Tender Value
₹8.3 L
EMD Value
₹20,819
Closing Date
4 Jan 2023, 6:00 pmClosed
AEE,PyIP(M) Sub Division,Mattannur at Veliyambra
Office of the Assistant Executive Engineer,PYIP Mace Sub Division Mattannur at Veliyambra PIN 670 702
PyIP_Rectification of Mahe Branch Canal near Ch_14_500 km for the year 2022_23
2022_Irrig_543473_1
IRR/PI/TR/4272/2022_5_1_1/1
Open Tender
Civil Works - Canal
Item Wise
180 days
Pattyam
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,840
Yes
₹20,819
Yes
22 Feb 2023
26 Dec 2022
9 Jan 2023
26 Dec 2022
4 Jan 2023
26 Dec 2022
Amount
Lining
2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD10526/2022-2023:od22844/2020_2021/P1 : Laterite roughly dressed stones of size 30 x 20 x 20 cm laid dry pitching including cost and conveyance of all materials and all labours charges etc complete.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
ABUBAKAR MUSALIARAGATH
Bidder Name
ABUBAKAR MUSALIARAGATH
Shajeer K T
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_793581.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .