EE XII WRD
Gogol Margao
Construction of Culvert at Ch. 750mts of D3 Canal of S . I. P. in Survey No. 177-11 of V. P. Paroda Mullem in Salcete Taluka
2021_WRD_518_1
TECH/F10/08/2021-22/Sr2
Open Tender
Miscellaneous Works
Item Rate
60 days
Gogol Margao
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹12,330
13 Dec 2022
8 Oct 2021
17 Nov 2021
8 Oct 2021
12 Nov 2021
8 Oct 2021
Amount
Demolishing cement concrete 1:3:6 or richer mix including disposal of material within 50 m lead
Earth work in excavation in all type of strata comprising any of the materials such as soil, silt, sand, clay, gravel, moorums of all varieties, shingles,pebble, all type of conglomerates, laterite rock, soft rock, disintegrated rock, fissured, shattered, decomposed rock or weathered rock and all such other materials, as described under appendix to those specifications either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusivechiseling wedging etc in all conditons such as dry, moist,saturated, submerged, foul conditions etc. including pumping or bailing out water and disposing of excavated soil for all leads and all lifts etc complete as directed by Engineer in charge.
Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundation complete.
Providing & laying cement concrete 1:2:4(1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:a)All works upto plinth level
b)In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level.
Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size): a)All works upto plinth level
c)In beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases upto floor five level
Centering, shuttering including strutting propping &removal of forms for: i) Foundation, Footing Bases for columns
ii) Vertical surfaces such as retaing walls, return walls, Partitions, walls (any thickness) including attached Pilasters, Buttresses, Plinth and string courses, Fillets and the like
iv) Sides and Soffits of beams, Beam Haunchings, Cantilever, Girders, Bressumers and Lintels plinth beams not exceeding 1m in depth
xiii) Suspended floors, roofs landings, shelves & their supports
Providing High yield strength steel reinforcement bar (HYSD)/TMT steel reinforcement bar from secondary producers (Confirming to IS 1786 of 1986) for RCC work including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member.
Finishing the canal surface with 6mm cement mortar 1:3
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .