| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.6 LAdmitted-Finance | ₹80.6 L | L1 | Admitted-Finance |
| 2 | L2₹83.1 L+₹2.5 L (3.06%)Admitted-Finance | ₹83.1 L+₹2.5 L (3.06%) | L2 | Admitted-Finance |
| 3 | L3₹83.8 L+₹3.2 L (3.93%)Admitted-Finance | ₹83.8 L+₹3.2 L (3.93%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S PURNAGIRI CONSTRUCTION CO. PVT. LTD. L1 | R K CONTRACTOR L2 | DARSHEEN INFRA CONSULTANTS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres. | 2,609.67 | CUM | 207 ₹5,40,201.69 Lowest | 223 ₹5,81,956.41 | 210 ₹5,48,030.7 |
| 2.00 | Dewatering by Electric Pump | 2,685.6 | KWh | 18 ₹48,340.8 Lowest | 22 ₹59,083.2 | 20 ₹53,712 |
| 3.00 | Laying of LDPE film (250micron, 5.80m wide x 50m long) confirming to IS 2508 revised 1984 or its latest amendments, with the help of bamboos on the side slopes of ring bund in submerged area including cost of all materials. | 322 | SQM | 63 ₹20,286 Lowest | 74 ₹23,828 | 70 ₹22,540 |
| 4.00 | Providing and laying of Empty Cement Bags ( Gunny Bags) filled with local sand and tightened using sutli and carriage upto site including preparing subgrade before placing in position, also including supply of all material, labour, T&P etc required for proper completion of the work. | 2,022 | BAG | 23 ₹46,506 Lowest | 23 ₹46,506 Lowest | 25 ₹50,550 |
| 5.00 | Supplying & laying of drainage composite for use behind walls,between two different fills, alongside drains of road, below concrete lining of canals etc. Geocomposite for lanar drainage, realized by thermobonding a draining core in extruded monofilaments with two filtering nonwoven geotextiles that may also be working as separation or rotecting layers. The draining three dimensional core will have a “W” configuration as longitudinal parallel channels. Minimum thickness to be 7.2mm, with two filtering UV stabilized polypropylene nonwoven geotextile of minimum thickness of 0.75mm charecteristic opening size (O90) of 110 micron and tensile strength of 8.0 kN/m that will be working as separation or protecting layer, geocomposite having in plane flow capacity of 2.1 L / (m.s) at hydraulic gradient of 1.0 & 20 kPa pressure and tensile strength of 18 kN/m , with mass per unit area of 740 gsm, supplied in the form of roll for easy transportation to site of work as per detailed specification all complete as per directions of Engineer in charge. | 500 | SQM | 860 ₹4,30,000 Lowest | 895 ₹4,47,500 | 910 ₹4,55,000 |
| 6.00 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204(For height upto 5 m)P.C.C. grade M 20 Nominal mix (1:2:4) | 750 | CUM | 8,100 ₹60,75,000 | 8,075 ₹60,56,250 Lowest | 8,310 ₹62,32,500 |
| 7.00 | Removal of existing cement concrete wearing coat including its disposal complete as per Technical specification without causing any detrimental effect to any part of the bridge structure and removal of dismantled material with all lifts and lead upto 1000m (Thickness 75 mm) | 100 | SQM | 130 ₹13,000 Lowest | 160 ₹16,000 | 140 ₹14,000 |
| 8.00 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer in- charge .The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. | 100 | SQM | 180 ₹18,000 Lowest | 255 ₹25,500 | 200 ₹20,000 |
| 9.00 | Epoxy bonding of new concrete to old concrete | 100 | SQM | 630 ₹63,000 Lowest | 743 ₹74,300 | 650 ₹65,000 |
| 10.00 | Providing and applying high performance cementitious mortar on exposed/ eroded concrete surface. | 10,000 | KG | 81 ₹8,10,000 Lowest | 98 ₹9,80,000 | 92 ₹9,20,000 |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
24 Feb 2024, 11:30 amClosed
Group Sr. Manager (Contracts)
Procurement- Contract Divison, Tanakpur Power Station, Banbassa , Champawat
Treatment of leakage damaged area from guide wall cladding of left guide bund of Tanakpur Barrage
2024_NHPC_792282_1
NH/TPS/PnC/NIT/2023/ E99749/992/520 dt25/01/2024
Open Tender
Civil Works
Works
90 days
NHPC Ltd. Tanakpur Power Station, Banbasa
as per tender document
5 documents required · 5 mandatory
₹1,180
NHPC Ltd. Tanakpur Power Station
₹1.5 L
14 Mar 2024
27 Jan 2024
27 Feb 2024
27 Jan 2024
24 Feb 2024
27 Jan 2024
27 Jan 2024 - 10 Feb 2024
Amount
Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres.
Dewatering by Electric Pump
Laying of LDPE film (250micron, 5.80m wide x 50m long) confirming to IS 2508 revised 1984 or its latest amendments, with the help of bamboos on the side slopes of ring bund in submerged area including cost of all materials.
Providing and laying of Empty Cement Bags ( Gunny Bags) filled with local sand and tightened using sutli and carriage upto site including preparing subgrade before placing in position, also including supply of all material, labour, T&P etc required for proper completion of the work.
Supplying & laying of drainage composite for use behind walls,between two different fills, alongside drains of road, below concrete lining of canals etc. Geocomposite for lanar drainage, realized by thermobonding a draining core in extruded monofilaments with two filtering nonwoven geotextiles that may also be working as separation or rotecting layers. The draining three dimensional core will have a “W” configuration as longitudinal parallel channels. Minimum thickness to be 7.2mm, with two filtering UV stabilized polypropylene nonwoven geotextile of minimum thickness of 0.75mm charecteristic opening size (O90) of 110 micron and tensile strength of 8.0 kN/m that will be working as separation or protecting layer, geocomposite having in plane flow capacity of 2.1 L / (m.s) at hydraulic gradient of 1.0 & 20 kPa pressure and tensile strength of 18 kN/m , with mass per unit area of 740 gsm, supplied in the form of roll for easy transportation to site of work as per detailed specification all complete as per directions of Engineer in charge.
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204(For height upto 5 m)P.C.C. grade M 20 Nominal mix (1:2:4)
Removal of existing cement concrete wearing coat including its disposal complete as per Technical specification without causing any detrimental effect to any part of the bridge structure and removal of dismantled material with all lifts and lead upto 1000m (Thickness 75 mm)
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer in- charge .The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding.
Epoxy bonding of new concrete to old concrete
Providing and applying high performance cementitious mortar on exposed/ eroded concrete surface.
R K CONTRACTOR
DARSHEEN INFRA CONSULTANTS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .