Tender Value
₹2.4 Cr
EMD Value
₹13.9 L
Closing Date
24 Sept 2026, 12:00 pm2d left
Shri Praveen Kumar
Office of the SE, Varanasi Circle, PWD, Varanasi
Vikash Khand Shahabganj ke Gram Rohakhi se Bramhan basti hote hue Bihar Border sampark marg ka Nav Nirman karya
2026_CEUVZ_1184644_5
SE Ref. No 4142/183com-va-vritt/26-27 Dt. 25.08.2026
Open Tender
Civil Works - Roads
Fixed-rate
365 days
Chandauli
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹13.9 L
Yes
Varanasi
11 Sept 2026
11 Sept 2026
24 Sept 2026
11 Sept 2026
24 Sept 2026
11 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement to tables 300.1 and 300.2 as per technical specification clause 301.5(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 14,000 | Cum | 73 | ₹10,22,000 |
| 2 | Providing, laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 1,027 | Cum | 2,780 | ₹28,55,060 |
| 3 | Providing, laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base Cement WBM Grading-III (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 1,365 | Cum | 3,300 | ₹45,04,500 |
| 4 | Providing and applying tack coat with bitumen VG-10 pressure distributor at the rate of 0.30 kg. per sqm on the prepared bituminous / granular surface cleaned with hydrulic broom as per Techinical Specification No. 503 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 9,750 | sqm | 25 | ₹2,43,750 |
| 5 | Providing laying and rolling of open graded premix carpet of 20mm thickness composed of 13.2mm and 11.2mm dalla aggregate either using 80/100 penetration grade bitumen VG-10 @1.46kg per sqm. To required line,grade and level to serve as wearing course on a previously prepared base,including mixing by mixol,laying and rolling with a three wheel 80-100 KN static roller capacity.as per technical specification clause 508.(Including cost of bitumen) As direction by the E/I (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 9,750 | sqm | 225 | ₹21,93,750 |
| 6 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510.As direction by the E/I (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 9,750 | sqm | 85 | ₹8,28,750 |
| 7 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 1,400 | sqm | 62.5 | ₹87,500 |
| 8 | PART B
Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024. Maintainance cost will adjusted as per final cost of construction and will be paid accordingly. (from serial number 1 to 7) | 1 | job | - | - |
| 8.1 | 1st year- maintainance cost 0% of Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 1 | job | - | - |
| 8.2 | 2nd year- maintainance cost 0.75 % of Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 1 | job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
Tendernotice_2.pdf
PDF • 0.70 MB
BOQ_2228728.xls
BOQ • 0.31 MB
Corrigendum.pdf
PDF • 1.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .