Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹17.2 L−₹6,576.39 (0.38%)Accepted-AOC | ₹17.2 L−₹6,576.39 (0.38%) | 2 | Accepted-AOC L1 |
| 2 | 1₹17.3 LRejected-AOC POLICE LINE ROAD KUMOUR PITHORAGARH | ₹17.3 L | 1 | Rejected-AOC L2 |
| 3 | 3₹17.7 L+₹37,114.79 (2.15%)Rejected-AOC | ₹17.7 L+₹37,114.79 (2.15%) | 3 | Rejected-AOC L1 |
Tender Value
₹17.4 L
EMD Value
₹75,000
Closing Date
21 Aug 2023, 4:00 pmClosed
SUPERINTENDING ENGINEER
SE OFFICE EDC PITHORAGARH
CONSTRUCITON OF 11 KV LT LINE AT SECTION NACHNI FOR PEYJAL PUMP UNDER JJM SCHEME UNDER EDD DHARCHULA
2023_UPCL3_61805_1
10/EDC(P)/2023-24
Open Tender
Electrical Works
Turn-key
365 days
NACHNI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EE EDD UPCL PITHORAGARH
₹75,000
20 Oct 2023
8 Aug 2023
22 Aug 2023
8 Aug 2023
21 Aug 2023
8 Aug 2023
Amount
SUPPLY OF CENTRALISED MATERIAL
Steel pole 8.5 mtr. SP-23 BPHD
Steel pole 8.5 mtr. SP-21 BPHD
TF 1/0.4 KV 100 KVA
LT XLPE Cable 1x95 sq mm
ACSR Rabbit conductor
ACSR weasel conductor for 11 KV earth
M.S. channel 100×50 mm
M.S. angle 75x75x6 mm. for gaurding &river crossing
M.S. angle 50x50x6 mm.
11 KV Polyemer Disc insulator
11kv Disc fitting 45 KN
11 KV polymer pin insulator with pin
Earthing rod 20 × 2500 mm.
gi wire 5mm/6swg for 11 kv line gurading or pole earthing
Stay Set 16X1800 mm.
LT XLPE AB Cable3x95+1x70 sq mm
Stay wire 7/10 SWG
LIGHTINING ARRESTER 9kv 10 ka
g s strip 35x6 mm
11 kv go switch
SUPPLY OF NON CENTRALISED MATERIAL
Top channel clamp for SP-23 with nut & bolt
holding clamp for tpmo and fuse set tf base
top channel clamp for guarding 11 kv line
Top bracing set clamp for SP-23 with N&B
Bottom bracing set clamp for SP-23 with N&B
Earth wire clamp for SP-23 with N&B
Stay clamp with N&B for SP-23 double ended
Stay clamp with N&B for SP-23 single ended
LT J Hook clamp with nut &bolt
LT Dead end clamp with n&b
LT suspension clamp
Stay clamp with N&B for SP-21 single ended
11 KV Fuse Set
LABOUR CHARGE
Cartage of Steel poles from concer firm to construction site with loading & unloading at both points approx distance 600 Km
Steel pole 8.5 mtr. SP-23 (BPHD)
Steel pole 8.5 mtr. SP-21 (BPHD)
Other material(Centralised Items)
T/F 11/0.4 100 KVA
Head load cartage of following material from road to site approx distance 10 Km
Steel pole 8.5 mtr. SP-23 (BPHD)
Steel pole 8.5 mtr. SP-21 (BPHD)
Other material(Centralised Items+De-Centralised Items)
T/F 11/0.4 100 KVA
Exavation of earth for pole pit of size 0.9x0.9x1/6 of full lenth of polestay pit size 0.6x0.6x1.2 mtrin all types of soil including proper dressing of including proper dressing of sides and ramming of bottom including getting out the excavted soil and disposelof surplus and disposel of surplus excaveted soll as directed complete work.
Steel pole 8.5 mtr. SP-23(0.765X121)
Steel pole 8.5 mtr. SP-21(0.765X2)
erection of pole support as per RESSPO specification of the following types of poles in boulder mixed soil, grouting of support in CC 1:4:8 block incuding cost of ballast,cement and sand, back filling of soil and boulders in pit and ramming filling of accessories of the pole, leveling and erection of pole
SP-23 (with CC) Double Pole
SP-21 (with CC) Single Pole
Grouting of pole in size 0.45x0.45x1/9 of the supprt in cc ratio 1:4:8 block including cost of cement sand and stone ballast back filling of soil and boulders in pit and ramming and proper allignment leveling as per resspo construction manual
Steel pole 8.5 mtr. SP-23(0.2565X20)
Steel pole 8.5 mtr. SP-21(0.2653X03)
Muffing of poles with CC1;3;6 block and 45 Cm hight from ground level including cost of ballast, cement & sand. SP-23
Fabriction of MS Channel, angle iron after cutting in requeired sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc as per RESSPO
Exavation of earth for stay pit size 0.6x0.6x1.2 mtrin all types of soil including proper dressing of sides and ramming of bottom including getting out the excavted soil and disposelof surplus and disposel of surplus excaveted soll as directed complete work.(0.432X51)
Fixing, tightening and nozzling of stay with pole and stay rod for 11 KV
Grouting of stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 block including cost of cement sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling.(51x0.108)
Erection & earthing of support with MS Earth rod of 2.5 Mtr long incuding exavation of pit and digging of MS rod proper depth and connecting the earth electrode with the GI wire as per instruction manual
Laying, spreading, stringing and sagging of 11 KV line in 3 P 4 W of the Rabbit conductor with GI earth wire complete including fixing of all accessories in 3 Nos conductor in parallel with binding and jupering as per profile and sagging chart
Laying, spreading, stringing and sagging of LT line with ACSR Weasel conductor 3 P 4W
Route clearance by cutting of tree branches/ proning, loping and chopping of trees for 11 KV line
Earthing of distribution T/F incuding digging of pit of size 2.5 mtr depth and make hole of size 150mm. Placing of earthing electrode(to be supplied by contractor as per drawing No A) as drawing B, connecting the same with GI strip(to be supplied by contractor) of size 35x6 mm as per drawing C for a minimum length 6 mm, treatment of soil with highly conductive subustance as per IS 30343 complete in all respect, result of earthing resistance to be recorded in MB before and after instalation of earthing. the earth resistance after earthing should be less then 1 Ohm.
Mounting/fixing of TPMO on doble pole structure including making of connection complete work.
Mounting/fixing of fuse set on doble pole structure including making of connection complete work.
Mounting & fixing of LA set(3 No) on double pole structure including making all connection vy GI strip size 35x6 mm to earth point(incuding cost of GI strip)
Installation/Mounting following 100 KVAT/F on Plinth and fixing of channel and making all connections of HT and LT and its complete commissioning.
Construction of transformer plinth work with size 2x2x1.1 Mtr above ground level and 0.6 mtr below ground level includung cost of cement ,brick ,ballast and sand
Excavation of earth 2.1x2.1x0.6 mtr
Cement concreating work in ratio 1:4:8 cc(2.1X2.1X0.15)
Brick work in 1:4(2X2X1.4)
RCC work 1:2:4 CC 15 Cm thick(2X2X0.15)
Cement plaster on side wall in 1:4(4x1.1X2)
Erection, providing and fixing of wire Mesh fencing around Plinth as per RESSPO
Erection providing and fixing of 50X35 mm wire mesh of size 2(2+4) meter around plinth and toe wall duly welded with frame of M.S. angle iron 35X35X6 mm and strip of size 35X6mm in mid of each side along with wire mesh(width of wire mesh 1.5 meter) with the height of 1.5 meter above the plinth and 2 meter above the toe wall with 01 no legs in the ration in block of size 0.25X0.25X0.45 meter including gravelling of shingle of size 20 to 40 mm and complete painting of wire mesh with aluminum paint with two coat(including the cost of cement and all material)
Construction of 01(DP-1) protection wall for 11 KV Structure
Excavation in all type of soil including ramming and dressing of surface DP(1x5.94)
Base concreting in 1:6:12 cc DP(1x1.98)
R&R Stone Massonary in 1:6 course fine sand & cement DP(1x25.19)
Top concreting in 1:2:4 cc DP(1x0.45)
HP Stone Filling DP(1x19.49)
Saun Engineering and Construction Co P Ltd
vijay electricals
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .