Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-AOC | ₹2.9 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹3.0 CrRejected-Finance 70 INDUSTRIAL AREA PHASE 1 PANCHKULA PANCHKULA HARYANA 134109 | PANCHKULA | HARYANA | 134109 | ₹3.0 Cr | L2 | Rejected-Finance Higher rates |
| Sl No | Description | Qty | Unit | S.R.Paryavaran Engineers Pvt Ltd L2 | Eco Paryavaran Engineers And Consultants Pvt. Ltd. L1 |
|---|---|---|---|---|---|
| 1.01 | Design, Construction, Installation, commissioning of 0.5 MLD STP at MIGC Raikot based on any suitable, sustainable and proven technology (MBBR/MBR/SBR) & other appurtenant works on turnkey basis as per DNIT including Operation & Maintenance for a period of 60 months after stabilization period of 3 months or more. | 1 | Job | 2,95,00,000 ₹3.0 Cr | 2,89,00,000 ₹2.9 Cr |
| 1.02 | Credit for sludge | 1 | LS | - | 5,000 -₹5,000 |
| 1.03Guaranteed Power Consumption for Defect Liability Period of 1 (one year) and 4 years of O&M to be quoted by the bidder per year by the bidder in KVAh. | |||||
| 1.04 | For 1st year i.e. Defect Liability Period+O&M | 1 | KVAh | 400 ₹12.4 L | 250 ₹7.8 L |
| 1.05 | For 2nd year (O & M) | 1 | KVAh | 400 ₹12.4 L | 250 ₹7.8 L |
| 1.06 | For 3rd year (O & M) | 1 | KVAh | 400 ₹12.4 L | 250 ₹7.8 L |
| 1.07 | For 4th year (O&M) | 1 | KVAh | 400 ₹12.4 L | 250 ₹7.8 L |
| 1.08 | For 5th year (O&M) | 1 | KVAh | 400 ₹12.4 L | 250 ₹7.8 L |
| 2.00 | Cost of the area required for setting up of STP in sq. yard (i.e. Rs. 9000/ sq.yrd x Area required in sq. yrd (to be informed by the bidder)). The area to be quoted by the bidder is minimum 1500/-sq.yd or more as per the design to be submitted by the bidder | 1 | LS | 1,35,00,000 ₹1.4 Cr | 1,35,00,000 ₹1.4 Cr |
Tender Value
Refer Docs
EMD Value
₹6 L
Closing Date
3 Nov 2025, 11:00 amClosed
XEN1
PSIEC Chandigarh
Construction of STP 0.5 MLD at MIGC Raikot
2025_IC_151948_1
PSIEC/STP/Raikot
Open Tender
Miscellaneous Works
365 days
MIGC Raikot
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹6 L
6 Jan 2026
13 Oct 2025
4 Nov 2025
13 Oct 2025
3 Nov 2025
13 Oct 2025
Amount
Design, Construction, Installation, commissioning of 0.5 MLD STP at MIGC Raikot based on any suitable, sustainable and proven technology (MBBR/MBR/SBR) & other appurtenant works on turnkey basis as per DNIT including Operation & Maintenance for a period of 60 months after stabilization period of 3 months or more.
Credit for sludge
Guaranteed Power Consumption for Defect Liability Period of 1 (one year) and 4 years of O&M to be quoted by the bidder per year by the bidder in KVAh.
For 1st year i.e. Defect Liability Period+O&M
For 2nd year (O & M)
For 3rd year (O & M)
For 4th year (O&M)
For 5th year (O&M)
Cost of the area required for setting up of STP in sq. yard (i.e. Rs. 9000/ sq.yrd x Area required in sq. yrd (to be informed by the bidder)). The area to be quoted by the bidder is minimum 1500/-sq.yd or more as per the design to be submitted by the bidder
S.R.Paryavaran Engineers Pvt Ltd (BID ID -693692)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_307810.xls
BOQ • 0.28 MB
DNIT1.pdf
Tender Documents • 12.12 MB
DNIT2.pdf
Tender Documents • 11.29 MB
Download all tender documents and submit your bid