Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.1 CrAccepted-AOC QUADIRIYA MANZIL MARA CHENGALA KASARAGOD | CHENGALA | KASARAGOD | KERALA | ₹16.1 Cr | L1 | Accepted-AOC Agreement Executed by LI |
| 2 | L2₹17.8 CrRejected-AOC | ₹17.8 Cr | L2 | Rejected-AOC Agreement Executed by LI |
| 3 | L3₹18.4 CrRejected-Finance | ₹18.4 Cr | L3 | Rejected-Finance Agreement executed by L1 |
| 4 | L4₹19.6 CrRejected-Finance KANNUR | KERALA | 670001 | ₹19.6 Cr | L4 | Rejected-Finance Agreement executed by L1 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Prequalification from CE |
| Sl No | Description | Qty | Unit | ABDUL RAHIMAN T.A L3 | THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY L4 | ABM4Builders L2 | M S BUILDER PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|---|
| 1.00Bridge Proper | |||||||
| 1.00 | OD304615/2024-2025:Providing steel liner 6mm thick for pile foundation including Fabricating and setting out as per Detailed Drawing | 17.75 | tonne | 1,45,000 ₹25.7 L | 1,41,000 ₹25.0 L | 1,37,756.2 ₹24.4 L | 1,28,121.47 ₹22.7 L |
| 1.00 | 12.25.3:Bored cast-in-situ M35 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-1200 mm | 929 | metre | 25,000 ₹2.3 Cr | 17,500 ₹1.6 Cr | 16,654.55 ₹1.5 Cr | 15,489.72 ₹1.4 Cr |
| 1.00 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 1,061.38 | cum | 100 ₹1.1 L | 210 ₹2.2 L | 88.82 ₹94,271.33 | 82.61 ₹87,680.19 |
| 1.00 | 12.39:Providing and laying of PCC M15 leveling course 100 mm thick below the pile cap | 8.41 | cum | 8,192.82 ₹68,942.58 | 8,000 ₹67,320 | 8,808.92 ₹74,127.06 | 8,192.82 ₹68,942.58 |
| 1.00 | 12.38.D.2:Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification R C C Grade M35 - Using Batching plant, Transit Mixer and Concrete pump | 158.05 | cum | 9,000 ₹14.2 L | 10,000 ₹15.8 L | 9,266.75 ₹14.6 L | 8,618.63 ₹13.6 L |
| 1.01 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 157.06 | MT | 1,00,885.4 ₹1.6 Cr | 99,000 ₹1.6 Cr | 1,08,471.98 ₹1.7 Cr | 90,796.86 ₹1.4 Cr |
| 1.01 | 13.5.H.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m | 165.63 | cum | 10,000 ₹16.6 L | 12,000 ₹19.9 L | 9,675.56 ₹16.0 L | 8,998.85 ₹14.9 L |
| 1.01 | 13.5.H.q.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height 5m to 10m | 25.11 | cum | 10,000 ₹2.5 L | 12,000 ₹3.0 L | 9,886.67 ₹2.5 L | 9,195.19 ₹2.3 L |
| 1.01 | 13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications | 28.61 | MT | 1,01,375.19 ₹29.0 L | 99,000 ₹28.3 L | 1,08,998.6 ₹31.2 L | 91,237.67 ₹26.1 L |
Tender Value
₹16.6 Cr
EMD Value
₹5 L
Closing Date
24 Jan 2026, 11:00 amClosed
Superintending Engineer, PWD Bridges,North Circle
Superintending Engineer, PWD Bridges,North Circle
GENERAL Reconstruction of Unniyal bridge Reconstruction of Unniyal bridge across Canoli Canal at Tanur LAC in Malappuram District General Civil Work
2026_PWD_826847_1
PWD/BR/TR/5996/2025_5_1_1/1
Open Tender
Civil Works - Bridges
540 days
Tanur LAC
Please refer Tender documents.
14 documents required · 14 mandatory
₹16,540
Yes
₹5 L
Yes
16 Mar 2026
9 Jan 2026
27 Jan 2026
9 Jan 2026
24 Jan 2026
9 Jan 2026
Bridge Proper
OD304615/2024-2025:Providing steel liner 6mm thick for pile foundation including Fabricating and setting out as per Detailed Drawing
12.25.3:Bored cast-in-situ M35 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-1200 mm
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
12.39:Providing and laying of PCC M15 leveling course 100 mm thick below the pile cap
12.38.D.2:Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification R C C Grade M35 - Using Batching plant, Transit Mixer and Concrete pump
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
13.5.H.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m
13.5.H.q.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height 5m to 10m
13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
OD271341/2025-2026:Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete as per drawing and approved Technical Specifications.
OD304613/2024-2025:Furnishing and Placing PSC Grade M45 Using Batching Plant, Tansit Mixer and Concrete Pump in Superstructure as per drawing and technical specification, For Bowstring arch and Slab including form work
14.1.F.1:Furnishing and Placing PSC Grade M45 Using Concrete Mixer in super-structure as per drawing and Technical Specification
14.1C.2:Furnishing and Placing Reinforced Cement Concrete Grade M30 Using Batching Plant, Transit Mixer and Concrete Pump in super-structure as per drawing and Technical Specification
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
14.3:High tensile steel wires/strands including all accessories for stressing, stressing operations and grouting complete as per drawing and Technical Specifications
OD304614/2024-2025:Providing, fixing and erecting 50mm dia MS hollow (Grade-304)pipe railing in 2rows duly painted on medium weight steel MS plate 10mm Thick (100 X100 SHS) , 0.55m above RCC crash barier. 1 m c/c, complete as per approved drawing including painting over suitable primer
OD304612/2024-2025:Suplying and fixing MAC alloy M-460 galvanized steel tendon 76mm dia with all fittings cost conveyance etc as per std desing as directed by departmental officers. For Bow String girder up to height 10m as per design drawing.
14.22:Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation
OD304609/2024-2025:Providing drainage spout with 110mm dia.PVC Pipes 100cm long working pressure 4kg/sq.cm including cost of materials, conveyance, labour charges etc. complete.
Approach road
12.9.C:Providing and constructing one span service road to reach island location from one pier location to another pier location
2.4.2.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means
OD205353/2025-2026:Engaging Special Mazdoor for cutting and removing fallen trees and standing treses including all charges etc.complete
OD205354/2025-2026:Engaging Man Mazdoor for helping wood cutting special labours including all charges etc.
OD205355/2025-2026:Engaging JCB (Hydraulic Excavator) for shifting and stacking the cutting wood at a suitable place near the site and removing the obstruction such as unserviceable soil and dumped earth along embankments of carriageway etc. complete
13.9.A:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
14.10:PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.
14.11:Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification.
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
OD14849/2025-2026:Providing and construction of a gabion structure for retaining earth with segments of wire crates of size 7 m x 3 m x 0.6 m each divided into 1.5 m compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10 sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 x 100 mm, filled with boulders with least dimension of 200 mm, all loose ends to be tied with 4 mm galvanised steel wire
OD14914/2025-2026:Laying of a geotextile filter between rubble structure and embankment to prevent escape of the embankment material through the voids of the stone structure/cement concrete blocks as well as to allow free movement of water without creating any uplift head on the pitching.
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
13.5.A:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M15 - Height upto 5m
13.10:Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
OD304617/2024-2025:Dry rubble masonry with good quality blasted rubble including through and bond stone, and packing to compactness to lines and levels. cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.8.B:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 (Without formwork)
13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
OD304618/2024-2025:PVC WEEP HOLES - Providing weep holes using 75mm dia. PVC pipes working pressure 4kg/sq.cm including cost of materials, conveyance, labour charges etc. complete.
3.16:Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
3.17:Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
5.15:Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen (VG - 30) meeting the requirements given in table 500-40, prepared by using a mastic cooker and laid to the required level and slope after cleaning the surface, including providing an antiskid surface with bitumen precoated fine grained hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into the surface when the temperature of surfaces is not less than 1000C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 516
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means
4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.b:Providing and applying tack coat with bitumen emulsion (RS) using emulsion pressure distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared Granular Surface cleaned with mechanical broom.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.3.2.a:Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with a bituminous binder (VG 30), transported to the site, laid over a previously prepared surface with paver finisher to the required grade, level, and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction For Grading II - (19 mm nominal size)
5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size)
OD20167/2025-2026:Filling with Quarry Muck Filling up low lying and water logged areas with quarry muck, spreading in layers, leveling the top at site and consolidation by smooth wheeled roller, etc complete for improving the CBR value of subgrade. Details of cost for 300 cum
OD20170/2025-2026:Supplying and stacking well matured straight 6m long coconut post having average diameter on 25cm for driving down through various strata below bed level including cost conveyance labour charges etc complete.
OD20169/2025-2026:Driving down coconut pile to lines and levels through sandy soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 5 numbers per day 6X5=30m Details for 30m length.
OD20168/2025-2026:Cutting and removing the excess length of Wooden/ Coconut piles to lines and levels and removing the cut end of piles and stacking within 150m.
14.1C.2:Furnishing and Placing Reinforced Cement Concrete Grade M30 Using Batching Plant, Transit Mixer and Concrete Pump in super-structure as per drawing and Technical Specification
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Road safety and Signages
8.4.1:Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting vide clause 801.3.3 fixed over aluminum sheeting, 2 mm thick/aluminum composite material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 90 cm equilateral triangle
8.4.3:Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting vide clause 801.3.3 fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 60 cm circular
8.4.12:Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed over aluminum sheeting, 2 mm thick/aluminum composite material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 50cmx 60 cm rectangular (Single chevron etc.)
8.5:Providing and fixing of direction and place identification retro-reflectorised sign with 7 years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
8.6:Providing and fixing of direction and place identification retro-reflectorised sign with 7 years warranty manufactured as per IRC :67 High Intensity Micro Prismatic (Type IV) grade sheeting fixed over aluminum sheeting, 2 mm thick/aluminum composite material sheeting 4 mm thick with an area exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on suitably designed GI pipe pole not less than 50mm NB , 2 Nos. confirming to IS 1239, firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
8.35:Providing and fixing reflective road studs (Raised Pavement Marker) of ' category A' made out of ASA/HIPS/ABS moulded body with shanks and conforming to ASTM D 4280, strong enough to support a load of more than 13.635 T when tested in accordance with ASTM D 4280, reflective panel confirming to ASTM D 788, and reflectivity conforming to clause 804.4. including installation, drilling, fixing with adhesive etc. with 2 years warranty for the road stud as well as for in field performance as per clause 804.7.3 Road Markers/Road Stud with Lense Reflector :-
55.10.1:Providing and erecting retro-reflectorised Object Hazard Marker 300mm x 900mm Providing and erecting retro-reflectorised Object Hazard Marker sign with 07 years warranty, manufactured as per IRC 67 USING Type IV ASTM D 4956-09 micro prismatic retro reflective sheeting fixed over aluminium sheetig, 2 mm thick / aluminium composit material sheeting 4 mm thick with suitable back support frame and supported on a mild steel angle iron post 75mmx75mmx6mm, firmly fixed 30cm above ground level by means of properly designed foundation with M 15 grade cement concrete 30cmx30x45cm, 45cm below ground level including painting all non-reflective faces with epoxy paint 2 coats over epoxy primer as per approved drawing and clause 801.300 mm x 900 mm
55.16:Providing and fixing guard post Providing and fixing guard post of size 200mmx200mm, 1400mm long, 800mm above ground level and 600mm below GL. casted in M20 Grade concrete reinforced with 4 nos of 8mm dia longitudinal bars and 6mm dia stirrups @ 100mm c/c, firmly fixed in position by means of foundation of size 0.5mx0.5mx0.7m in M15 grade concrete below ground level including painting 2 coats on exposed surface with synthetic enamel paint in alternate white & black band 20cm wide
55.14:Providing and fixing retro-reflectorised ceramic tilesProviding and fixing retro-reflectorised ceramic tiles of size 10cmX20cm using High Intensity Micro Prismatic (Type IV) grade sheeting with 7 years warranty fixed over Ist quality ceramic glazed tiles including cost of glue, cutting charges, fixing with suitable adhisive on concrete or other surface etc complete.
Inauguration stone
OD304605/2024-2025:Providing and fixing 18mm thick gang saw cut , mirror, polished, premoulded and prepolished, machine cut for inauguration granite stone of required size, approved shade, color and texture laid over 12mm thick base cement mortar 1:3 (1 cement :3coarse sand ), joints treated with white cement, mixed with matching pigment , epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. area of slab upto 0.50sqm
OD304604/2024-2025:Engraving letters in hard stone (16.21 DAR)
OD304606/2024-2025:Supplying and fixing 18mm thick granite slab of 60cm x 30cm size suitable color and fixing in bridges or other masonry structures including engraving letters taking levels and marking on board etc. complete for high flood level marking
Temporary Road during Construction
OD21731/2025-2026:RING BUND Type -I - Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 3.00m including labour dismantling the bund after completion of the work etc. complete.
OD21730/2025-2026: Bailing out water Using 5HP Pump - Bailing out water with 5HP engine and pump set including conveyance to site and erection, cost of fuel, lubrication oil and other stores, pay of staff et ccomplete
12.1.5.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Marshyn Soil - Depth upto 3 m - Mechanical Means -
OD21735/2025-2026:Supplying and stacking well matured straight 6m long coconut post having average diameter on 25cm for driving down through various strata below bed level including cost conveyance labour charges etc complete.
OD21734/2025-2026:Driving down coconut pile to lines and levels through sandy soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 5 numbers per day 6X5=30m Details for 30m length.
OD21733/2025-2026:Cutting and removing the excess length of Wooden/ Coconut piles to lines and levels and removing the cut end of piles and stacking within 150m.
OD21736/2025-2026:Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site
9.2.B:Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first-class bedding of granular material in a single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in headwalls and parapets. 1200 mm dia
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
OD21737/2025-2026:Dry rubble masonry (without concrete levelling course) with good quality blasted rubble (without bond stone), and packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
OD21738/2025-2026:Laying of a geotextile filter between rubble structure and embankment to prevent escape of the embankment material through the voids of the stone structure/cement concrete blocks as well as to allow free movement of water without creating any uplift head on the pitching.
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
OD21732/2025-2026:Filling with Quarry Muck filling up low lying and water logged areas with local material/quarry muck, spreading in layers, levelling the top at site and consolidation by ramming etc. complete for improving the CBR value of subgrade (LSGD approved OD No. 51.2.3)
3.16:Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
8.20:Providing, Fixing and erecting 50 mm dia GI pipe railing in 3 rows duly painted on Tubular Steel Railing on Medium Weight Steel Channel ( ISMC series) 100 mm x 50 mm, 1.2 metres high above ground, 2 m centre to centre, complete as per approved drawings including painting over suitable primer .
8.9:Providing and applying two coats of ready mixed paint of approved brand on steel surface after through cleaning of surface to give an even shade
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.07 MB
BOQ_1387176.xls
BOQ • 0.37 MB
sbd.pdf
Tender Documents • 4.99 MB
Download all tender documents and submit your bid