| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Finance 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | L1 | Admitted-Finance | |
| 2 | L2₹7.1 L+₹20,356.05 (2.94%)Admitted-Finance CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | L2 | Admitted-Finance | |
| 3 | L3₹7.3 L+₹38,580.96 (5.57%)Admitted-Finance MAIN ROAD KUJJU RAMGARH JHARKHAND 825316 | KUJJU | RAMGARH | JHARKHAND | 825316 | L3 | Admitted-Finance | |
| 4 | Rejected-Technical ARGADA RAMGARH JHARKHAND 829101 | RAMGARH | JHARKHAND | 829101 | - | Rejected-Technical Did not responded the asked short fall documents. | |
| 5 | Rejected-Technical AT ARGADA DISTT RAMGARH JHARKHAND | - | Rejected-Technical Did not responded the asked short fall documents. |
| Sl No | Description | Qty | Unit | M/S ADITYA ENTERPRISES L1 | coalfields engineering works L2 | NEW NATIONAL ELECTRICAL WORKS L3 |
|---|---|---|---|---|---|---|
| 2.00A):- 315kva,3.3KV/550 Volt Distruction Transformer installed at 10 No.Sub- | ||||||
| 3.00 | Filtration of transformer oil | 500 | ltr | 32.4 ₹16,200 Lowest | 33.5 ₹16,750 | 34.2 ₹17,100 |
| 4.00 | Cost of LT Bushing Insulator with stud | 2 | nos | 6,910 ₹13,820 Lowest | 7,100 ₹14,200 | 7,295 ₹14,590 |
| 5.00 | Cost of HT Bushing Insulator with stud | 1 | nos | 6,910 ₹6,910 Lowest | 7,100 ₹7,100 | 7,295 ₹7,295 |
| 6.00 | Cost of Gasket | 3 | nos | 2,745 ₹8,235 Lowest | 2,820 ₹8,460 | 2,900 ₹8,700 |
| 7.00 | Complete painting and cleaning of transformer | 1 | job | 4,562 ₹4,562 Lowest | 4,690 ₹4,690 | 4,815 ₹4,815 |
| 8.00 | Labour cost @ 10% of Sl. No. 2 to 4 | 1 | l/s | 2,896.5 ₹2,896.5 Lowest | 2,976 ₹2,976 | 3,058.5 ₹3,058.5 |
| 9.00B);-500KVA,11KV/440 Volt Distribution Transformer installed at main Sub-station Sarubera colony | ||||||
| 10.00 | Filtration of transformer oil | 600 | ltr | 32.4 ₹19,440 Lowest | 33.5 ₹20,100 | 34.2 ₹20,520 |
| 11.00 | Cost of LT Bushing Insulator with stud | 3 | nos | 6,910 ₹20,730 Lowest | 7,100 ₹21,300 | 7,295 ₹21,885 |
Tender Value
Refer Docs
EMD Value
₹9,500
Closing Date
26 Aug 2025, 6:55 pmClosed
SO(ENM)
GM UNIT KUJU
Oil filtration and repairing /maintenance of different rating of distribution Transformer installed at different location of Sarubera Project Under Kuju Area.
2025_CCL_341651_1
GM (K)/EnM/eTender/25-26/133
Open Tender
Electrical and Maintenance Works
Item Rate
20 days
GM UNIT KUJU
2 documents required · 2 mandatory
₹9,500
31 Oct 2025
16 Aug 2025
27 Aug 2025
16 Aug 2025
26 Aug 2025
16 Aug 2025
16 Aug 2025 - 23 Aug 2025
Amount
A):- 315kva,3.3KV/550 Volt Distruction Transformer installed at 10 No.Sub-
Filtration of transformer oil
Cost of LT Bushing Insulator with stud
Cost of HT Bushing Insulator with stud
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @ 10% of Sl. No. 2 to 4
B);-500KVA,11KV/440 Volt Distribution Transformer installed at main Sub-station Sarubera colony
Filtration of transformer oil
Cost of LT Bushing Insulator with stud
Cost of HT Bushing Insulator with stud
Cost of Breather with silica gel
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @ 10% of Sl. No. 2 to 5
C):-250KVA,11KV/440Volt Distribution Transformer installed at main Sub-station Sarubera colony
Filtration of transformer oil
Cost of LT Bushing Insulator with stud
Cost of HT Bushing Insulator with stud
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @ 10% of Sl. No. 2 to 4
D):-250KVA,11KV/440 Volt Distribution Transformer installed at main sub-station Sarubera colony
Filtration of transformer oil
Cost of LT Bushing Insulator with stud
Cost of HT Bushing Insulator with stud
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @ 10% of Sl. No. 2 to 4
E):-250KVA,11KV/440 Volt Distribution Transformer installed at main sub-station Sarubera Colony
Filtration of transformer oil
Cost of LT Bushing Insulator with stud
Cost of HT Bushing Insulator with stud
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @ 10% of Sl. No. 2 to 4
F):-250KVA,11KV/440 Volt Distribution Transformer installed at main Sub-Station Sarubera Colony
Filtration of transformer oil
Cost of LT Bushing Insulator with stud
Cost of HT Bushing Insulator with stud
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @ 10% of Sl. No. 2 to 1
G):-100 KVA,11KV/440 Volt Distribution Transformer installed at main sub-station Sarubera Colony
Filtration of transformer oil
Cost of LT Bushing Insulator with stud
cost of gasket
Complete painting and cleaning of transformer
Labour cost @ 10% of Sl. No. 2 & 3
H):-500KVA,11KV/440 Volt Distribution Transformer installed at IWSP Sarubera
Filtration of transformer oil
Cost of LT Bushing Insulator with stud
Cost of HT Bushing Insulator with stud
Cost of Breather with silica gel
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @ 10% of Sl. No. 2 to 5
I):-500KVA,11KV/440 Volt Distribution Transformer installed at IWSP Sarubera
Filtration of transformer oil
Cost of HT Bushing Insulator with stud
Cost of Breather with silica gel
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @ 10% of Sl. No. 2 to 4
J):- 250KVA,11KV/440 Volt Distribution Transformer installed at IWSP Sarubera
Filtration of transformer oil
Cost of LT Bushing Insulator with stud
Cost of HT Bushing Insulator with stud
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @ 10% of Sl. No. 2 to 4
K):-250KVA,11KV/440 Volt Distribution Transformer installed at work shop Sarubera
Filtration of transformer oil
Cost of LT Bushing Insulator with stud
Cost of HT Bushing Insulator with stud
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @ 10% of Sl. No. 2 to 4
L):-250KVA,11KV/440 Volt Distribution Transformer installed at work shop Sarubera
Filtration of transformer oil
Cost of LT Bushing Insulator with stud
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost @ 10% of Sl. No. 2 & 3
Profit@10%
Total impact of GST for the purpose of CTC
coalfields engineering works (BID ID -1178094)
NEW NATIONAL ELECTRICAL WORKS (BID ID -1178107)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .