Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹56.2 L+₹3.1 L (5.91%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹59.9 L+₹6.8 L (12.9%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L3₹59.9 L+₹6.8 L (12.9%)Admitted-Finance 90A 10B 4 ALLAHPUR BAGHAMBARI GADDI ALLAHPUR ALLAHABAD UTTAR PRADESH 211006 INDIA | PRAYAGRAJ | UTTAR PRADESH | 211006 | L3 | Admitted-Finance | |
| 5 | L4₹61.1 L+₹8.0 L (15.1%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GANGA ELECTRICALS L5 | RAKESH ELECTRIC WORKS,ECID L2 | M/S Ajay Tripathi L3 | M/S P.K. Enterprises L4 | BHARDWAJ ENTERPRISES L1 | D N S ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Details of work | |||||||||
| 2.00INCREASING CAPACITY OF 33/11KV SUB STATION NEW PHAPHAMAU UNDER EUDD-TAGORE TOWN, PRAYAGRAJ | |||||||||
| 3.00 | Laying of 11 KV 3 x 300 Sqmm. XLPE power cable by digging 0.75 Mtr. deep trench, putting layer of sand in the bottom, ramming it, laying of cable over it RMT and covering the cable from sides and top by laying bricks, finally covering the same by earth and levelling of the same, all the materials, except cable, will be pvovided by the contractor. | 60 | RMT | 399 ₹23,940 Lowest | 400 ₹24,000 | 500 ₹30,000 | 1,000 ₹60,000 | 500 ₹30,000 | 500 ₹30,000 |
| 4.00 | Installation of 33/11 KV 10 MVA T/F on the transformer plinth. This work includes dragging loading, shifting, lifting and complete assembling after placing on the plinth. All special and ordinary T&P is to be arranged by the contractor. Special care is to be taken to avoid tilting of T/F and loss of transformer oil. Any damage in T/F will be chargeable to contractor. | 1 | NO | 25,999 ₹25,999 | 80,000 ₹80,000 | 70,000 ₹70,000 | 65,000 ₹65,000 | 5,000 ₹5,000 Lowest | 70,000 ₹70,000 |
| 5.00 | Replacement of complete 33 KV P.T (03 NO) on existing structure in switchyard .Work includes complete fitting of P.T. on structure carefully with making all connections of control cable . All require material as Nut bolts washer etc except 33 KV PT provided by contractor. | 1 | JOB | 4,999 ₹4,999 | 15,000 ₹15,000 | 5,000 ₹5,000 | 20,000 ₹20,000 | 2,500 ₹2,500 Lowest | 5,000 ₹5,000 |
| 6.00 | Replacement of complete 33 KV C.T. (03 NO) on existing structure in switchyard .Work includes complete fitting of P.T. on structure carefully with making all connections of control cable . All require material as Nut bolts washer etc except 33 KV CT provided by contractor. | 1 | JOB | 4,999 ₹4,999 | 15,000 ₹15,000 | 5,000 ₹5,000 | 20,000 ₹20,000 | 400 ₹400 Lowest | 5,000 ₹5,000 |
| 7.00 | Replacement of Damaged Jumfer in Switch yard as require related work with PG clamp with nut and bolts, T Connector (All require material as PG Clamp etc provided by contractor except Panther conductor. | 1 | Job | 15,999 ₹15,999 | 15,000 ₹15,000 | 10,000 ₹10,000 | 6,000 ₹6,000 Lowest | 10,000 ₹10,000 | 10,000 ₹10,000 |
| 8.00 | Replacement of complete 33 KV L.A. (03 NO) on existing structure in switchyard .Work includes complete fitting of P.T. on structure carefully with making all connections of control cable . All require material as Nut bolts washer etc except 33 KV L.A. provided by contractor. | 1 | JOB | 5,999 ₹5,999 | 15,000 ₹15,000 | 5,000 ₹5,000 | 5,000 ₹5,000 | 3,000 ₹3,000 Lowest | 5,000 ₹5,000 |
| 9.00 | Special earthing of T/F neutral by boring 2" dia 60 feet long G.I. pipe in the wet earth and connecting it with 35x6 mm. G.I. strip to T/F neutral giving half round turn at the T/F. Two separate earthing to be provided to T/F body by connecting it with earth mat by special earthing arrangement for earthing work. Material like strip of size 50x6/35x6 mm and G.I. pipe 2” dia 2.9 mm thick. All the material shall be provided by the contractor.(As per RESSPO) | 1 | JOB | 15,999 ₹15,999 | 35,000 ₹35,000 | 60,000 ₹60,000 | 20,000 ₹20,000 | 10,000 ₹10,000 Lowest | 60,000 ₹60,000 |
| 10.00 | Soil filling, Leveling and Reparing of existing complete boundry wall with flaster of substation boundory wall | 1 | JOB | 25,999 ₹25,999 | 30,000 ₹30,000 | 60,000 ₹60,000 | 1,200 ₹1,200 Lowest | 10,000 ₹10,000 | 60,000 ₹60,000 |
Tender Value
₹68.7 L
EMD Value
₹70,000
Closing Date
17 Jun 2026, 11:00 amClosed
Superintending Engineer
Ist Floor 33/11 KV Civil Lines Substation, Civil Line Prayagraj
CAP. INCREASING OF 33/11 KV NEW PHAPHAMAU SUBSTATION, INSTALLATION OF 250 KVA IInd POINT, CAP. INCREASING OF T/F 63 TO 100 KVA AND 100 TO 250 KVA AND CONSTRUCTION AND STRENGHTNING OF 11 KV U/g LINE AT DIFFERENT SUBSTATIONS UNDER EUDD-TAGORE TOWN
2026_PVVNV_1155673_1
07/EUDC-II/Pra/SE/2026-27
Open Tender
Electrical Works
Lump-sum
180 days
Prayagraj
As per Tender Specification
2 documents required · 2 mandatory
₹3,540
S.E. EUDC-II, Prayagraj
₹70,000
22 Jun 2026
30 May 2026
17 Jun 2026
30 May 2026
17 Jun 2026
30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Details of work | |||||
| 2INCREASING CAPACITY OF 33/11KV SUB STATION NEW PHAPHAMAU UNDER EUDD-TAGORE TOWN, PRAYAGRAJ | |||||
| 3 | Laying of 11 KV 3 x 300 Sqmm. XLPE power cable by digging 0.75 Mtr. deep trench, putting layer of sand in the bottom, ramming it, laying of cable over it RMT and covering the cable from sides and top by laying bricks, finally covering the same by earth and levelling of the same, all the materials, except cable, will be pvovided by the contractor. | 60 | RMT | - | - |
| 4 | Installation of 33/11 KV 10 MVA T/F on the transformer plinth. This work includes dragging loading, shifting, lifting and complete assembling after placing on the plinth. All special and ordinary T&P is to be arranged by the contractor. Special care is to be taken to avoid tilting of T/F and loss of transformer oil. Any damage in T/F will be chargeable to contractor. | 1 | NO | - | - |
| 5 | Replacement of complete 33 KV P.T (03 NO) on existing structure in switchyard .Work includes complete fitting of P.T. on structure carefully with making all connections of control cable . All require material as Nut bolts washer etc except 33 KV PT provided by contractor. | 1 | JOB | - | - |
| 6 | Replacement of complete 33 KV C.T. (03 NO) on existing structure in switchyard .Work includes complete fitting of P.T. on structure carefully with making all connections of control cable . All require material as Nut bolts washer etc except 33 KV CT provided by contractor. | 1 | JOB | - | - |
| 7 | Replacement of Damaged Jumfer in Switch yard as require related work with PG clamp with nut and bolts, T Connector (All require material as PG Clamp etc provided by contractor except Panther conductor. | 1 | Job | - | - |
| 8 | Replacement of complete 33 KV L.A. (03 NO) on existing structure in switchyard .Work includes complete fitting of P.T. on structure carefully with making all connections of control cable . All require material as Nut bolts washer etc except 33 KV L.A. provided by contractor. | 1 | JOB | - | - |
| 9 | Special earthing of T/F neutral by boring 2" dia 60 feet long G.I. pipe in the wet earth and connecting it with 35x6 mm. G.I. strip to T/F neutral giving half round turn at the T/F. Two separate earthing to be provided to T/F body by connecting it with earth mat by special earthing arrangement for earthing work. Material like strip of size 50x6/35x6 mm and G.I. pipe 2” dia 2.9 mm thick. All the material shall be provided by the contractor.(As per RESSPO) | 1 | JOB | - | - |
| 10 | Soil filling, Leveling and Reparing of existing complete boundry wall with flaster of substation boundory wall | 1 | JOB | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
Tender_No_07.docx
Tender Documents • 0.13 MB
BOQ_2165005.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .