Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
1 Mar 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer RnB Division Ganderbal
Executive Engineer RnB Division Ganderbal
Construction of Bridge Larsun Bardullah MS Larsun V2B3
2021_PWDJK_117856_6
NIT No.187/2020-21
Open Tender
Civil Works
Item Rate
20 days
Ganderbal
As per NIT
5 documents required · 5 mandatory
₹300
Yes
Executive Engineer RnB Division Ganderbal
Exempted
2 Mar 2021
23 Feb 2021
2 Mar 2021
23 Feb 2021
1 Mar 2021
23 Feb 2021
120 days
Amount
Demolishing of R.C.C work (slab) avg. thickness 300mm by manual/mechanical means incl. stacking of steel bars and disposal of un-servicible material upto required lead complete as per the directions of Engineer Incharge Incl. Dewatering.
Demolishing of stone rubble masanory manually means incld. stacking of serviceable material and disposal of unserviceable material upto required lead complete as per the directions of Engineer Incharge Incl. Dewatering.
Earth work in excavation in all kinds of soil (Muddy soil) by manual or mechanical means in trenches for foundation, etc., up to required width and depth including necessary ramming of bottom and dressing of sides, Close timbering, clearing of vegetation and mulba and disposal of excavated material beyond municipal limits incl.onstruction of Coffer Dam/Ring Bund for diverting of existing water and protecting water seepage during the execution of work till its completion and Removal of the same after the sucessful completion of the work complete. all leads, lifts, carriages and Dewatering complete.
P/L of Dry random rubble stone masonry with hard stones from approved query stones uncoursed brought to course incl. all leads, lifts, cost and carriage of materials complete incl. Dewatering.
P/L of stone soling 75 mm nominal size duly hand packed with ramming, dressing, watering and compacting all inclusive leads, lifts, loading, un-loading, cost and carriage of material involved complete Incl. Dewatering.
P/L, in position cement concrete of specified grade excluding the cost of centering & shuttering. All work up to plinth level in 1:4:8 (1cement: 4 coarse, sand: 8 graded stone aggregate of 40 mm Nominal size (Crushed)all inclusive leads, lifts, loading, un-loading, cost and carriage of material involved complete incl. Dewatering.
P/L, in position Reinforcement cement concrete of specified grade excluding the cost of centering & shuttering. All work up to floor V- level in 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate of 20 mm Nominal size (Crushed) all inclusive leads, lifts, loading, un-loading, cost and carriage of materials from approved nearest sources to site of work complete Incl. Dewatering.
P/L, in position reinforced cement concrete of specified grade upto Floor V-Level excluding the cost of centering & shuttering. in 1:1.5:3 (1cement: 1.5 coarse sand: 3 graded stone aggregate of 20 mm Nominal size Crushed in wing walls, Wheel Gurads ,foundation, Slab, suspended floors, Caps, etc all inclusive leads, lifts, loading, un-loading, cost and carriage of materials from approved nearest sources to site of work complete Incl. Dewatering.
Reinforcement for R.C.C work incld straightening, cutting, bending, placing in position and binding all complete:- (Thermo Mechanically Treated Bars.).
Centering and shuttering incld. strutting ,propping etc. and removal of form work for foundation footings, Abutments, Caps, slab, Wheel Guard, walls ,rafts etc Incl. Dewatering.
Structural steel work welded in built-up sections, framed work in Hallow/Tubular section in raiilling including cutting, hoisting, fixing in position and embedding of angle iron of required section/length in concreating at required spacing incld. applying a priming coat of approved steel primer with Two coats synthetic enamel paint all complete.
Supply and filling of boulders behind Walls incl. Cost of boulders hand packing and Ramming all inclusive leads, lifts, loading, unloading and carriage of material upto site of work complete
M/S BILAL AHMAD BHAT
ROUF AHMAD wani
IMTIYAZ AHMAD GANAYEE
GHULAM JEELANI HAJAM
MOHD SHAFI SHEIKH
M/S JAVAID AHMAD SHIEKH
ZAHOOR AHMAD DAR
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .