,75,718=03 09 Months
Upgradation Works of the Convention Hall (Excluding
Building at VNSGU Campus, Surat at Veer months of
Narmad South Gujarat University, Udhna- Monsoon period )
Magdalla Road, Surat.
Work shall be executed according to General Conditions of Contract and detailed Technical
Specification as per Technical Bid - Volume-I.
1. Scope of Bid
1.1 The Employer (Named in Appendix to ITB) invites bids for the Construction of works (as
defined in these documents and referred to as ‘the works”) detailed in the table given in IFB.
The bidders may submit bids for any or all of the works detailed in the table given in IFB.
1.2 The successful bidder will be expected to complete the works by the intended completion
date specified in the Contract data.
1.3 Throughout these bidding documents, the terms ‘bid’ and ‘tender’ and their derivatives
(bidder/ tenderer, bid / tender, bidding/ tendering, etc.) are synonymous.
2. Source of Funds
2.1 The expenditure on this project will be met from the budget of Govt. of Gujarat
/ Govt. of India for centrally sponsored projects.
3. Eligible Bidders
3.1 This Invitation for Bids is open to all eligible bidders.
3.2 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a statement
that the Bidder is neither associated, nor has been associated, directly or indirectly, with the
consultant or any other entity that has prepared the design, specifications, and other documents
for the Project or being proposed as Project Manager for the Contract. A firm that has been
engaged by the Employer to provide consulting services for the preparation or supervision of
the works, and any of its affiliates, shall not be eligible to bid.
4. Qualification of the Bidder
4.1 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a preliminary
description of the proposed work method and schedule, including drawings and charts, as
necessary. The proposed methodology should include a program of construction backed with
equipment planning and deployment duly supported with broad calculations and quality
assurance procedures proposed to be adopted justifying their capability of execution and
completion of work as per technical specifications, within stipulated period of completion.
4.2 QUALIFICATION CRITERIA:
Qualification will be based on Applicant’s meeting all the following minimum pass/ fail criteria regarding
the Applicant’s general and particular experience, personnel and equipment capabilities and financial
positions, as demonstrated by the applicant’s responses in the forms attached to the letter of
application ( specified requirement for joint ventures are given under para 4.6 below ) Subcontractors
experience and resources shall not be taken in to account in determining the applicants compliance with
the qualifying criteria
To qualify, the applicant must submit all required data as requested in the table below:
4.2.1. Base year and Escalation
The base year shall be taken as Current financial year
Following enhancement factors will be used for the costs of works executed and the financial
figure to a common base value for works completed in India.
Year Financial Year Multiplying factor
Base year of inviting tender 2025-2026
Applicants should indicate actual figures of costs and amount for the works executed by them
without accounting for the above-mentioned factors.
In case the financial figures and value of completed works are in foreign currency the above
enhanced multiplying factors will not be applied. Instead, the current market exchange rate
(State Bank of India BC Selling rate as on the last date of submission of the bid) will be applied
for the purpose of conversion of the amount in foreign currency into India rupees.
4.2.2 The Technical Personnel:
Technical qualifications & experience of 5 key personnel from amongst proprietors or partners &
experienced senior technical staff in the organization shall be submitted by the BIDDER as prescribed
in Statement "D" attached herewith.
Identifying the roles and responsibilities of the key personnel, envisaged / proposed during the
execution of the project, shall be submitted by the BIDDER as prescribed in Schedule "D" attached
4.2.3 The Construction Equipment & Machinery:
Details of workshop, machines, tools and plant held by the BIDDER, as prescribed in Statement "F",
shall be submitted by the BIDDER. Precise number / quantum of equipment has to be mentioned.
Area in S. M. of centering and shuttering materials shall be mentioned with tubular steel form work.
Cup lock staging equipment, coup link and other excavation / hoisting machinery held, shall be
4.2.4 The Construction Equipment & Machinery:
Quality control measures, adopted by the BIDDER, shall be described by the BIDDER as follows:
Documents &/or photographs, disclosing details of the followings shall be submitted by the BIDDER:
1. Laboratory set up–centrally / at site, association with any government approved laboratory.
2. Quality Control procedures and audits.
3. Documentation of procedures and test results.
4. Non-compliance reports, corrective measures and documentation.
4.2.5. Litigation History
The Applicant should provide accurate information on any litigation or arbitration resulting
from contracts completed or under execution by him over
the last five years. A consistent history of awards against the Applicant or any partner of a joint
venture may result in failure of the applicant.
4.2.6. Disqualification
Even though the applicants meet the above criteria, they are subject to be disqualified if they
Made misleading or false representation in the forms, statements submitted, and / or Record of
poor performance such as abandoning the work, rescinding of contract for which the reasons are
attributable to the non – performance of the contractor; consistent history of litigation awarded
against the applicant or financial failure due to bankruptcy. The rescinding of contract of a joint
venture on account of reasons other than non – performance, such as Most Experienced partner
of joint venture pulling out, court directions leading to breaking up of a joint venture before the
start of work, which are not attributable to the poor performance of the contractor will, however,
not affect the qualification of the individual partners.
4.2.7. Even though the bidders meet the above qualifying criteria, they are subject to be
disqualified if they have:
- Made misleading or false representation in the forms, statements and Attachments the
submitted in proof the qualification requirements; and / or
- Record of poor performance such as abandoning the works, not properly completing the
contract, inordinate delay in completion, litigation history, or financial failures etc.; and/ or
- Participated in the previous bidding for the same work and had quoted unreasonably high
bid prices and could not furnish rational justification to the employer.
4.3. Bid Capacity. (if required)
Applicants who meet the minimum qualification criteria will be qualified only if their available bid capacity
at the expected time of bidding is more than the total estimated cost of the works. The available bid capacity
will be calculated as under:
Assessed Available Bid Capacity = (2*A*N-B), where
A = Maximum value of work executed in any one year during the last five years (updated to the price level of
the year indicated in appendix) taking into account the completed as well as works in Progress.
B = Value at current price level of the existing commitments and ongoing works to be completed during the
N = Number of years prescribed for completion of the works for which the bids are invited.
Note :- In Case of joint venture, the available bid capacity will be applied for each partner to the extent
of his proposed participation in the execution of the work.
4.4. Even though the bidders meet the above qualifying criteria, they are subject to be disqualified if
Made misleading or false representation in the forms, statements and Attachments the submitted in
proof the qualification requirements; and / or
Record of poor performance such as abandoning the works, not properly completing the contract,
inordinate delay in completion, litigation history, or financial failures etc.; and/ or
Participated in the previous bidding for the same work and had quoted unreasonably high bid prices and
could not furnish rational justification to the employer.
5.0 One bid per bidder
Each bidder shall submit only one bid for one package. A bidder who submits or participates in
more than one bid (other than as a subcontractor or in cases of alternatives that have been
permitted or requested) will cause all the proposals with the bidder’s participation to be
6.0 Cost of Bidding
The bidder shall bear all costs associated with the preparation and submission of his Bid, and the
Employer will in no case be responsible and liable for those costs.
The Bidder, at the Bidder’s own responsibility and risk is encouraged to visit and examine the Site
of work and its surrounding and obtain all information that may be necessary for preparing the
Bid and entering into a contract for construction of the Works.
The costs of visiting the site shall be at the Bidder’s own expense.
B. BIDDING DOCUMENTS
8.0 Content of Bidding Documents
8.1 The set of bidding documents comprises the documents listed below and addenda
issued in accordance with Clause 10:
Section Particulars Volume No.
- Invitation for Bids
1 Instructions to Bidders I
2 Qualification Information, and other forms
3 Conditions of Contract
4 Contract Data
5 Technical Specifications II
6 Form of Bid III
7 Bill of Quantities
8 Securities and other forms
10 Documents to be furnished by bidder V
11 Standard Specification of Materials II
12 Detailed Technical Specifications
13 Additional Technical Specifications
14 List of Approved Makes
8.2. Volumes I, II, III and IV are available online and documents to be furnished by the bidder in
compliance to section 2 will be prepared by him and furnished as Volume- V in two parts (refer
8.3. The bidder is expected to examine carefully all instructions, conditions of contract, contract
data, forms, terms, technical specifications, bill of quantities, forms, Annexes and drawings in
the Bid Document. Failure to comply with the requirements of Bid Documents shall be at the
bidder’s own risk. Pursuant to clause 26 here of, bids which are not substantially responsive
to the requirements of the Bid Documents shall be rejected.
9.0 Clarification Bidding Documents
9.1 A prospective bidder requiring any clarification of the bidding documents may notify the
Employer in writing or through E-mail at the Employer’s address indicated in the invitation
to bid. The Employer will respond to any request for clarification which he received earlier
than 15 days prior to the deadline for submission of bids. Employer’s response will be
published on website including a description of the enquiry but without identifying its source.
9.2. Pre-bid meeting
9.2.1. The bidder or his official representative is invited to attend a pre-bid meeting which will take
place at the address, venue, time and date as indicated in the appendix.
9.2.2. The purpose of the meeting will be to clarify issues and to answer questions on any
matter that may be raised at that stage.
9.2.3. The bidder shall be required to submit any questions in writing or e-mail to reach the
Employer not later than 03 days before the meeting.
9.2.4 Minutes of the meeting, including the question raised (Without identifying the source of enquiry)
and the responses given will be published without delay on the tender website i.e.
www.tender.nprocure.com. Any modification of the bidding documents listed in sub-Clause
8.1 which may become necessary as a result of the pre-bid meeting shall be made by the
Employer exclusively through the issue of an Addendum pursuant to Clause 10 and not
through the minutes of the pre-bid meeting.
9.2.5. Non-attendance at the pre-bid meeting will not be a cause for disqualification of a bidder.
10.0 Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the bidding
documents by issuing addenda.
10.2. Any addendum thus issued shall be part of the bidding documents. The Employer will
assume no responsibility for the same.
10.3. To give prospective bidders reasonable time in which to take an addendum into
account in preparing their bids, the Employer may, at his discretion, extend as
necessary the deadline for submission of bids, in accordance with Sub-Clause
C. PREPARATION OF BIDS
11. Language of the Bid
1.1 All documents relating to the bid shall be in the English language.
12. Documents Comprising the Bid
12.1. The bid be submitted by the bidder as Volume V of the bid document (refer
Clause8.1) shall be in two separate parts:
Part I shall be named “Technical Bid” and shall comprise
(i) Bid Security in the form specified in Section
(ii) Qualification Information and supporting documents as specified in Section
(iii) Certificates, undertakings, affidavits as specified in Section
(iv) Any other information pursuant to Clause 4.5 of these instructions
(v) Undertaking that the bid shall remain valid for the period specified in
Part II shall be named “Financial Bid” and shall comprise
(i) Form of Bid as specified in Section
(ii) Priced Bill of Quantities for items specified in Section
12.2. The Bidder shall submit the details / information pertaining to each part i.e.
technical as well as financial and must be submitted online only.
12.3. Following documents will be deemed to be part of the bid.
Section Particulars Volume No.
Invitation for Bids (IFB)
1 Instruction to Bidders Volume I
3 Conditions of Contract
4 Contract Data
5 Specifications Volume II
9 Drawings Volume IV
13.1. The Contract shall be for the whole works as described in Sub-Clause 1.1, based on the
priced Bill of Quantities submitted by the Bidder.
13.2. The bidder shall fill in rates and prices and line item total (both in figures and words)
for all items of the Works described in the Bill of Quantities along with total bid price
(Both in figures and words). Items for which no rate or price is entered by the bidder will not
be paid for by the Bill of Quantities.
13.3. All duties, taxes, and other levies except GST payable by the contractor under the
contract, or for any other cause shall be included in the rates, prices and total Bid Price
submitted by the Bidder. (GST will be paid extra)
13.5. The rates and prices quoted by the bidder are subject to adjustment during the
performance of the Contract in accordance with the provisions of Clause 47 of the
Condition of Contract (Irrespective of the time limit and Bid Amount)
14 Currencies of Bid and Payment
14.1. The unit rates and the prices quoted by the bidder shall be entirely in Indian Rupees.
All payments shall be made in Indian Rupees.
15 Bid Validity
15.1. Bids shall remain valid for a period of not less than 120 days after the deadline date
forbid submission specified in Clause
15.2. In exceptional circumstances, prior to expiry of the original time limit, the Employer
may request that the bidders may extend the period of validity for a specified period. A
bidder may refuse the request without forfeiting his bid security. A bidder agreeing to
the request will not be required or permitted to modify his bid, but will be required to
extend the validity of his security for a period of the extension, and in compliance with
Clause 16 in all respects.
16. Bid Security
16.1. The Bidder shall furnish, as part of his Bid, a Bid security in the amount as shown in
column 4 of the table of IFB for this particular work. This Bid security shall be in favor
of of Employer as named in Appendix and may be in one of the following forms;
a. Bank Guarantee from any scheduled Indian bank, in the format given in Volume
III. (Bank Guarantee is applicable only for Bid Estimated Amount of 01 Crore and
above) and Bank Guarantee of Schedule and Private Banks shall be considered as per
GoG Finance Department’s Circular No. FD/MSM/e- file/4/2023/0057/D.M.O. Date
21/04/2023 or as per their latest amendment.
b. Fixed Deposit Receipt issued by any Scheduled Indian Bank or a foreign Bank
approved by the Reserve Bank of India.
# A Valid Bid Security / EMD Exemption Certificate issued by (1) Road & Building
Department or (2) Narmada Water Resources, Water Supply and Kalpsar Department
of Govt of Gujarat. Exemption Certificate is applicable only when Registration
Certificate of Appropriate Class and Category of Approved Contractors is
required as eligible criteria of bidder.
16.2. Bank guarantees (and other instruments having fixed validity) issued as surety for
the bid shall be valid for 45 days beyond the validity of the bid i.e. total validity of
16.3. Any bid not accompanied by an acceptable Bid Security and not secured as indicated
in Sub-Clauses 16.1 and 16.2 above shall be rejected by the Employer as non-
16.4. The Bid Security of unsuccessful bidders will be returned within 28 days of the end of
the bid validity period specified in Sub-Clause
16.5 The Bid Security of the successful bidder will be discharged when the bidder has signed the Agreement
and furnished the required Performance Security.
16.6. The bid Security may be forfeited
(a) If the Bidder withdraws the bid after Bid opening during the period of Bid
(b) If the Bidder does not accept the correction of the Bid Price, if any or
(c) In the case of a successful Bidders, if the Bidder fails the specified time limit to
(i) Sign the Agreement; or
(ii) Furnish the requirement Performance Security.
(d) If found necessary, the bidder will be intimated for negotiation, He will be intimated
maximum three times within the validity period for negotiation, If contractor does not
respond in time, his Bid Security (EMD) will be forfeited and his tender will be rejected.
Punitive action will be taken on such contractors. (As per GoGR&B Dept’s Gr. No.
17. Alternative Proposals by Bidders.
17.1. Bidders shall submit offers that fully comply with the requirements of the bidding
documents, including the conditions of contract (including mobilization advance or
time for completion), basic technical design as indicated in the drawing and
specifications. Conditional offers or alternative offers will not be considered further in
the process of tender evaluation.
18. Format and Signing of Bid
18.1. The Bidder shall prepare documents comprising the bid as described in Clause 12 of
these Instructions to bidder as the “Technical Bid “and “Financial Bid” in separate parts
to be uploaded.
D. SUBMISSION OF BIDS
20. Deadline for Submission of the Bids
20.1 Complete Bids must be received online by the Employer at the tender website
specified above not later than the date indicated in appendix.
20.2 The Employer may extend the deadline for submission of bids by issuing an
amendment in accordance with Clause 10, in which case all right and obligation of
the Employer and the bidders previously subject to the original deadline will then
be subject to the new deadline.
22 Modification and Withdrawal of Bids
22.1 Bidders may modify or withdraw their bids online before the deadline prescribed in
Clause 20 or pursuant to Clause
22.3. No bid shall be modified or withdrawn after the deadline for submission of Bid.
22.4. Withdrawal or modification of a bid between the deadline for submission of bids and
the expiration of the original period of bid validity specified in Clause 15.1 above or as
extended pursuant to Clause 15.2 may result in the forfeiture of the Bid security
pursuant to Clause
E . BID OPENING AND EVALUATION
23.1 The Employer will open all the Bids received including modifications made pursuant to
Clause 22, in the presence of the Bidders or their representatives who choose to attend
at time, date and the place specified in Appendix in the manner specified in Clauses
and 23.3, In the event of the specified date of Bid opening being declared holiday for the
Employer, the Bids will be opened at the appointed time and location on the next
23.3. The “Technical Bid” shall be opened. The amount, form and validity of the bid security
furnished with each bid will be announced. If the bid security furnished doesnot
conform to the amount and validity period as specified in the invitation for bid (ref.
Column 4 and paragraph 3), and has not been furnished in the form specified in Clause
16, the technical bid will not be opened.
23.4. (i) Subject to confirmation of the bid security by the issuing Bank, the bids accompanied
with valid bid security will be taken up for evaluation with respect to the
Qualification information and other information furnished in part I of the bid
pursuant to Clause 12.1.
(ii) If required, the bidder will be asked in writing to clarify his Qualification
Documents with respect to any required clarification.
(iii) The bidders will respond in not more than 7 days of issue of the clarification
(iv) Immediately (usually within 3 or 4 days), on receipt of these clarification the
Evaluation Committee will finalize the list of responsive bidders whose financial
bids are eligible for consideration.
23.6 At the time of opening of “Financial Bid”, the names of the bidders were found
responsive in accordance with Clause 23.4(iv) will be announced. The bids of only
these bidders will be opened. The responsive Bidders’ names, the Bid prices, the total
amount of each bid, any discount and such other details as the Employer may consider
appropriate, will be announced by the Employer at the opening.
23.7 the time of opening of “Financial Bid”, the names of the bidders were found responsive
in accordance with Clause 23.4(iv) will be announced. The bids of only these bidders
will be opened. The responsive Bidders’ names, the Bid prices, the total amount of each
will be opened. The responsive Bidders’ names, the Bid prices, the total amount of each
bid, any discount, and such other details as the Employer may consider appropriate,
will be announced by the Employer at the opening.
23.8 In case bids are invited for more than one package, the order for opening of the
“Financial Bid” shall be in order of Estimated amount of Bids from highest to lowest.
23.9 The Employer shall prepare minutes of the Bid opening, including the information
disclosed to those present in accordance with Sub-Clause 23.6.
24.1 Information relating to the examination, clarification, evaluation, and comparison of
Bids and recommendations for the award of a contract shall not be disclosed to Bidders
or any other persons not officially concerned with such process until the award to the
successful Bidder has been announced. Any effort by Bidder to influence the Employer’s
processing of Bids or award decisions may result in the rejection of his Bid.
25. Clarification of Financial Bids
25.1. To assist in the examination, evaluation, and comparison of Bids, the Employer may, at
his discretion, ask any Bidder for clarification of his Bid, including breakdowns of unit
rates. The request for clarification and the response shall be in writing or by e- mail, but
no change in the price or substances of the Bid shall be sought, offered, or permitted
except as required to confirm the correction of arithmetic errors discovered by the
Employer in the evaluation of the Bids.
25.2 Subject to sub-clause 25.1, no Bidder shall contact the Employer on any matter relating to his Bid opening
to the contract is awarded. If the Bidder wishes to bring additional information to the notice of the
Employer, it should do so in writing.
25.3. Any effort by the Bidder to influence the Employer in the Employer's bid evaluation, bid comparison or
contract award decision may result in the rejection of the Bidders’ bid.
26. Examinations of Bids and Determination of Responsiveness
26.1 During the detail evaluation of "Technical Bid", the Employer will determine whether
each Bid (a) meets the eligibility criteria defined in Clause 3 and 4; (b) has been
properly signed; (c) is accompanied by the required securities and; (d) is substantially
responsive to the requirements of the Bidding document. During the detailed
evaluation of the “Financial Bid”, the responsiveness of the bids will be further
determined with respect to the remaining bid conditions, i.e., priced bill of quantities,
technical specifications, and drawings.
26.2 A substantially responsive “Financial Bid” is one which confirms all the terms,
conditions and specifications of bidding documents, without material deviation or
reservation. A material deviation or reservation is one (a) which affects in any
substantial way the scope, quality, or performance of the Works; (b) which limits in any
substantial way, inconsistent with the Bidding documents, the Employer’s rights or the
Bidder’s obligations under the Contract; or (c) whose rectification would affect unfairly
the competitive position of other Bidders presenting substantially responsive Bids.
26.3 If a “Financial Bid” is not substantially responsive, it will be rejected by the Employer,
and may not subsequently be made responsive by correction or withdrawal of the non-
conforming deviation or reservation.
29. Evaluation and Comparison of Financial Bids
29.1. The Employer will evaluate and compare only the Bids determined to be substantially
responsive in accordance with Sub-Clause 26.2.
29.3. The Employer reserves the right to accept or reject any variation or deviation. Variation
and deviations and other factors, which are in excess of the requirements of the Bidding
documents or otherwise result in unsolicited benefits for the Employer, shall not be
taken in to account in Bid evaluation.
29.4. The estimated effect of the price adjustment conditions under Clause 47 of the
Conditions of Contact, during the period of implementation of the Contract, will not be
taken in to account in Bid evaluation.
29.5. If the Bid of the successful Bidder is seriously unbalanced in relation to the Engineer’s
estimate of the cost of work to be performed under the contract the Employer may
require the Bidder to produce detailed consistency of those prices with the
construction methods and schedule proposed. After evaluation of the price analyses,
the Employer may require that the amount of the performance security set forth in
Clause 34 be increased at the expense of the successful /bidder to a level sufficient to
protect the Employer against financial loss in the event of default of the successful
Bidder under the Contract.
29.6. A bid which contains several items in the bill of Quantities which are unrealistically
priced low and which cannot be substantiated satisfactorily by the bidder may be
rejected as non-responsive.
F. AWARD OF CONTRACT
32. Award Criteria
32.1. Subject to Clause 32, the Employer will award the contract to the Bidder whose Bid has
been determined.
(i) to be substantially responsive to the Bidding documents and who has offered
the lowest evaluated Bid Price; and
(ii) to be within the available bid capacity adjusted to account for his bid price which
is the lowest evaluation in any of the packages opened earlier than the one
In no case, the contract shall be awarded to any bidder whose available bid capacity is less than
the evaluated bid price, even if the said bid is the lowest evaluated bid. The contract will in such cases be
awarded to the next lowest bidder at his evaluation bid price.
33. Employer’s Right to Accept any Bid and to Reject any or all Bids
33.1. Notwithstanding Clause 31, the Employer reserves the right to accept or reject any Bid,
and to cancel the Bidding process and reject all Bids, at any time prior to the award of
contract, without thereby incurring any liability to the affected bidder or Bidder or any
obligation to inform the affected Bidder or Bidders of the grounds for the Employer’s
34. Notification of Award and Signing of Agreement
34.1. The Bidder whose Bid has been accepted will be notified of the award by the Employer
prior to expiration of the Bid validity period by cable, telex or facsimile confirmed by
registered letter. This letter (hereinafter and in the condition of contract called the
“Letter of Acceptance”) will state the sum that the Employer will pay the Contractor in
consideration of the execution, completion, and maintenance of the Works by the
Contractor as prescribed by the Contract (hereinafter and in the Contract called the
“Contract Price”).
33.2 The notification of award will constitute the formation of the contract, subject only to the furnishing of a
performance security in accordance with the provisions of Clause.
33.3. The Agreement will incorporate all agreements between the Employer and the
successful Bidder. It will be signed by the Employer and to the successful Bidder, within
28 days following the notification of award along with the Letter of Acceptance. Within
21 days of receipt, the successful Bidder will sign the Agreement and deliver it to the
33.4. Upon the furnishing by the successful Bidder of the Performance Security, the Employer
will promptly notify the other Bidders that their Bids have been unsuccessful.
35. Performance Security / Security Deposit
35.1. (A) Within 10 (Ten) days of receipt of Letter of Acceptance, the successful Bidder shall
furnish to the Employer an irrevocable and unconditional guarantee from a Bank
in the form set forth in Section 8 (the “Performance Security”) for an amount equal
to 5% (five percent) of its Contract Price. In case of bids mentioned below, the
successful Bidder, along with the Performance Security,
shall also furnish to the Authority an irrevocable and unconditional guarantee from a Bank in the same
form given at Section 8 towards an Additional Performance Security (The “Additional Performance
Security”) for an amount calculated as under:
(a) If the Contract Price offered by the Selected Bidder is lower than 10% but up to
20% of the Estimated Project Cost, then the Additional Performance Security
shall be calculated @ 20% of the difference in the (i) Estimated Project Cost (as
mentioned in Bid Document) - Minus 10% of the Estimated Project Cost and (ii)
Contract Price offered by the selected Bidder.
(b) If the Contract Price offered by the Selected Bidder is lower than 20% of the
Estimated Project Cost, then the Additional Performance Security shall be
calculated @ 30% of the difference in the (i) Estimated Project Cost (as
mentioned in Bid Document) - Minus 10% of the Estimated Project Cost and (ii)
Contract Price offered by the selected Bidder.
(c) This Additional Performance Security shall be treated as part of the
Performance Security.
(B) The Performance Security shall be valid beyond 60(sixty) days of the Defects Liability Period and the
Additional Performance Security shall be valid beyond 28 (twenty-eight) days of Project Completion
35.2. If the performance security is provided by the successful Bidder in the form of a Bank
Guarantee, it shall be issued either (a) at the Bidder’s option, by a Nationalized/
Scheduled Indian bank or (b) by a foreign bank located in India and acceptable to the
Employer. As per GoG Finance Department’s Circular No. FD/MSM/e-
file/4/2023/0057/D.M.O. Date 21/04/2023 or as per their latest amendment.
35.3. Failure of the successful Bidder to comply with the requirement of Sub-Clause 34.1 shall
constitute sufficient grounds for cancellation of the award and forfeiture of the Bid
36. Advance Payment and Security
36.1. The Employer will provide an Advance payment on the Contract Price as stipulated in the
Conditions of Contract, subject to maximum amount, as stated in the Contract Data.
36. Corrupt of Fraudulent Practices
36.1 The Employer will reject a proposal if it determines that the Bidder recommended for
award has engaged in corrupt or fraudulent practices in completing for the contract in
question and will declare the firm ineligible, either indefinitely or for a stated period of
time, to be awarded a contract with National Highways Authority of India/ State PWD and
any other agencies, if it at any time determines that the firm has engaged in corrupt or
fraudulent practices in completing for the contractor, or in execution.
37.2. Furthermore, Bidders shall be aware of the provision stated in Sub- Clause 59.2 of the
Conditions of Contract.
APPENDIX TO ITB
1. The Name of the Employer is Vnsgu, surat [ Cl.1.1]
2. The last five years.
3. This Annual Financial Turnover Amount Rs. 7,28,87,859.02 [Cl.4.5.3 (a)]
4. Value of Work is Rs.
6. Liquid assets and / or availability of credit facilities Rs. 3,64,43,929=51 [Cl.4.5.6]
7. Price level of the financial year 2024-2025 [Cl. 4.5.2]
8. The pre-bid meeting will take place at Office of the VNSGU. if [Cl. 9.2.1]
9. The technical Bid will be opened at the office of the VNSGU, Surat.
on dt as per Tender Notice detail (if possible) dt
10. Address of the Employer: Registrar, Veer Narmad South Gujarat
University, Udhna-Magdalla Road, Surat
12. The bid should be submitted latest by As stated on online
13. The bid will be opened at Registrar, VNSGU, Surat As stated on
online NIT [Cl. 23.1 ]
14. The Bank Draft in favor of Registrar , Vnsgu surat
16. Escalation factors (for the cost of works
executed and financial figure to a common base value) for works [Cl.4.5.2]
Year Financial Year Multiplying factor
Base year of inviting tender 2025-2026
LIST OF KEY PLANT & EQUIPMENT TO BE DEPLOYED ON CONTRACT WORK
[Reference CL. 4.5.5]
The contractors shall also give a list of machinery in his possession and which they propose to use on the
Sr. Plant or Location Age of Make Capacity Approximate Remark
No. Machinery Machinery Value
List of Key Personnel to be deployed on Contract Work
(Reference Cl. 4.5.4)
Employment of a qualified site Engineer by the Contractor.
The Contractor shall employ full-time technically qualified staff during the execution of this work as under: -
1. Two graduate Civil Engineers and three diploma Civil Engineers when cost of the work to be executed is
more than Rs.50 lakhs.
2. One graduate & two Diploma, Civil Engineers when the cost of the work to be executed is more than Rs.15
lakhs but less than Rs.50 lakhs.
3. Minimum Two Diploma Civil Engineer when the cost of work is less than Rs.15 lakhs but more than Rs.5
4. Minimum One Diploma Civil Engineers for the work when the cost of work to be executed is less than Rs.
lakhs. The Engineer so employed for the Government work must have sufficient experience to handle the
work independently. Such an Engineer shall have to stay at the site of work and he shall not be entrusted
with other duty except this work.
In case the contractor or partner of the contractor firm is a Civil Graduate Engineer, Employment of a
separate Engineer will not be necessary provided that the Engineer partner himself attends the execution
of the work on the site.
Within 15 days of issue of work-order the Contractor will have to furnish to the Deputy Executive
Engineer-in-charge of the work the Name, Qualifications, copy of marksheet, Colour Photograph and the
appointment order issued such engineers engaged for this contract work. If 15 days after issue of work
order such designated Site Engineers do not resume or do not remain present on site of work, the recovery
at the rate of Rs.25,000-00 per month per Engineer will be made from the bills/deposit/dues of the
contractor. Such recovery shall be non-refundable.
QUALIFICATION INFORMATION
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for the purpose of post
qualification as provided for in Clause 4 of the Instruction to Bidders. This information will not be incorporated
in the Contract.
For Individual Bidders
1.1 Constitution or legal status of
Bidder (Attach Copy)
Place of registration
Principal place of business
Power of attorney of signatory of Bid
1.2 Total value of Civil engineering constructions 2020-2021
Work performed in the last five years 2021-2022
(in Rs. Lakhs) 2022-2023
Qualifications and experience of key personnel required for administration and execution of the contract.
Attach biographical data. Refer also to Sub Clause 9.1 of the Conditions of Contract.
Position Name Qualification Year of Year of
Experience experience in
(General) the proposed
Project Manager
Proposed sub-contract and firms involved
Sections of the works Value of Sub- Sub-Contractor Experience in
Contractor (Name & similar work
Attach copies of certificates on possession of valid license for executing water supply/ sanitary work/ building
electrification/ AV / Stage lighting & curtain/ ELV, Fire Fighting / HVAC, etc. works.
1.4 Financial reports for the last five years: balance sheets, profit and loss statements,
auditors’ reports (in case of companies/corporations), etc. List them below and attach copies.
1.5 Evidence of access to financial resources to meet the qualification requirements: cash in hand, lines of
credit, etc. List them below and attach copied documents.
1.6 Name, address, and telephone, telex, and fax numbers of the Bidders bankers who may provide references
if contacted by the Employer.
1.7 Information on Litigation history in which the Bidder is involved.
Other Party Employer Cause of Amount Remarks
(ies) Dispute Involved showing Present
Statement showing Average Annual Financial Turnover during the last 05 years ending on 31. 03. 2025:
Year Turnover Amount Rs.
Signature of the BIDDER with full address
Statement showing similar works completed in the last 07 years,
ending on the last day of the month previous to the one in which bids are invited:
Sr. Name of Name of Estimated Bid Date of Target date of Actual Time limit in Percenta Reasons Remarks
No. Departmen the Work Cost of the Amount Award completion of the Amount year/s and months ge Rate & for Delay
t/Client Work put Rs. of the Work as per contract of the Amount in
With to Bid Contra and Date of Work of Completio
Address Rs. ct Completion of the complete Penalty n of the
Work, if completed. d Rs. Work
Target Completio Extended
date n date Y M
Signature of the BIDDER with full address
Statement showing no. of Works on Hand:
Sr. Name of the Name Estimated Bid Amount Date of Target Date Actual Time limit in Remarks
No. Department/ of the Cost of the Rs. Award of of Amount of Year/s and
Client Work Work put to the Completion theWork Months
with address Bid Contract of the Work done till
Rs. as per the 01.01.202
Signature of the BIDDER with full address
List of Main Technical Staff Employed by the firm on Date:
Sr. Educational Experience
Name Designation Service in
No. Qualifications in the field
Signature of the BIDDER with full address
Statement showing details of Partners of the Firm:
Name Age Qualifications Address Telephone No.
Signature of the BIDDER with full address
LIST OF ARTICLES / MACHINERIES IN WORKING CONDITION, AVAILABLE WITH THE BIDDER :
Sr. Name of Articles/ No. available in Location Value of Articles/
No. Machinaries working condition Machinaries
Signature of the BIDDER with full address
SAMPLE FORMAT FOR EVIDENCE OF ACCESS TO OR AVAILABILITY OF CREDIT FACILITIES
(CLAUSE 4.5.6 OF ITB) BANK CERTIFICATE
This is to certify that M/s. is a reputed company
with a good financial standing.
If the contract for the work, namely is awarded to the
above firm, we shall be able to provide overdraft/credit facilities to the extent of
Rs. to meet their working capital requirements for executing the above during the
contract period.
Senior Bank Manager
Address of the Bank
1. I, the undersigned, do hereby certify that all the statements made in the required attachments are
true and correct.
2. The undersigned also hereby certifies that neither our firm M/s.
have not abandoned any work of Government of Gujarat/Government of India/any Board or
Corporation under Government of Gujarat/Government of India nor any contract awarded to us for
such works have been rescinded, during last five years prior to the date of this bid.
3. The undersigned hereby authorize(s) and request (s) any bank, person, firm or corporation to
furnish pertinent information deemed necessary and requested by the Department to verify this
statement or regarding any (our) competence and general reputation.
4. The Undersigned understands and agrees that further qualifying information may be requested, and
agrees to furnish any such information at the request of the Department/ Project implementing
(Signed by an Authorized Officer of the Firm)
Title of Officer
Would invest a minimum cash up to 25% of the value of the work during implementation of the contract.
(Signed by an Authorized officer of the firm)
Title of officer
CONDITIONS OF CONTRACT
Conditions of Contract
Table of Contents
A General Page D. Cost Control
1 Definitions 53 37 Bill of Quantities
2 Interpretation 54 38 Changes in the Quantities
3 Language and Law 55 39 Variations
4 Engineer’s Decisions 55 40 Payments for Variations
5 Delegations 55 41 Cash Flow Forecasts
6 Communications 55 42 Payment Certificates
7 Sub-Contractors 55 43 Payments
8 Other Contractors 55 44 Compensations Events
9 Personnel 56 45 Tax
10 Employer’s & Contractor Risk 54 56 46 Currencies
11 Employers Risks 56 47 Price Adjustment
12 Contractor’s Risk 56 48 Retention
13 Insurance 56 49 Liquidated damages
14 Site Investigations Reports 56 50 Deleted
15 Queries about the Contract 56 51 Advance Payment
16 Contractors to Construct the works 57 52 Securities
17 The Works to be Completed By 57 53 Deleted
18 the Intended Completion Date Approval 57 54 Cost of Repair
by the Engineer
20 Discoveries 57 E. Finishing the Contract
21 Possession of the Site 57 55 Completion
22 Access to the Site 57 56 Taking Over
23 Instructions 57 57 Final Account
24 Disputes 58 58 Operating and Maintenance manuals
25 Procedure for Disputes 58 59 Terminations
26 Deleted 58 60 Payment upon Terminations
B. Time Control 62 Release from Performance
28 Extensions of the Intended
completion date
29 Deleted 59 F. Special Conditions of Contract
30 Delays Ordered by The Engineer 3 59 63 Labour
31 Management Meetings 59 64 Compliance with labour regulations
32 Early Warning 60 65 Arbitration
C. Quality Control
33 Identifying Defects
35 Correction of Defects
36 Uncorrected Defects
CONDITIONS OF CONTRACT
1.1 Terms which are defined in the Contract Data are not also defined in the Conditions of Contract but keep
their defined meaning.
Bill of Quantities means the priced and completed Bill of Quantities forming part of the Bid
Compensation Events are those defined in Clause 44 hereunder
The Completion Date is the date of completion of the Works as certified by the Engineer in accordance
with Sub Clause
The Contract is the contract between the Employer and Contractor to execute, complete and maintain
the Works till the completion of Defects Liability Period. It consists of the documents listed in Clause
The Contract data defines the documents and other information which comprise the Contract.
The Contractor is a person or corporate body whose Bid to carry out the Work has been accepted by
The Contractor’s Bid is the completed Bidding document submitted by the Contractor to the Employer and
includes Technical and Financial Bids.
The Contract Price is the price stated in the Letter of Acceptance and thereafter as adjusted in accordance
with the provisions of the Contract.
Days are calendar days: months are calendar months.
The Defects Liability Period is the period named in the Contract Data and calculated from the Completion
The Employer is the party who will employ the Contractor to carry out the
The Engineer is the person named in the Contract Data (or any other competent person appointed and
notified to the contractor to act in replacement of the Engineer) who is responsible for supervising the
Contractor, administering the Contract, certifying payments due to the Contractor, issuing and valuing
Variations to the Contract, awarding extensions of time, and valuing the Compensations Events.
Equipment is Contractor’s machinery and vehicles brought temporarily to
the site to construct the Works.
The Initial Contract Price is the Contract Price listed in the Employer’s Letter
The Intended Completion Date is the date on which it is intended that the Contractor shall complete
the Works. The Intended Completion Date is specified in the Contract Data. The Intended Completion
Date may be revised only by the Engineer by issuing an extension of time.
Materials are all supplies, including consumables, used by the contractor for incorporation in the works.
Plant is any integral part of the work which is to have mechanical, electrical, electronic or chemical or
biological functions.
The Site is the area defined as such in the Contract Data.
Site Investigation Reports are those which were included in the Bidding documents and are factual
interpretive reports about the surface and subsurface conditions at the site.
Specifications means the Specifications of the works included in the Contract and any modification or
addition made or approved by the Engineer.
The Start Date is given in the Contract Data. It is the date when the Contractor shall commence
execution of the works. It does not necessarily coincide with any of the Site Possession Dates.
A Subcontractor is a person or corporate body who has a Contract with the Contractor to carry out a
part of the work in the Contract which includes work on the Site.
Temporary Works are works designed, constructed, installed, and removed by the Contractor which
are needed for construction or installation of the Works.
A Variation is an instruction given by the Engineer, which varies the Works. The Works are what the
Contract requires the Contractor to construct, install,
and turn over to the Employer, as defined in the Contract Data.
2. Interpretation
2.1 In interpreting these Conditions of Contract, singular also means plural, male also means female
or neuter and the other way around. Heading have no significance. Words have their normal
meaning under the language of the Contract unless specifically defined. The Engineer will
provide instructions clarifying queries about Conditions of Contract.
2.2 If sectional completion is specified in the Contract Data, references in the Conditions of Contract
to the Works, the Completion date, and Intended Completion Date apply to any Section of the
Works (other than references to the Completion Date and Intended Completion date for the
2.3 The documents forming the Contract shall be interpreted in the following order of priority
(2) Letter of Acceptance, notice to proceed with works
(3) Contractor’s Bid
(4) Contract Data
(5) Conditions of Contract including Conditions of Contract
(6) Specifications
(8) Bills of quantities and
(9) Any other document listed in the Contract Data as forming part of the Contract.
3. Language and Law
3.1 The language of the Contract and the law governing the Contract are stated in the Contract Data.
4. Engineers Decisions
4.1 Except where otherwise specifically stated, the Engineer will decide contractual matters
between the Employer and the Contractor in the role representing the Employer.
5.1 The Engineer may delegate any of his duties and responsibilities to other people after notifying
the Contractor and may cancel any delegation after notifying the Contractor.
6. Communications
6.1 Communications between parties which are referred to in the conditions are effective only when
in writing. A notice shall be effective only when it is delivered (in terms of Indian Contract Act).
7. Sub-Contracting
7.1 The Contractor may sub-contract any portion of work, up to a limit specified in contract data,
with the approval of the engineer but may not assign the Contract without the approval of the
Employer in writing. Sub-contracting shall not alter the Contractor’s obligations. Sub-
contracting of supply or specific items of work is not allowed.
7.2 The sub-contractor must be registered in appropriate class and category for the part of work to
be subcontracted.
8. Other Contractors
8.1 The Contractor shall cooperate and share the Site with other contractors, public authorities,
utilities and the Employer between the dates given in the Schedule of other Contractor. The
Contractors shall as refer to in the Contract Data, also provide facilities and services for them as
described in the Schedule. The employer may modify the schedule of other contractors and shall
notify the contractor of any such modifications.
9.1 The Contractor shall employ the key personnel named in the Schedule of Key Personnel as
referred to in the Contract Data to carry out the functions stated in the Schedule or other
personnel approved by the Engineer. The Engineer will approve any proposed replacement of
key personnel only if their qualifications, abilities, and relevant experience are substantially
equal to or better than those of the personnel listed in the Schedule.
9.2 If the engineer asks the Contractor to remove a person who is a member of the Contractor Staff
or his work force stating the reasons the Contractor shall ensure that the person leaves the Site
within seven days and has no further connection with the work in the Contract.
10.0 Employer’s and Contractors Risks
10.2 The Employer carries the risk which these Contract states are Employer’s risks, and the
Contractor carries the risks which these Contracts states are Contractors risk.
11.0 Employer’s Risks
11.1 The employer is responsible for the excepted risks which are (a) in so far as they directly affect the
execution of the Works, the risks of war, hostilities, invasion, act of foreign enemies, rebellion,
revolution, insurrection or military or usurped power, civil war, riot commotion or disorder
(unless restricted to the Contractor’s employees), and contamination from any nuclear fuel or
nuclear waste or radioactive toxic explosive.
12.0 Contractor’s Risks
12.1 All risks of loss of or damages to physical property and of personal injury and death which arise
during and in consequence of the performance of the Contract other than the excepted risks are
the responsibility of the Contractor.
13.1 The Contractor shall provide, in the joint names of the Employer and the Contractor, insurance
cover from the Start date to the end of the Defects Liability Period, in the amounts and
deductibles stated in the Contract data for the following events which are due to the Contractor’s
13.1.a Loss of or damage to the works, Plant and materials,
13.1.b Loss of or damage to Equipment
13.1.c Loss of or damages of property (expect the Works, Plant, Materials and Equipment)
in connection with the Contract; and
13.1.d Personal injury or death.
13.2 Policies and certificates for insurance shall be delivered by the Contractor to the Engineer for the
Engineer’s approval before the Start Date. All such insurance shall provide for compensation to
be payable in the types and proportions of currencies required to rectify the loss or damage
13.3 If the Contractor does not provide any of the policies and certificates required, the Employer
may affect the insurance which the Contractor should have provided and recover the premiums
the Employer has paid from payments otherwise due to the Contractor or, if no payment is due,
the payment of the premiums shall be a debt due.
13.4 Alterations to the terms of an insurance shall not be made without the approval of the Engineer.
13.5 Both parties shall comply with any conditions of the insurance policies.
14.0 Site Investigation Report
14.1 The Contractor in preparing the Bid shall rely on any site Investigation reports referred to in
the Contract Data, supplemented by any information available to the Bidder.
15.0 Queries about the Contract data
15.1 The engineer will clarify queries on the Contract Data
16.0 Contractor to Construct the Works
16.1 The Contractor shall construct and install the works in accordance with the specification and
17.0 The Works to be completed by the Intended Completion Date
17.1 The Contractor may commence execution of the Works on the Start Date and shall carry out the
Works in accordance with the programme submitted by the Contractor, as updated with the
approval of the Engineer, and complete them by the Intended Completion date
18.0 Approval by the Engineer
18.1 The Contractor shall submit Specifications and Drawings showing the proposed Temporary
works to the Engineer, who is to approve them if they comply with the Specifications and
18.2 The Contractor shall be responsible for design of temporary works.
18.3 The Engineer’s approval shall not alter the contractor responsibility for design of the Temporary
18.4 The Contractor shall obtain approval of third parties to the design of the Temporary works where
18.5 All Drawings prepared by the Contractors for the execution of the temporary or permanent work
are subject to prior approval by the Engineer before their use.
19.1 The Contractor shall be responsible for the safety of all activities on the Site.
20.0 Discoveries
20.1 Anything of historical or other interest or of significant value unexpectedly discovered on the
site is the property of the Employer. The contractor is to notify the engineer of such
discoveries and carry out the Engineer’s instructions for dealing with them.
21.0 Possession of the Site
21.1 The Employer shall give possession of all parts of the site to the Contractor. If
possession of a part is not given by the date stated in the Contract Data the Employer
is deemed to have delayed the start of the relevant activities and this will be a
Compensation Event.
21.2 If within 25% of the time limit of the project, 80% of possession of the site is not
handed over to the Contractor, then contractor/ Employer may fore-close the contract.
Contractor/Employer has to foreclose the work within 30 days after lapse of 25%-time
limit and after 30 days foreclosure option will be closed.
22.0 Access to the Site
22.1 The Contractor shall allow the Engineer and any person authorized by the Engineer
access to the Site, to any place where work in connection with the Contract is being
carried out or is intended to be carried out and to any place where materials or plants
are being manufactured/ fabricated/ assembled for the works.
23.0 Instructions
23.1 The Contractor shall carry out all instructions of the Engineer pertaining to works
which comply with the applicable laws where the site is located.
23.2 The Contractor shall permit the Employer to inspect the Contractor’s accounts and
records relating to the performance of the Contractor and to have them audited by
auditors appointed by the Employer, if so required by the Employer.
24.1 If the Contractor is of the view that a decision taken by the Engineer was either outside
the authority given to the Engineer by the Contract or that the decision was wrongly
taken, the decision shall be referred to #Superintending Engineer (Higher Authority)
within 14 days of the notification of the Engineer's decision. If the issue is not resolved,
any party can refer the matter for conciliation within 15 days from the decision given
by the #Superintending Engineer.
24.2.a For the work up to Rs.100 Cr., if any of the parties is not satisfied with the decision of the
#Superintending Engineer, both the parties have to refer to the Chief Engineer concern
for the conciliation process.
24.2.b For the work more than Rs.100 Cr., if any of the parties is not satisfied with the decision
of the #Superintending Engineer, both the parties have to refer to the #Secretary, Roads
& Building Department, Government of Gujarat for the conciliation process.
If the dispute is not resolved through the conciliation process, he may refer the dispute to Gujarat
Public Works Contract Dispute Arbitration Tribunal. If the Contractor fails to refer a claim /
dispute to the Higher Authority within 14 days of the notification of the Engineer's decision, the
Contractor shall not be entitled to any additional payment/claim if he doesn’t follow the above
sequence in stipulated time and he should not stop the work.
25.0 Procedure for Disputers
25.1 The arbitration shall be conducted in accordance with the arbitration
procedure stated in the Special Conditions of Contract.
B. TIME CONTROL
27.1 Within the time stated in the Contract Data the Contractor shall submit to the Engineer for
approval a Programme showing the general methods, arrangements orders, and timing for all
the activities in the works along with monthly cash flow forecast.
27.2 An update of the Programme shall be a programme showing the actual progress achieved on
each activity and the effect of the progress achieved on the timing of the remaining work
including any changes to the sequence of the activities.
27.3 The Contractor shall submit to the Engineer, for approval an updated programme at intervals no
longer than the period stated in the Contract data. If the Contractor does not submit an updated
programme within this period, the Engineer may withhold the amount stated in the Contract
data from the next payment after the date on which the overdue programme has been submitted.
27.4 The Engineer’s approval of the programme shall not alter the Contractor’s obligations. The
Contractor may revise the programme and submit it to the Engineer again at any time. A revised
programme is to show the effect of Variations and Compensations events.
28.0 Extension of the Intended Completion Date
28.1 The Engineer shall extend the Intended Completion Date if a compensation Event occurs or a
Variation is issued which makes it impossible for completion to be achieved by the Intended
Completion Date without the Contractor taking steps to accelerate the remaining work and
which would cause the Contractor to incur additional cost.
28.2 The Engineer shall decide whether and by how much to extend the Intended Completion Date
within 35 days of the Contractor asking the Engineer for a decision upon the effect of a
compensation event or Variation and submitting full supporting information. If the Contractor
has failed to give early warning of a delay or has failed to cooperate in dealing with a delay, the
delay by this failure shall not be considered in assessing the new Intended Completion Date.
28.3 The Engineer shall within 14 days of receiving full justification from the contractor for extension
of Intended Completion Date refer to the Employer his decision. The employer shall in not more
than 21 days communicate to the engineer the acceptance or otherwise of the Engineer’s
decision. If the employer fails to give his acceptance, the Engineer shall not grant the extension
and the contractor may refer the matter under Clause
30.0 Delays Ordered by the Engineer
30.1 The Engineer may instruct the Contractor to delay the start or progress of any activity within
31. Management Meetings
31.1 Either the Engineer or the Contractor may require the other to attend a management meeting.
The business of a management meeting shall be to review the plans for remaining work and to
deal with matters raised in accordance with the early warning procedure.
31.2 The Engineer shall record the business of management meetings and is to provide copies of his
record to those attending the meeting and to the Employer. The responsibility of the parties for
actions to be taken is to be decided by the Engineer either at the management meeting or after
the management meeting and stated in writing to all who attended the meeting.
32. Early Warning
32.1 The Contractor is to warn the Engineer at the earliest opportunity of specific likely future events
or circumstances that may adversely affect the quality of the work, increase the Contract price
or delay the execution of works. The Engineer may require the contractor to provide an estimate
of the expected effect of the future event or circumstance on the contract price and completion
date. The estimate is to be provided by the Contractor as soon as reasonably possible.
32.2 The Contractor shall cooperate with the Engineer in making and considering proposals for how
the effect of such an event or circumstance can be avoided or reduced by anyone involved in the
work and in carrying out any resulting instruction of the Engineer.
C. QUALITY CONTROL
33. Identifying Defects/ Defect liability period
33.1 : Defect liability period: The contractor shall be responsible to make good and remedy at his own
expense any defect which may develop or may be noticed before the period mentioned
hereunder from the certified date of completion. The Engineer in charge shall give the contractor
a notice in writing about the defects and the contractor shall make good the same within 15 days
of receipt of the notice. In the case of failure on the part of the contractor, the Engineer- in-charge
may rectify or remove or re-execute the work at the risk & cost of the contractor. The Engineer-
in-charge shall be entitled to appropriate the whole or any part of the amount of security deposit
towards the expenses, if any, Incurred by him in rectification, removal or re-execution. The
Defects Liability period shall be as under….
(a) For original building works the defect liability period will be 4 years or elapse of 4 monsoon
period following date of possession of building taken over by user agency following the certified
date of completion, whichever is later.
For the purpose of deciding the monsoon period, the 30th September shall be treated as the last
Modified vide R & B D Circular No. PAC-11-102008-2076-N dated 31/8/2009,
PRCH/102013(2976) 2759-N, Dated 27/05/2013 and Circular No.TNC/10/ 2016/ Clause 17A
(Correction/(1)C Dated 12/05/2016]
(1) Videography for the surface under Maintenance Guarantee is to be done as per Govt. letter
No.: SSR/10/2015-16/26/C, Dtd. 26/11/15 for the work costing more than Rs. 5.00 Crore.
(2) Setting up of adequate laboratory & deployment of quality engineers.
The contractor shall have to set up the laboratory with adequate equipment. Till the setting
up of adequate laboratory is completed & reported of this to the engineer (subject to due
verification by engineer’s representative) by contractor in writing, Rs.2,00,000/- shall be
withheld. The qualified quality Engineer shall be deployed exclusively for this contract by
the contractors. If quality Engineer is not deployed by contractor within one month after the
date of work order, the amount equivalent to Rs.20,000 per month shall be recovered till the
actual deployment of quality engineer. The amount so recovered towards the deployment
of quality engineers shall not be refunded.
(3) Maintenance during Construction Period
During the Construction Period, the Contractor shall maintain, at his own risk and cost, the
existing lane(s) of the road so that the traffic worthiness and safety thereof are at no time
materially inferior as compared to their condition 10 (ten) days prior to the date of the
Agreement, and shall undertake the necessary repair and maintenance works for this
purpose; provided that the Contractor may, at his cost, interrupt and divert the flow of traffic
if such interruption and diversion is necessary for the efficient progress of works and
conforms to Good Industry Practice; provided
further that such interruption and diversion shall be undertaken by the Contractor only with
the prior written approval of the Executive Engineer which approval shall not be
unreasonably withheld. For the avoidance of doubt, it is agreed that the Contractor shall at
all times be responsible for ensuring safe operation of the road.
33.1 The Engineer shall check the Contractor’s work and notify the Contractor of any defects that are
found. Such checking shall not affect the Contractor’s responsibilities the Engineer may instruct
the Contractor to search for a Defect and to uncover and test any work that the Engineer
considers may have a Defect.
34.1 If the engineer instructs the Contractor to carry out a test not specified in the Specification to
check whether any work has a Defect and the test shows that it does, the Contractor shall pay for
the test and any samples. If there is no defect the test shall be a Compensation Event.
34.2 Agency has to establish testing laboratory on site for the various test to be carried out in the
work for this purpose agency shall construct a pukka laboratory building with all facility on site
at location specified by the engineer in charge.
35. Correction of defects
35.1 The engineer shall give notice to the Contractor of any defects before the end of the defects
Liability Period, which begins at Completion and is defined in the contract data. The Defects
Liability Period shall be extended for as long as Defects remain to be corrected.
35.2 Every time notice of a Defect is given, the Contractor shall correct the notified defect within
the length of time specified by the Engineer’s notice.
36. Uncorrected Defects
36.1 If the Contractor has not corrected a defect within the time specified in the Engineer’s notice, the
Engineer will assess the cost of having the Defect corrected, and the Contractor will pay this
D. COST CONTROL
37. Bill of Quantities
37.1 The bill of Quantities shall contain items for the constructions, installation, testing and
commissioning work to be done by the Contractor.
37.2 The bill of Quantities is used to calculate the Contract price. The Contractor is paid for the
quantity of the work done at the rate in the Bill of Quantities for each item.
38. Change in the Quantities (Additional Provisions)
38.1 The Engineer shall have power to make any alterations in or addition to the original
specifications , drawings, designs and instructions that may appear to him to be necessary or
advisable during the progress of the work and the contractor shall be bound to carry out the
work in accordance with any instruction in this connection which may be given to him in
writing signed by the Engineer and such alteration shall not invalidate the contract and any
additional work which the contractor may be directed to do in the manner above specified
as part of the work shall be carried out by the contractor on the same conditions in all
respects on which he agreed to do the main work and at the same rate as are specified in the
tender for the main work.
Except that when the quantity of any item exceeds the quantity as in the tender by more than
130%, the contractor will be paid for the quantity in excess of 130%, at the rate entered in
the SOR of the year during which the excess in quantity is first executed.
38.2 Notwithstanding anything contained in Clause 38.1 above, it is expressly clarified that in
renovation, retrofitting, and upgradation works of the auditorium, certain existing components,
services, finishes, structural members, and concealed items are hidden from view and their actual
condition, extent of deterioration, or usability can only be ascertained after dismantling,
demolition, or exposure of the existing works.
38.3 For such concealed or hidden items, the quantities indicated in the Bill of Quantities are
provisional in nature and have been arrived at based on visual inspection, non-destructive
assessment, experience, and reasonable assumptions of the Consultant. The actual quantities
required for replacement, repair, strengthening, or reinstatement may vary substantially upon
exposure of the existing components during execution.
38.4 In such cases, the quantities of these items may increase or decrease without any limit, and the
restriction of 130% variation as mentioned in Clause 38.1 shall not be applicable to these specific
concealed or hidden items, provided such variation arises solely due to the actual condition
observed after dismantling or exposure.
38.5 The necessity, extent, and approval of such additional replacement or modification works arising
out of exposure of existing components shall be decided jointly by the Consultant and the Engineer-
in-Charge, and such joint decision shall be final and binding on the Contractor.
38.6 The Contractor shall not be entitled to any claim on account of such variations in quantities for
concealed or hidden items, other than payment for the actual quantities executed at the applicable
tendered rates or applicable Schedule of Rates, as approved jointly by the Consultant and the
Engineer-in-Charge.
38.7 The Contractor shall be deemed to have inspected the site, understood the nature of renovation
works, and accepted the possibility of uncovering unforeseen conditions, and shall carry out all
such additional works as directed, without delay, disruption, or claim for extension of time solely
on account of such quantity variations.
38.8 For the purpose of Clauses 38.2 to 38.7 above, the term “concealed or hidden items” shall mean
those items of work whose actual condition, extent, quantity, or necessity can only be determined
after dismantling, demolition, hacking, cutting, removal, or exposure of existing components
during execution.
38.9 The following BOQ items shall be deemed to fall under the category of concealed or hidden items
and shall be governed by the provisions of unlimited quantity variation, subject to joint approval
of the Consultant and the Engineer-in-Charge, as detailed in the tender document.
38.10 The quantities mentioned against the above BOQ items are provisional and indicative only, based
on visual inspection and preliminary assessment. The actual quantities required shall be
determined upon dismantling or exposure of existing conditions during execution.
38.11 For the BOQ items listed in Clause 38.9 above, the quantity variation limit of 130% specified in
Clause 38.1 shall not apply. The quantities may increase or decrease to any extent as necessitated
by site conditions revealed during execution.
38.12 Any such variation shall be executed only after joint inspection and written approval by the
Consultant and the Engineer-in-Charge, whose decision regarding necessity, extent, and
measurement shall be final and binding on the Contractor.
38.13 The quantity variation shall not be restricted only to the BOQ items expressly listed under Clause
38.9 above and shall also be applicable, wherever required, to any other BOQ items or components,
if such variation becomes necessary upon inspection, dismantling, or exposure of existing works,
based on the joint inspection, recommendation, and written approval of the Engineer-in-Charge
and the Consultant. However, such provision shall not be construed as a blanket approval for
indiscriminate increase in quantities, and the Contractor shall execute such varied quantities
strictly as directed in writing, supported by joint inspection records, measurements, and
justification, failing which no claim whatsoever on this account shall be entertained. Any decision
taken jointly by the Engineer-in-Charge and the Consultant under this clause with respect to
necessity, extent, measurement, applicability, or interpretation of quantity variation shall be final
and binding on the Contractor, and no dispute, claim, reference, or arbitration shall lie on this
39.1 All Variations shall be included in updated programmes produced by the Contractor.
40. Payments for Variations
40.1 If the additional or altered work includes any class of work for which no rate is specified in
this contract, then such class of work shall be carried out as under.
(i) At the rate derived from the item within the contract which is comparable to the one
involving additional or altered class of work; where there are more than one comparable
items, the item of the contract which is nearest in comparison with regard to class or classes
of the work involved shall be selected and the decision of the Superintending Engineer as to
the nearest comparable item shall be final and binding on the contractor.
(ii) If the rate cannot be derived in accordance with (i) above, such class of works shall be carried
out at the rate entered in the Schedule of Rates of the division for the year in which the tender
was received, increased or decreased by the percentage by which the tender amount is
more or less as compared to the amount arrived at the rates in the “Schedule of Rates” of
the Division in the year in which the tender was received. If the Schedule of rates of the
Division does not contain all the items, the percentage increase or decrease of the tender shall
be calculated considering such items which were included in the “Scheduled Rates” of the
division for the year and for materials consumed on such item the rate to be charged would
be the basic rate taken into account for fixing the rate in S.O.R. referred to above.
(iii) If it is not possible to arrive at the rate from (i) and (ii) above, such class of work shall be
carried out at the rate decided by the competent authorities on the basis of detailed rate
analysis after hearing the contractor before a Committee of two Superintending Engineers
stationed at the same place or the nearest place.
40.2 If the additional or altered work, for which no rate is entered in the “Schedule of Rates” of the
Division is ordered to be carried out before the rate is agreed upon, then the contractor shall
within seven days of the date of receipt by him of the order to carry out the work, inform the
Engineer-in-charge of the rate, which it is his intention to charge for such class of work and
40.3 if the Engineer in charge does not agree to this rates, he shall by notice in writing be at liberty
to cancel his order to carry out such class of work and arrange to carry it out in such manner
as he may consider it advisable, provided always that if the contractor shall commence work
or incur any expenditure in regard thereof before the rates shall have been determined as
lastly herein before mentioned, then in such cases he shall only be entitled to be paid in
respect of the work carried out or expenditure incurred by him prior to the date of the
determination of the rate as aforesaid according to such rate or rates as shall be fixed by the
Engineer-in-charge. In the event of the dispute, the decision of the Superintending Engineer
of the Circle shall be final.
Where, however, the work is to be executed according to the designs, drawings and
specifications recommended by the contractor and accepted by the competent authority, the
alternation above referred to shall be within the scope of such designs, drawings and
specifications appended to the tenders.
The time limit for the completion of the work shall be extended in the proportion
that the increase in the cost occasioned by alterations bears to the cost of the original work
and the certificate of the Engineer-in-charge as to such proportion shall be final and
41. Cash Flow Forecasts
41.1 When the programme is updated, the contractor is to provide the engineer with an updated
cash flow forecast.
42. Payment certificates.
42.1 The Contractor shall submit to the Engineer monthly statements of the estimated value of
the work completed less the cumulative amount certified previously.
42.2 The Engineer shall check the Contractor’s monthly statement within 14 days and certify the
amount to be paid to the Contractor after taking in to account any credit or debit for the
month in question in respect of materials for the
works in the relevant amounts and under conditions set forth in sub-clause
32.3 of the Contract Data (secured Advance).
42.3 The value of work executed shall be determined by the Engineer.
42.4 The value of work executed shall comprise the value of the quantities of the items in the Bill
of Quantities completed.
42.5 The value of work executed shall include the valuation of variations and compensation
42.6 The Engineer may exclude any item certified in a previous certificate or reduce the
proportion of any item previously certified in any certificate in the light of later information
43.1 Payments shall be adjusted for deductions for advance payments, retention, other recoveries
in terms of the contract and taxes at source, as applicable under the law. The Employer shall
pay the Contractor the amounts certified by the Engineer within 28 days of the date of each
43.2 Payment of GST (prevailing rates) on the amount payable under the contract to the
Contractor will be made by the Employer. Hence, it is the responsibility of the contractor to
pay the GST to the concerned Authority.
43.3 Items of the works for which no rate or price has been entered in will not be paid by the
Employer and shall be deemed covered by other rates and prices in the Contract.
44. Compensation events
44.1 The following are compensation Events unless they are caused by the Contractor:
(a) The Employer does not give access to a part of the Site by the site
Possession date stated in Contract data to the Contractor
44.2 In case of compensation event occurs and it prevents the work being completed beyond the
Intended Completion Date then Authority will approve EOT with eligible contractual price
45.1 The rates quoted by the Contractor must be inclusive of all taxes prevailing on due date of
bid submission except GST. However, any subsequent changes in the tax structure by
Government after due date of bid submission will be compensated (+/-) on availability or
submission of actual documentation. Contractor will have to intimate Engineer regarding
changes occurred in the tax structure after bid submission. If the contractor fails to provide
such information and if any financial obligation may arise due to change in tax structure,
same will be recovered from the contractor.
45.2 GST will be paid separately on the bills. Hence, it is the responsibility of the contractor to pay
the GST to the concerned Authority.
46. Currencies.
46.1 All payment shall be made in Indian Rupees.
47. Price Adjustment (applicable only after permission of University Authority)
48.1 The Employer shall retain from each payment due to Contractor the proportion stated in the
Contract Data until Completion of the whole of the Works.
48.2 On Completion of the whole of the Works half the total amount retained is repaid to the
48.2 On Completion of the whole of the Works half the total amount retained is repaid to the
Contractor and half when the Defects Liability Period has passed and the Engineer has
certified that all Defects notified by the Engineer to the Contractor before the end of this
period have been corrected.
48.3 On completion of the whole works, the contractor may substitute retention
money with an “on demand” Bank guarantee.
In case, Contractor requests for refund of the Retention Money deducted by the Employer
under the provision of this clause, Employer shall consider the said request of the Contractor
provided that the refund hereunder shall be made in tranches of not less than 1% (One
Percent) of the Contract Price and Contractor furnishes an irrevocable and unconditional
Bank guarantee for an equal amount substantially in the format of Bank Guarantee for
Performance Guarantee enclosed with SBD and valid up to 60 day beyond the scheduled /
extended Defects Liability Period. On completion of the whole works, the contractor has
however an option to submit a fresh irrevocable and unconditional Bank Guarantee for an
amount equal to 5% of the total value of work executed substantially in the format of Bank
Guarantee for Perform
Guarantee enclosed with SBD and valid up to 60 days beyond the Defect Liability Period and
yet refund the Retention Money Bank Guarantee submitted for refund of Retention Money.
49. Liquidated Damages
49.1 The Contractor shall pay liquidated damages to the Employer at the rate per day stated in the
Contract Data for each day that the Completion Date is later than the Intended Completion
Date (for the whole works or the milestone as stated in the contract data). The total amount
Date (for the whole works or the milestone as stated in the contract data). The total amount
of liquidated damages shall not exceed the amount defined in the Contract Data. The
Employer may deduct liquidated damages from payment due to the Contractor. Payment of
liquidated damages does not affect the Contractor’s liabilities.
49.2 If the Intended Completion Date is extended after liquidated damages have been paid, the
Engineer shall correct any overpayment of liquidated damages by the Contractor by
adjusting the next payment certificate. The Contractor shall not be entitled for any interest
on the over payment calculated from the date of payment to the date of repayment.
49.3 If the contractor fails to comply with the time for completion as stipulated in the tender, then
the contractor shall pay to the employer the relevant sum stated in the Contract Data as
Liquidated damages for such default and not as penalty for everyday or part of day which
shall elapse between relevant time for completion and the date stated in the taking over
certificate of the whole of the works on the relevant section, subject to the limit stated in the
The employer may, without prejudice to any other method of recovery deduct the amount of
such damages from any monies due or to become due to the contractor. The payment or
deduction of such damages shall not relieve the contractor from his obligation to complete
the works on from any other of his obligations and liabilities under the contract.
49.4 If, before the Time for Completion of the whole of the Works or, if applicable any Section, a
Taking Over Certificate has been issued for any part of the Works or of a Section, the
liquidated damages for delay in completion of the remainder of the Works or of that Section
shall, for any period of delay after the date stated in such Taking-Over-Certificate, and in the
absence of alternative provisions in the Contract, be reduced in the proportion which the
value of the part so certified bears to the value of the whole of the Works or Section, as
applicable. The provisions of this Sub-clause shall only apply to the rate of liquidated
damages and shall not affect the limit thereof.
51. Advance Payment. (applicable only after permission of University
51.1 The Employer shall make advance payment (not to be paid less than two installments except
in special circumstances for which the reason to be
Recorded in writing) to the Contractor of the amounts stated in the Contract Date by the date stated
in the Contract Date, against provision by the Contactor of an Unconditional Bank Guarantee in a
form and by a bank acceptable to the Employer in amounts and currencies equal to be at least 110%
of the advance payment. The guarantee shall remain effective until the advance payment has been
repaid, but the amount of the guarantee shall be progressively reduced by the amounts repaid by the
Contractor. The Mobilization advance would be deemed as interest bearing advance at an interest
rate of 10 % to be compounded, quarterly.
51.1 The Contractor is to use the advance payment only to pay for Equipment, plant and
Mobilization expenses required specifically for execution of the Works. The Contractor shall
demonstrate that advance payment has been used in this way by supplying copies of invoices
or other documents to the engineer. The Equipment advance would be deemed as interest
bearing advance at an interest rate of 10% to be compounded, quarterly.
51.2 The advance payment shall be repaid by deduction proportionate amount from payments
otherwise due to the Contractor, following the schedule of completed percentages of the
Works on a payment basis. No account shall be taken of the advance payment or its
repayment in assessing valuations of work done, variations, price adjustments,
Compensation Events, or Liquidated damages.
52.1 The performance Security (including additional security for unbalanced bids) shall be
provided to the Employer no later than the date specified in the Letter of Acceptance and
shall be issued in an amount and form and by a bank or surety acceptable to the Employer,
and denominated in Indian Rupees. The performance Security shall be valid until a date
days from the date of expiry of Defects Liability Period and the additional security for
unbalanced bids shall be valid until a date 28 days from the date of issue of the certificate of
54. Cost of Repairs.
54.1 Loss or damage to the Works or Materials to be incorporated in the Works between the Start
date and the end of Defects Correction periods shall be remedied by the Contractor at the
Contractor’s cost if the loss or damages arises from the Contractor’s acts or omissions.
E. FINISHING THE CONTRACT
55.1 The Contractor shall request the Engineer to issue a Certificate of Completion of the works and
the Engineer will do so upon deciding that the work is completed.
56. Taking Over
56.1 The Employer shall take over the Site and the Works within seven days of the Engineer issuing
a certificate of Completion.
57. Final Account
57.1 The Contractor shall supply to the Engineer a detailed final account of the total amount that the
57.1 The Contractor shall supply to the Engineer a detailed final account of the total amount that the
Contractor considers payable as full and final settlement of all claims under the Contract for
items before the end of the Defects Liability Period. The Engineer shall issue a Defect Liability
Certificate and certify any final payment that is due to the Contractor within 56 days of receiving
the Contractor's account if it is correct and complete. If it is not, the Engineer shall issue within
56 days a schedule that states the scope of the corrections or additions that are necessary. If the
Final Account is still unsatisfactory after it has been resubmitted, the Engineer shall decide on
the amount payable to the Contractor and issue a payment certificate, within 56 days of receiving
the Contractor’s revised account.
57.2 If reversal in characteristic of tender (L1 becoming L2) on account of excesses and savings in
final account is observed, the Engineer/Employer shall be at liberty to restrict the final payment
of BOQ items to the lowest amount evaluated of the bids considering the final quantities and the
rates quoted including the rebates if any. Payment of variation items shall however be made at
the rates approved by the Employer, within 90 days from the physical completion of work.
58. Operating and Maintenance Manuals
58.1 If “as built” drawings and/or operating and maintenance manuals are required, the Contractor
shall supply them by the dates stated in the Contract data.
58.2 If the Contractor does not supply the Drawings and/or manuals by the dates stated in the
Contract data, or they do not receive the Engineer’s approval, the Engineer shall withhold the
amount stated in the Contract Data from payments due to the Contractor.
59. Termination
59.1 The Employer or the Contractor may terminate the Contract if the other party causes a
fundamental breach of the Contract.
59.2 Fundamental breaches of Contract include, but shall not be limited to the following:
1. The contractor stops work for 28 days when no stoppage of work is shown on the current
programme and the stoppage has not been authorized by the Engineer
2. The Engineer instructs the Contractor to delay the progress of the Works and the
instructions is not withdrawn within 28 days;
3. The Employer or the Contractor is made bankrupt or goes into liquidation other than for a
reconstructions or amalgamation
4. A payment certified by the Engineer is not paid by the Employer to the
Contractor within 56 days of the date of the Engineer’s certificate
5. The Engineer gives Notice that failure to correct a particular Defect is a fundamental breach
of Contract and the Contractor fails to correct it within a reasonable period of time
determined by the Engineer;
6. The Contractor does not maintain a security which is required;
7. The Contractor has delayed the completion of works by the number of days for which the
maximum amount of liquidated damages can be paid as defined in the Contract data; and
8. If the Contractor, in the judgment of the Employer has engaged in corrupt or fraudulent
practices in competing for or in executing the Contract.
For the purpose of this paragraph: “corrupt practice” means the offering, giving, receiving or
soliciting of anything of value to influence the action of a public official in the procurement
process or in contract execution. “Fraudulent practice” means a misrepresentation of facts in
order to influence a procurement process or the execution of a contract to the detriment of the
borrower, and includes collusive practice among Bidders (prior to or after bid submission)
designed to establish bid prices at artificial non-competitive levels and to deprive the Borrower
of the benefits of free and open competition.
59.3 When either party to the Contract gives notice of a breach of contract to the Engineer for a cause
other than those listed under Sub Clause 59.2 above, the Engineer shall decide whether the
breach is fundamental or not.
59.4 Notwithstanding the above, the employer may terminate the Contract for convenience.
60. Payment upon Termination
60.1 If the Contract is terminated because of a fundamental breach of Contract by the Contractor, the
Engineer shall issue a Certificate for the value of the work done less advance payments received
up to the date of the issue of the certificate, less other recoveries due in terms of the contract,
less taxes due to deducted at source as per applicable law and less the percentage to apply to the
work not completed as indicated in the Contract data. Additional Liquidated Damages shall not
apply. If the total amount due to the Employer exceeds any payment due to the Contractor the
apply. If the total amount due to the Employer exceeds any payment due to the Contractor the
difference shall be a debt payable to the Employer.
60.2 If the Contract is terminated at the Employer’s convenience or because of a fundamental breach
of Contract by the Employer, the Engineer shall issue a certificate for the value of the work done,
the cost of balance material brought by the contractor and available at site, the reasonable cost
of removal of equipment, repatriation of the Contractor’s personnel employed solely on the
works, and the Contractor’s cost of protecting and securing the Works and less advance payment
received up to the date of the certificate, less other recoveries due in terms of the contract and
less taxes due to deducted at source as per applicable law.
61.1 All materials on the Site, Plant Equipment's, Temporary Works and Works are deemed to be
property of the Employer, if the Contract is terminated because of a Contractor’s default.
62. Release from Performance
62.1 If the Contract is frustrated by the outbreak of war of by any other event entirely outside the
control of either the Employer or the Contractor the Engineer shall certify that the Contract has
been frustrated. The Contractor shall make the Site safe and stop work as quickly as possible
after receiving this certificate and shall be paid for all work carried out before receiving it
and for any work carried out afterwards to which commitment was made.
F. SPECIAL CONDITIONS OF CONTRACT
The Contractor shall, unless otherwise provided in the Contract, make his own
arrangements for the engagement of all staff and labour, local or other, and for their
payment of housing, feeding and transport.
The Contractor shall, if required by the Engineer, deliver to the Engineer a return
in detail, in such form and at such intervals as the Engineer may prescribe, showing
the staff and the numbers of the several classes of labour from time to time
employed by the Contractor on the site and such other information as the Engineer
64. COMPLIANCE WITH LABOUR REGULATIONS
During continuance of the contact, the Contractor and his sub- contractor shall
abide at all times by all existing labour enactments and rules made thereunder,
regulations, notification and bye laws of the State or central Government or local
authority and any other labour law (including rules), regulations, bye laws that
may be passed or notifications that may be issued under any labour law in future
either by the State or the Central Government or the local authority. Salient
features of some of the major labour laws that are applicable to the construction
industry are given below. The Contractor shall keep the Employer indemnified in
case any action is taken against the Employer by the competent authority on
account of contravention of any of the provisions of any Act or rules made
thereunder, regulations or notifications including amendments. If the Employer is
caused to pay or reimburse, such amounts as may be necessary to cause or observe,
or for observance of the provisions stipulated in the notifications/bye
laws/Acts/Rules/regulations including amendments, if any, on the part of the
Contractor, the Engineer/employer shall have the right to deduct any money due
to the Contractor including his amount of performance security. The
Employer/Engineer shall also have the right to recover from the Contractor any
sum required or estimated to be required for making good the loss or damage
suffered by the Employer.
The employees of the Contractor and the Sub-Contractor in no case shall be treated
as the employees of the Employer at any point to time.
SALIENT FEATURES OF SOME MAJOR LABOUR AND OTHER LAWS APPLICABLE TO
ESTABLISHMENTS ENGAGED IN BUILDING AND OTHER CONSTRUCTIONS WORK
A) Workmen Compensation Act 1923:- The Act provides for compensation in case of
injury by accident arising out of and during the course of employment.
B) Payment of Gratuity Act. 1972 :- Gratuity is payable to an employee under the Act on
satisfaction of certain conditions on separation if an employee has completed 5 years’
service or more on death, the rate of 15 days wages for every completed year of service.
The Act is applicable to all establishments employing 10 or more employees.
C) Employees P.F. and Miscellaneous Provision Act 1952:- The Act Provides for
monthly contributions by the employer plus workers @ 10% or 8.33% The benefits
payable under the Act are :
1. Pension or family pension on retirement or death, as the case may be.
2. Deposit linked insurance on the death in harness of the worker.
3. Payment of P.F. accumulation on retirement/death etc.
D) Maternity Benefit Act 1951:- The Act provides for leave and some other benefits to
women employees in case of confinement or miscarriage etc.
E) Contract Labour (Regulation & Abolition) Act 1970: The Act provides for certain
welfare measures to be provided by the Contractor to contract labour and in case the
Contractor fails to provide, the same are required to be provided, by the Principal
Employer by Law. The principal Employer is required to take Certificate of Registration
and the Contractor is required to take license from the designated Officer. The Act is
applicable to the establishments or Contractor of Principal Employer, if they employ
or more contract labour.
F) Minimum Wages Act 1948:- The Employer is supposed to pay not less than the
Minimum Wages fixed by appropriate Government as per provisions of the Act, if the
employment is a scheduled employment. Construction of Building, Roads, Runways are
scheduled employment.
G) Payments of wages Act 1936:- It lays down as to by what date the wages are to be
paid, when it will be paid and what deductions can be made from the wages of the
H) Equal remunerations Act 1979 :- The Act provides for payment of equal wages for
work of equal nature to Male and Female workers and for not making discrimination
against female employees in the matter of transfer, training and promotions etc.
I) Payments of Bonus Act 1965 :- The Act is applicable to all establishments employing
20 or more employees. The Act provides for payments of annual bonus subject to a
minimum of 8.33% of wages and maximum of 20 % of wages to employees drawing
Rs. 3500/- per month or less. The bonus to be paid to employees getting Rs, 2500/-
per month or above Rs. 3500/- per month shall be worked out by taking wages as Rs.
2500/- per month only. The Act does not apply to certain establishments. The newly
set-up establishments are exempted for five years in certain circumstances. Some
of the State Governments have
reduced the employment size from 20 to 10 for the purpose of applicability of this Act.
J) Industrial Disputes Act 1947:- The Act lays down the machinery and procedure for
resolutions of Industrial disputes, in what situations a strike or lock-out becomes
illegal and what are the requirements for laying off or retrenching the employees or
closing down the establishment.
K) Industrial employment (standing Orders) Act 1946:- It is applicable to all
establishments employing 100 or more workmen (employment size reduced by some
of the State and Central Government to 50). The Act provides for laying down rules
governing the conditions of employment by the Employer on matters provided in the
Act and get the same certified by the designated Authority.
L) Trade Unions Act 1926:- The Act lays the procedure for registration of trade unions
of workmen and employers. The Trade Unions registered under the Act have given
certain immunities from civil and criminal liabilities.
M) Child Labour (Prohibition & Regulation Act 1986:- The Act prohibits employment
of children below 14 years of age in certain occupations and process and provides for
regulation of employment of children in all other occupations and processes.
Employment of Child labour is prohibited in Building and Construction Industry.
N) Inter – State Migrant workmen’s (Regulation of Employment & Conditions of
service) Act 1979:- The Act is applicable to an establishment which employs 5 or
more inter-state migrant workmen through an intermediary (who has recruited
workmen in one state for employment in the establishment situated in another
state).The inter-state migrant workmen, is an establishment to which this Act
becomes applicable, are required to be provided certain facilities such as housing,
medical aid, traveling expenses from home up to the establishment and back, etc.
O) The Building and Other Construction workers (Regulation of employment and
Conditions of Service) Act 1996 and the Cess Act of 1996:- All the establishments
who carry on any building or other constructions work and employ 10 or more
workers are covered under this Act.
All such establishments are required to pay cess at the rate not exceeding 2% of the
cost of construction as may be modified by the government. The Employer of the
establishment is required to provide safety measures at the Building or construction
work and other welfare measures, such as canteens, First Aid facilities, Ambulance,
Housing accommodations for workers near the workplace etc. The Employer to whom
the Act applies has to obtain a registration certificate from the Registering Officers
appointed by the Government.
P) Factories Act 1948 :- The Act lays down the procedure for approval of plans before
setting up a factory, health and safety provisions, welfare provisions, working hours,
annual earned leave and rendering information regarding accidents or dangerous
occurrences to designated authorities. It is applicable to premises employing
persons or more with aid of power or 20 or more persons without the aid of power
engaged in the manufacturing process.
Q) Royalty charges-The contractor shall pay the royalty to the competent authority as
per rule. The royalty charges paid shall be borne by the contractor and shall not be
reimbursed by the Employer.
R) Following Pollution control Acts and amendments made thereof from time to
time shall be applicable.
1. Water (Preservation and control of Pollution) Act,
2. Air (Prevention and Control of Pollution Act
3. Environmental (Protection) Act
The contractor must commit to adopting Environmental management plan for
best energy use, waste management, the reduction of pollution as in EMS
(Environmental Management system)ISO-14001-
65. ARBITRATION (GCC Clause 24)
The procedure for arbitration will be as follows: -
24.1 If the Contractor is of the view that a decision taken by the Engineer was either
outside the authority given to the Engineer by the Contract or that the decision was
wrongly taken, the decision shall be referred to #Vice chancellor within 14 days of
the notification of the Engineer's decision. If the issue is not resolved, any party can
refer the matter for conciliation within 15 days from the decision given by the #Vice
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with the
decision of the #vice chancellor, both the parties have to refer to the #Chief
Engineer concerned for the conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied with
the decision of the Vice chancellor, both parties have to refer to the #Board of
the management, Vnsgu, surat for the conciliation process.
If the dispute is not resolved through the conciliation process, contractor may
refer the dispute to Gujarat Public Works Contract Dispute Arbitration
Tribunal. If the Contractor fails to refer a claim / dispute to the Higher
Authority within 14 days of the notification of the Engineer's decision, the
Contractor shall not be entitled to any additional payment/claim if he doesn’t
follow the above sequence in stipulated time. However, during such period, he
would not stop the work in any case.
CONTRACTOR FOLLOWED STRICTLY
(Rehabilitation Work)
1) Contractor first responsibility to check all plaster for soundness on all room walls and ceiling and remove
hollow sound plaster and then strictly follow instruction as per E.I.C
2) Contractor shall guarantee the work for a period (36 months) defect liability from the date of issue of
completion certificate.
3) Minimum B.E Civil or experience person for rehabilitation work appoint as an engineer /supervisor for site,
without responsible person at site work is not allowed at site.
4) 1 bag mixture machine or half bag diesel or electric operated or batch mix machine required. for Concrete
5) Hand driven machine required for preparation of P.M.M motor or thixo tropic motor and manual
preparation at site is not allowed. In any Case.
6) Air blower machine required after scraping of plaster or before plaster on existing wall.
7) Hacking with machinery required in old existing structure elements.
8) Concrete Cube test required -1 test (3 cubes) per jacketing of coloumn or beam(Cube size 70x70x70mm)
For Thixo tropic up to minimum 50 sq.mt -1 test
For Thixo tropic up to minimum 50 to 100 sq.mt -2 test
For Thixo tropic up to minimum 100 to 500 sq.mt -4 test
9) Thixo tropic & micro concrete work only in presence of engineer at site from contractor & engineer from
consultant or engineer from SMC.
10) Portable or quality water used in repair or any work.
11) Sand – (Bodeli-screen sand without soil lumps) only use for repair & rehabilitation work, Nareshwar &
Black sand / nareshwar pano sand / koicha sand is not allowed in repair & all work. so Do only
order for Bodeli screen sand only.( Except bodeli screen sand all sand are rejected )
12) Aggregate of VS 10 mm for Micro concrete and 20 mm vs for Normal M-20 or M-25 mix, Chemical use as per
approved brand confirming with Consultant or E.I.C only.
13) Check all slopes of terrace as well as sunk slab (pre- approved from consultant at site) and level mark
(thaiya) always check with EIC for better execution of work.
14) Kani vata required above water proofing as per drawings.
15) First coat of outside plaster / inside plaster only done after checking of all pointing work as well as chicken
mesh application as well as rehab work like thixo / pmm/ injection grouting and finalize with racron 3s and
plasticizer or water proofing agent as per instruction of E.I.C.
16) Outside plaster work required 2-day curing after finalize single coat and then valid for second coat.
17) Always check PMM/ /Thixo work before water proofing work adjoin area.
18) All sewage & rain water pipe joint must be fill up with swell chemical or as per instructed by EIC.
19) Contractor have to manage Weight balance up to 30kg (on site).
20) Made a farma for concrete work as per PMM / THIXO work and concrete or thixo as well as PMM only
allowed in container in no case it was allowed on ground (steel or aluminium container required) if Flooring
damage then concrete need to be replaced as then own cost. And in kota stone one single coat polishing
required if flooring damage by contractor -without charge.
21) All PMM / THIXO hidden measurement record with Engineer in-charge day to day in site register.
22) Cube of PMM / THIXO –split test done as per instructed by Engineer in charge or Consultant.
23) Injection grouting cement or epoxy nos & spacing for grouting only as per directed by E.I.C & in presence
of E.I.C or consultant.
24) In Water proofing work bottom surface naked without any stinking object on slab and with base slab applied
bond coat with SBR / RBR Epoxy as per instructed by E.I.C
25) In Water proofing top layers (finishing coat) we have to use racron 3s and top with 400 x 400mm chex (
dori ) with nylon string .
26) Terrace parapet column always cast in M20- M-25 As per instructed by E.I.C only (pre-Approval need)
27) On Terrace coping renew or renovate as per E.I.C & Always with projection as per standard drawings with
in & out both side projection and with groove.
28) Always column jacketing 75 mm /100mm in thickness except & inform for the change in thickness.
29) Before plastering all PMM / THIXO measurement must be written in site register & pics also taken
30) Always Remove Plaster for Damage Column beam as per visual inspection and as per NDT test result as
instructed by E.I.C
31) Terrace OHT must be fix only on concrete pedestal, do not rest OHT Directly on slab.
32) In all passage, Balcony adequate weep hole with minimum 50 mm / 75 mm UPVC pipe Min C/C 3.00 m or
as per instructed by E.I.C
33) Thixo/ PMM Measurement 0 mm to 25 mm and 0 mm to50 mm only Single Measurement is to be done in
bill not twice for the same measurement will be paid in both.
34) Terrace water proofing junction & sunk beam slab junction and RCC Chajja and masonry junction we have
40mm x 40mm thixo/pmm vati then do next process.
For hidden measurement.
35) Water Measurement liter marked On Bucket Compulsory & by Trial. Finalize Water Quantity For M-25
Concrete and Micro-Concrete & Thixo. First Finalize & then is no Change Allowed throughout Project.
36) Double scaffolding if scaffolding made by bamboo & H.frame or Cap Lock System for scaffolding no hole
allowed in walls.
37) As per scrapping of external plaster and internal plaster are concern,. So, no additional payment has to be
made for scaffolding and it will be only done with chipper.
38) Contractor first responsibility to check all plaster for soundness on all room walls and ceiling and remove
hollow sound plaster and then strictly follow instruction as per E.I.C
39) In micro concrete for from work slab plates are not allowed in any case (3 x 2)
40) For jacketing work before form work shear keys are note in site register and apply epoxy bonding only as a
bonding agent for new and existing new concrete.
41) Contractor or his representative always need to be compulsory present in weekly meeting as per decided .
I read and accept and agreed to do work only as per all above requirement or condition or methodology .
Sign of Contractor
Clause Reference
Item marked “N/A” do not apply to this Contract. With respect To
1. The Employers [CL.1.1]
Name: Veer Narmad South Gujrat University
Address: Udhna Magdalla Road, Surat Name of authorized Representative (will
be ntimated later)
2. The Engineer is Registrar, Vnsgu, Surat Name of Authorized Representative: [CL.1.1&33]
Registrar, Vnsgu, Surat
3. The Defects Liability Period is 4 years or elapse of 4 monsoon period from [CL.1.1]
the date of completion.
The Start Date shall be 1st days for the date of issue of the Notice to proceed
The Intended Completion Date for the whole of the works is 1 1 (Eleven)
Months after start of work with the following milestones:
Milestone dates:
Physical works to be completed Period from the start date -
6. The Site is located at VNSGU Campus, Surat [CL.1.1]
7. The name and identification number of the Contract is: - [CL.1.1]
8. The works consist of Building repair, renovation, Upgradation work with items as per
B.O.Q. The works shall, inter alia, include the following, as Specified or as directed:
(A) Any Other Items as required to fulfill all contractual obligations as per the Bid
9. The following documents also form part of the Contract: [CL.2.3(9)]
As per clause 2-3- Addendum / Corrigendum /
undertaking given by contractor (if any)
10. The law which applies to the Contract is the law of Union of India [CL.3.1]
11. The language of the Contract documents is English [CL.3.1]
12. Limit of subcontracting 25% of the Initial Contract Price [CL.7.1]
13. The Schedule of Other Contractors [CL.8]
14. The Schedule of Key Personnel As per Annex – II to Section I [CL.9]
15. The minimum insurance cover for physical property, injury and death is Rs. 5 [CL13]
lakhs per occurrence with the number of occurrences limited to four. After each
occurrence, the contractor will pay an additional premium necessary to make
insurance valid for four occurrences always.
16. Site Investigation report [CL.14]
17. The Site Possession dates shall be 1st day of work order [CL.21]
18. The period for submission of programme for approval of the engineer shall be 21 [CL. 27.1]
days from the issue of Letter of Acceptance.
19. The period between program updates will be 135 days. [CL.27.3]
20. The amount to be withheld for late submission of an updated programme [CL.27.3]
shall be Rs 1.00 lakhs
21. The following events shall also be Compensation Events Substantially adverse [CL. 44]
ground conditions encountered during the course of execution of work not
provided for in the bidding document.
(i) Removal of underground utilities detected
(ii) Significant changes in classification of soil requiring
additional mobilization by the contractor, e.g.
ordinary soil to rock excavation,
(iii) Removal of unsuitable material like marsh, debris
dumps, etc. not caused by the contractor.
(iv) Artesian conditions
(v) Seepage, erosion landslide
(vi) River training requiring protection of permanent work
(vii) Presence of historical, archeological or religious
structures, monuments interfering with the works
(viii) Restriction of access to ground imposed by civil,
judicial, or military authority
22. The currency of the Contract is Indian Rupees [CL. 46]
23. The formula (e) for adjustment of prices are as under:
• If any of the commodities like Cement, Steel or Bitumen are not found applicable
in a work, the weight component of that commodities {i.e. ‘Cement’ (Pc), ‘Steel’ (Ps)
or ‘Bitumen' (Pb) as indicated in SBD for the purpose of Price Adjustment} shall be
clubbed with the weight component of ‘Other Material’ (Pm), such that the gross %
weight of the components shall remain as 100% .
R = value of work as defined in Clause 47.1 of Conditions of Contract
Adjustment for labour component
(i) Price adjustment for increase or decrease in the cost due to labour shall be paid in
accordance with the following formula:
VL = Increase or decrease in the cost of work during the month under consideration due
to changes in rates for local labour
L0 = The consumer price index for industrial workers for the State on 28 days preceding
the scheduled date of opening of technical Bids as published by Labour Bureau,
Ministry of Labour, Government of India
Li = The consumer price index for industrial workers for the State for the month under
consideration as published by the Labour Bureau, Ministry of Labour,
Government of India.
Pl = Percentage of labor component of the work.
Adjustment for cement component.
(ii) Prices adjustment for increase or decrease in the cost of cement procured by
Vc = Increase or decrease in the cost of work during the month under consideration
due to changes in rates for cement.
C0 = The all India wholesale price index for Ordinary Portland Cement on 28 days
preceding thescheduled date of opening of technical bid as published by
the Office of the Economic Adviser,
Department for Promotion of Industry and Internal Trade, Ministry
of Commerce & Industry.
Ci = The all India average wholesale price index for
Ordinary Portland Cement for the month
under consideration as published by Office
of the Economic Adviser, Department for
Promotion of Industry and Internal Trade,
Ministry of Commerce & Industry.
Pc = Percentage of cement component of the work
Adjustment for steel component
(iii) Price adjustment for increase or decrease in the cost of steel procured by the
contractor shall be paid in accordance with the following formula
Vs= Increase or decrease in the cost of work during the month under consideration due
to changes in the rates for steel
So= The all India wholesale price index for steel (Mild Steel - Long Products Rebars)
on 28 days preceding the date of opening of Bids as published by the Office of
the Economic Adviser, Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Si= The all India average wholesale price index for steel (Mild Steel - Long Products
Rebars) for the month under consideration as published by Office of the
Economic Adviser, Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Ps = Percentage of steel component of the work
Note : For the application of this clause, the index of Mild Steel- Long
products Rebars has been chosen to represent the steel group.
Adjustments of bitumen component
(iv) Price adjustment for increase in the cost of bitumen shall be paid in
accordance with the following formula
Vb = Increase or decrease in the cost of work during the month under
consideration due to changes in rates for bitumen.
Bo = The official retail price of bitumen at the IOC depot at the nearest centre
on the day 28 days prior to the scheduled date of opening of technical bid.
Bi = The official retail price of bitumen of IOC depot at the nearest centre for
the 15th day of the month under consideration.
Pb = Percentage of bitumen component of the work
Adjustment of POL (fuel and lubricant) component
(iii) Price adjustment for increase or decrease in cost of POL (fuel and lubricant)
shall be paid in accordance with the following formula
Vf = Increase or decrease in the cost of work during the month under
consideration due to changes in rates for fuel and lubricants.
Fo = The official retail price of High Speed Diesel (HSD) at the existing
consumer pumps of IOC at the nearest centre on the day 28 prior to the date
of opening of Bids.
Fi = The official retail price of HSD at the existing consumer pumps of IOC at
the nearest centre for the 15th day of the month of the under consideration.
Pf = Percentage of fuel and lubricants component of the work
Note: For the application of this clause, the price of High-Speed diesel Oil has
been chosen to represent the fuel and lubricants group.
Adjustment for Construction Machinery
(iv) Price adjustment for increase or decrease in the cost of plant and Machinery
spare procured by the Contractor shall be paid in accordance with the
following formula
Vp= Increase or decrease in the cost of work during the month under
consideration due to changes in rates for plant and machinery spares
P0 = The all India wholesale price index for manufacturer of machinery
for mining, quarrying and Construction for the month under
consideration as published Office of the Economic Adviser, Department
for Promotion of Industry and Internal Trade, Ministry of Commerce &
Pi = The all India average wholesale price index for manufacturer of
machinery for mining, quarrying and Construction for the month under
consideration as published Office of the Economic Adviser, Department
for Promotion of Industry and Internal Trade, Ministry of Commerce &
Pp = Percentage of plant and machinery spares component of the work.
Note: For the application of this clause, index of Heavy Machinery and parts has been
chosen to represent the Plant and Machinery Spares group
Adjustment of other materials Component N.A (or Aprroval of university
(iii) Price adjustment for increase or decrease in cost of local materials other than
cement, steel, bitumen and POL procured by the contractor shall be paid in
accordance with the following formula
Vm = Increase or decrease in the cost of work during the month under
consideration due to change in rates for local materials other than cement,
steel, bitumen and POL.
M0 = The All Indian wholesale price index (all commodities) on 28 days
preceding the scheduled date of opening of technical Bids, aspublished by
the Office of the Economic Adviser, Department for Promotion of
Industry and Internal Trade, Ministry of Commerce & Industry.
Mi= The All India wholesale price index (all commodities) for the month
under consideration as published by the Office of the Economic Adviser,
Department for Promotion of Industry and Internal Trade, Ministry of
Commerce & Industry.
Pm = Percentage of local material components (other than cement, steel,
bitumen and POL) of the work.
The following percentage will govern the price adjustment for the entire
1. Labour - Pl = 22.29 %
2. Cement – Pc = 9.15 %
3. Steel - Ps = 22.16 %
4. Bitumen - Pb = 0.00 %
6. Plant & Machinery Spares - Pp = 11.15 %
7. Other Materials - Pm = 34.18 %
24. The proportion of payments retained (retention money) For Whole of work {CL.49} delay in completion
shall be 6% {CL. 48} from each bill subject to a maximum of works (1/2000)th of the
of 5% of final contract price. Initial contract
price, rounded off to the nearest Thousand, per
day. For sectional Completion (wherever
specified In item 6 of Contract data) (1/2000)th
of initial contract price for #5 km Section,
rounded off to the nearest thousand per day.
25. Maximum limit of liquidated damages For delay in 10 percent of the Initial{CL. 49} For delay in
completion work completion Work Contract Price rounded off to
the nearest thousand
26. The amount of the advance payment are: {CL. 51 & 52}( N.A )nor as per Approval of University
Nature of Advances Amount ( Rs. )
Conditions to Be fulfilled
I. Mobilization 10% of the contract On submission of Bank Guarantee. (to be before
unconditional Price drawn the end of 20% of the contract period). The
contractor may furnish four bank guarantees of
2.5 % of each valid for the full period.
II. After equipment is brought to site (provided the
Equipment: 90% for new and 50% of
depreciated value for old equipment. Total amount will Engineer is satisfied That the equipment is
depreciated value for old equipment. Total amount will Engineer is satisfied That the equipment is
be subject to a maximum of 5% of the Contract Price required for performance of the contract) and on
submission of unconditional Bank Guarantee for
amount of advance
III. Secured Advance for Non-persish able material Brought Deleted
(The advance payment will be paid to the Contractor no later than 28 days after fulfillment of the above conditions).
The securities shall be for the following minimum amounts equivalent {CL. 52} As a percentage of the Contract
Performance Security for 5 percent of contract price plus Rs. …………….. (to be decided after evaluation of the
bid) as additional security in terms of ITB Clause
The standard form of Performance security acceptable to the Employer shall be an unconditional Bank
Guarantee of the type as presented in Section 8 of the Bidding Documents
28. The Schedule of Operating and maintenance Manuals…..N/A. {CL. 58}
The date by which “as– built” drawings (in scale as directed) in 2 sets {CL. 58} are required within 28 days of
the issue of certificate of completion of the whole or section of the work, as the case may be.
The date by which “as– built” drawings (in scale as directed) in 2 sets {CL. 58} are required within 28 days of
the issue of certificate of completion of the whole or section of the work, as the case may be.
31. The amount to be withheld for failing to supply “as built” drawings {CL. 58} by the Date required is Rs25 Lakhs.
32. The following events shall also be fundamentals breach of contract: {CL.59.2} “The Contractor has contravened
Sub- clause 7.1 and Clause 9 of GCC”
33. The percentage to apply the value of the work not completed representing {Cl 60} the Employer’s additional
cost for completing the Works shall be 20 per cent.
TECHNICAL SPECIFICATION
(As per SECTION 12)
Description of the Works:
1. We offer to execute the Works described above and remedy any defects therein in conformity with the
conditions of Contract, specification, drawings, Bill of Quantities and Addenda for the sum (s) of
2. We undertake, if our Bid is accepted, to commence the Works as soon as is reasonably possible after the
receipt of the Engineer’s notice to commence, and to complete the whole of the Works in the Contact
within the time stated in the document.
3. We agree to abide by this Bid for the period of 120 Days from the date fixed for receiving the same, and it
shall remain binding upon it and may be accepted at any time before the expiration of that period.
4. Unless and until a formal Agreement is prepared and executed this Bid, together with your written
acceptance thereof, shall constitute a binding contract betweenus.
5. We understand that you are not bound to accept the lowest or any tender you may receive.
Dated this ------------------------- day of
------- duly authorized to sign bids for and on behalf of -----------------------------------
(in block capitals or typed)
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder, Conditions of
Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are given to provide
a common basis for bidding. The basis of payment will be the actual quantities of work ordered and
carried out, as measured by the Contractor and verified by the Engineer and valued at the rates and
prices tendered in the priced Bill of Quantities, where applicable, and otherwise at such rates and
prices as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as it is otherwise
provided under the Contract, include all construction alplant, layout, supervision, materials,
erection, maintenance, insurance, profit, taxes and duties, together with all general risks, liabilities
and obligations set out or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether quantities are stated
or not. The cost of Items against which Contractor has failed to enter a rate or price shall be deemed
to be covered by other rates and prices entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in the items
provided in the priced Bill of Quantities, and where no Items are provided the cost shall be deemed
to be distributed among the rates and prices entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily repeated or
summarized in the Bill of Quantities. References to the relevant sections of the contract
documentation shall be made before entering rates or prices against each item in the Bill of
8. The method of completed work of payment shall be in accordance with the specification for Road
and Bridge works. For building works specifications for building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required blasting, or the use of
metal wedges and sledgehammers, or the use of compressed air drilling for its removal, and which
cannot be extracted by ripping with a tractor of at least 150 kw with a single rear mounted heavy
BILL OF QUANTITIES
(A) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of figures Words
specifications)
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure)
…... (C)Net Tendered Amount (A-B) (in figure) ………………………………
1 … .T..h#e Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of difference of
cement consumption have been deducted from the rate of original item at the rate of input rate mentioned
in all the tender.
SECURITIES AND OTHER FORMS
BID SECURITY (BANK GUARANTEE)
WHEREAS, ---------------------------------------- (name of Bidder) (hereinafter called the “The Bidder”) has
submitted his bid Dated ------------------------ (Date) for the construction of ------------- (Name of Contractor
hereinafter called “the Bid”)
KNOW ALL PEOPLE by these presents that We -------------------------------------------------
(name of Bank) of ----------------------------------------------------------- (name of country) having our
registered office at ------------------------------------------------------------------- ( hereinafter called
“the bank”) are bound unto ------------------------------------------------------------ (name of Employer)
(Hereinafter called “The Employer”) in the sum of *
for which payment well and truly to be made to the said Employer the Bank itself, his successors and assigns
by these presents.
SEALED with the Common Seal of the said Bank this ---------------------- day of ------------------------------
THE CONDITIONS of these obligations are:
(1) If after Bid opening the Bidder withdraws his bid during the period of Bid validity specified in the
(2) If the Bidder has been notified of the acceptance of his bid by the Employer during the
period of Bid Validity:
A Fails or refuses to execute the Form of Agreement in accordance with the Instructions
to Bidders, if required; or
B. Fails or refuse to furnish the Performance Security, in accordance with the Instructions to Bidders;
C. does not accept the correction of the Bid Price pursuant to Clause 27 (Correction of
We undertake to pay to the Employer up to the above amount upon receipt of his first
written demand, without the employer having to substantiate his demand, provided that in his
demand the Employer will note that the amount claimed by him is due to him owing to the
occurrence of one or any of the three conditions, specifying the occurred conditions or conditions.
This Guarantee will remain in force up to and including the date **
days after the deadline for submission of Bids as such the deadline is stated in the Instructions to
Bidders or as it may be extended by the Employer, notice of which extension (s) to the Bank is hereby
waived. Any demand in respect of this guarantee should reach the Bank not later than the above date
(Signature, name and address)
* The Bidder should insert the amount of the guarantee in words and figures denominated in Indian
Rupees. This figure should be the same as shown in Clause 16.1(Bid Security) of the Instructions
**45 days after the end of the validity period of the Bid. Date should be inserted by the Employer
before the Bidding documents are issued.
PERFORMANCE SECURITY
contractor) (hereafter called “the Contractor”) has undertaken, in
Execute -------------------------- (name of Contract and brief description of Works)
(hereinafter called “The Contract”)
AND WHEREAS it has been stipulated by you in the said Contract that the Contractor shall
furnish you with a Bank Guarantee by a recognized bank for the sum specified therein as security for
compliance with his obligation in accordance with the Contract.
AND WHEREAS we have agreed to give the Contractors such a bank Guarantee:
NOW THEREFORE we hereby affirm that we are the Guarantor and responsible to you on behalf of the
Contractor, up to a total of ------------------------------------------
(Amount of guarantee)* ---------------------------------------- (in words), such sum being payable in
types and proportions of currencies in which the Contract prices is payable, and we undertake to pay
you, upon your first written demand and without cavil or argument, any sum or sums within the limits
(Amount of guarantee) as aforesaid without your needing to prove or to show grounds or reasons for
your demand for the sum specified therein.
We hereby waive the necessity of your demanding the said debt from the contractor before presenting is
with the demand.
We further agree that no change or addition to or other modification of the terms of the Contract to of
the Works to be performed thereunder or of any of the Contract documents which may be made between
your and the Contractor shall in any way release us from any liability under this guarantee, and we hereby
waive notice of any such charge, addition or modifications.
This guarantee shall be valid until 60 days from the date of expiring of the Defect Liabilities
Signature and Seal of the guarantor ----------------------------- Name of
*An amount shall be inserted by the Guarantor, representing the percentage the Contract price specified
in the Contract denominated in Indian Rupees.
ADDITIONAL PERFORMANCE SECURITY
[Clause 34.1. (A)]
contractor) (hereafter called “The Contractor”) has undertaken, in pursuance of Contracts No. --------------
- ----------(Name of Contract and brief description of Works) (hereinafter
called “The Contract”)
AND WHEREAS it has been stipulated by you in the said Contract that the Contractor shall
furnish you with a Bank Guarantee by a recognized bank for the sum specified therein as security for
compliance with his obligation in accordance with the Contract.
AND WHEREAS we have agreed to give the Contractors such a bank Guarantee:
NOW THEREFORE we hereby affirm that we are the Guarantor and responsible to you on behalf of the
Contractor, up to a total of ------------------------------------------
(amount of guarantee) ----------------------------------------- (in words), such sum being payable in
types and proportions of currencies in which the Contract prices is payable, and we undertake to pay
you, upon your first written demand and without cavil or argument, any sum or sums within the limits
(amount of guarantee) as aforesaid without your needing to prove or to show grounds or reasons for
your demand for the sum specified therein.
We hereby waive the necessity of your demanding the said debt from the contractor before presenting is
with the demand
We further agree that no change or addition to or other modification of the terms of the Contract to of
the Works to be performed thereunder or of any of the Contract documents which may be made between
your and the Contractor shall in any way release us from any liability under this guarantee, and we hereby
waive notice of any such charge, addition or modifications.
This guarantee shall be valid until 28 days from the project completion date. Signature and
Seal of the guarantor -----------------------------
BANK GUARANTEE FOR ADVANCE PAYMENT
In accordance with the provisions of the Conditions of Contract, sub-clause
51.1 (“Advance Payment”) of the above mentioned Contract, -------------------------------
------------------- (name and address of Contractor) (hereinafter called
“the Contractor”) shall deposit with (name of Employer) a bank guarantee his proper and faithful
performance under the said Clause of the Contract in an amount of
(amount of Guarantee)* -
We, the ------------------------------------------ (bank of financial institution), as instructed
by the Contractor, agree unconditionally and irrevocably to guarantee as primary obligator and not as
Surety merely, the payment to ---------------------------------------- (name of Employer) on his first demand
without whatsoever right of obligation on our part and without his first claim to the Contractor, in the
amount not exceeding ---
---------------------- (amount of guarantee)* words) - (in
We further agree that no change or addition to or other modifications of the terms of the Contractor
or Works to be performed thereunder or of any of the Contract documents which may be made
between --------------------------------- (name of Employer) and the Contractor, shall in any way release
us from any liability under this guarantee, and we hereby waive notice of any such change, addition or
modifications. This guarantee shall remain valid and in full effect from the date of the advance
payment under the Contract until -------------------------------------------------------- (name of employer)
receives full repayment of the same amount from the contractor.
Signature and Seal
Name of Bank/ Financial Institution Address
* An amount shall be inserted by that Bank or Financial Institution representing the amount of the
Advance Payment, and denominated in Indian Rupees.
Letter of Acceptance
(Letter head paper of the Employer)
(Name and address of the Contractor)
This is to notify you that your Bid dated for execution of the
(Name of the contract and identification number, as given in the Instructions to
Bidders) for the Contract Price of Rupees (
) (amount in words and figures) as corrected and modified in accordance with the
Instructions to Bidders* is hereby accepted by our agency.
You are requested to furnish performance security, in the form detailed in para
34.1 of ITB for an amount equivalent to Rs. within 10 days of the receipt of this letter of
acceptance up to beyond 60 days from the date of expiry of defects Liability period i.e. up to
and the Additional Performance Security for an amount
equivalent to Rs. shall be valid beyond 28 (twenty-eight) days of Project
Completion Date i.e. up to and sign the contract, failing which action as
stated in Para 34.3 of ITB will be taken.
Yours Faithfully
Authorized Signature
Name and title of
Signatory Name of
* Delete “Corrected and” or and modified if only one of these actions applies. Delete as corrected and
modified in accordance with the Instructions to Bidders, if corrections or modifications have not
Issue of Notice to proceed with the work
(Letterhead of the Employer)
(Name and address of the Contractor)
Pursuant to your furnishing the requisite security in ITB Clause 34.1 and signing of the Contract
for the construction of
at a bid Price of Rs. .
You are hereby instructed to proceed with the execution of the said works in accordance with the
contract documents.
Yours faithfully
(Signature, name and title of signatory authorized To sign on behalf of
This agreement, made on the day of between
_ (name and address of Employer) (Hereinafter called “the
Employer) and (name and address of contractor)
hereinafter called “the Contractor” of the
Whereas the Employer is desirous that the Contractor execute
Name and identification number of contract (hereinafter called “the works”) and the employer has
accepted the Bid by the Contractor for the execution and completion of such works and the remedying of
any defects therein, at a cost of Rs.
NOW THIS AGREEMENT WITNESSETH AS FOLLOWS
1. In this Agreement, words and expression shall have the same meanings as are respectively assigned
to them in the conditions of contract hereinafter referred to and they shall be deemed to form and
be read construed as part of this Agreement.
2. In Consideration of the payment to be made by the Employer to the contractor as hereinafter
mentioned, the Contractor hereby covenants with the Employer to executive and complete the works
and remedy any defects therein in conformity in all aspects with the provisions of the contracts.
3. The employer hereby covenants to pay the Contractor in consideration of the execution and
completion of the works and the remedying the defects wherein contract price or such other sum as
may become payable under the provisions of the Contract at the times and in the manner prescribed
by the contract.
4. The Following documents shall be deemed to form and be ready and construed as part of this
i) letter of Acceptance
ii) Notice to proceed with the works:
iii) Contractor’s Bid
iv) Conditions of contract: General and Special
v) Contract Data
vi) Additional conditions
viii) Bill of Quantities and
ix) Any other documents listed in the
Contract data as forming part of the
In witness whereof the parties there to have caused this Agreement to be executed the day and
year first before written
The Common seal of Was hereunto affixed in the presence of :
Signed, sealed and Delivered by the said
In the presence of
Binding signature of Employer
Binding Signature of Contractor
(For Investment)
I, the undersigned do hereby undertake that our firm
M/s…………………………………………………..……………………………….. would invest a minimum cash up to 25%
of the value of the work during implementation of the contract.
(Signed by an Authorized officer of the
Title of officer
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Sheet1.pdf
DRAWINGS-01.pdf
DRAWINGS-02.pdf
TENDER FOR REPARING OF CONVENTION HALL.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].