Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-Finance NABAJIBAN P O BISHARPARA BIRATI KOLKATA 700 158 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700158 | ₹3.7 L | L1 | Accepted-Finance Being L1 |
| 2 | L2₹3.7 LRejected-Finance | ₹3.7 L | L2 | Rejected-Finance Being L2 |
| 3 | L3₹3.8 LRejected-Finance | ₹3.8 L | L3 | Rejected-Finance Being L3 |
| Sl No | Description | Qty | Unit | ANIKET COOLING AND REFRIGERATION CO L1 | SUPARNA REFRIZARATION L2 | CHATTERJEE ELECTRICALS L3 |
|---|---|---|---|---|---|---|
| 1.01 | Dismantling 2.5 TR damaged Compressor at server room, 1.5 TR at Dr. Rest Room & 2 TR at labour room after disconnecting every equipment by gas cutter, including Tools & Instrument | 3 | Item | 1,000 ₹3,000 | 948 ₹2,844 | 950 ₹2,850 |
| 2.01 | Reinstallation of 2 TR split type AC machine indoor & outdoor unit with bracket angle at Server Room, including Tools & Instrument | 1 | Item | 1,500 ₹1,500 | 995 ₹995 | 1,000 ₹1,000 |
| 3.01 | Overhauling of 1.5/2 TR Split indoor & outdoor unit & Window machines by jet pump chemical wash after opening the condenser coil cover, including Tools & Instrument | 40 | Nos | 700 ₹28,000 | 995 ₹39,800 | 1,200 ₹48,000 |
| 4.01 | Overhauling of 3 TR indoor & outdoor unit by jet pump chemical wash after opening the condenser coil cover, including Tools & Instrument | 4 | Nos | 850 ₹3,400 | 1,240 ₹4,960 | 1,250 ₹5,000 |
| 5.01 | Overhauling of 5 TR unit by jet pump chemical wash after opening the condenser coil cover,including Tools & Instrument | 6 | Nos | 1,000 ₹6,000 | 1,249 ₹7,494 | 1,250 ₹7,500 |
| 6.01 | Overhauling of 7.5 TR HAT type unit by jet pump chemical wash after opening the condenser coil cover, including Tools & Instrument | 3 | Nos | 1,250 ₹3,750 | 1,990 ₹5,970 | 2,000 ₹6,000 |
| 7.01 | Overhauling of 8.5 TR Ductable unit by jet pump chemical wash after opening the condenser coil cover, including Tools & Instrument | 2 | Nos | 1,000 ₹2,000 | 2,480 ₹4,960 | 2,500 ₹5,000 |
| 8.01 | Takendown,Shifting & reinstallation of indoor & outdoor machine | 1 | Item | 2,500 ₹2,500 | 980 ₹980 | 1,000 ₹1,000 |
| 9.01 | Disconnecting damage condenser coil 1 no. 5 TR A.C Machine disconnecting refrigerant hard round copper pipe, 5/8 suction line & 3/8 liquid line by gas welding at server room,including Tools & Instrument | 1 | Nos | 1,000 ₹1,000 | 21,200 ₹21,200 | 21,500 ₹21,500 |
| 10.01 | Replacement of new 2.5 TR capacity 3/8" compressor condenser coil make - Hitachi, installed by welding with 43% silver brazing at server room (Make- Hitachi/Voltas/ Daikin/ Bluestar/ Carrion) | 2 | Item | 21,500 ₹43,000 | 2,472 ₹4,944 | 2,500 ₹5,000 |
Tender Value
₹3.9 L
EMD Value
₹7,704
Closing Date
22 May 2026, 11:00 amClosed
AE/NKHESD
N.K.H. Electrical Sub Division Purta Bhawan
Urgent Dismantling, Shifting, and Overhauling of AC Units Associated with Civil Renovation at Salt Lake SD Hospital
2026_WBPWD_5013918_1
WBPWD/AE/NKHESD/NIQ- 01/Q of 26-27
Open Tender
ELECTRICAL WORKS ORG
7 days
KOLKATA
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,704
1 Jun 2026
12 May 2026
25 May 2026
12 May 2026
22 May 2026
14 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1.01 | Dismantling 2.5 TR damaged Compressor at server room, 1.5 TR at Dr. Rest Room & 2 TR at labour room after disconnecting every equipment by gas cutter, including Tools & Instrument | 3 | Item | 1.25 | ₹3.75 | itemH1Code1 |
| 2.01 | Reinstallation of 2 TR split type AC machine indoor & outdoor unit with bracket angle at Server Room, including Tools & Instrument | 1 | Item | - | - | itemH1Code2 |
| 3.01 | Overhauling of 1.5/2 TR Split indoor & outdoor unit & Window machines by jet pump chemical wash after opening the condenser coil cover, including Tools & Instrument | 40 | Nos | 100 | ₹4,000 | itemH1Code3 |
| 4.01 | Overhauling of 3 TR indoor & outdoor unit by jet pump chemical wash after opening the condenser coil cover, including Tools & Instrument | 4 | Nos | 53 | ₹212 | itemH1Code4 |
| 5.01 | Overhauling of 5 TR unit by jet pump chemical wash after opening the condenser coil cover,including Tools & Instrument | 6 | Nos | 10 | ₹60 | itemH1Code5 |
| 6.01 | Overhauling of 7.5 TR HAT type unit by jet pump chemical wash after opening the condenser coil cover, including Tools & Instrument | 3 | Nos | 11 | ₹33 | itemH1Code6 |
| 7.01 | Overhauling of 8.5 TR Ductable unit by jet pump chemical wash after opening the condenser coil cover, including Tools & Instrument | 2 | Nos | - | - | itemH1Code7 |
| 8.01 | Takendown,Shifting & reinstallation of indoor & outdoor machine | 1 | Item | 10 | ₹10 | itemH1Code8 |
| 9.01 | Disconnecting damage condenser coil 1 no. 5 TR A.C Machine disconnecting refrigerant hard round copper pipe, 5/8 suction line & 3/8 liquid line by gas welding at server room,including Tools & Instrument | 1 | Nos | 22 | ₹22 | itemH1Code9 |
| 10.01 | Replacement of new 2.5 TR capacity 3/8" compressor condenser coil make - Hitachi, installed by welding with 43% silver brazing at server room (Make- Hitachi/Voltas/ Daikin/ Bluestar/ Carrion) | 2 | Item | - | - | itemH1Code10 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_5081801.xls
BOQ • 0.41 MB
2911_II.pdf
Tender Documents • 0.54 MB
Download all tender documents and submit your bid