Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81.4 LAccepted-AOC PANDA PARA JALPAIGURI | JALPAIGURI | JALPAIGURI | WEST BENGAL | ₹81.4 L | L1 | Accepted-AOC Quoted rate stands lowest |
| 2 | L2₹84.7 L+₹3.3 L (4.05%)Rejected-Finance | ₹84.7 L+₹3.3 L (4.05%) | L2 | Rejected-Finance Rate qouted higher than L1 bidder |
| 3 | L3₹86.1 L+₹4.7 L (5.72%)Rejected-Finance NATUN PARA JALPAIGURI | JALPAIGURI | JALPAIGURI | WEST BENGAL | ₹86.1 L+₹4.7 L (5.72%) | L3 | Rejected-Finance Rate qouted higher than L1 bidder |
| 4 | L4₹86.5 L+₹5.1 L (6.24%)Rejected-Finance | ₹86.5 L+₹5.1 L (6.24%) | L4 | Rejected-Finance Rate qouted higher than L1 bidder |
Tender Value
₹84.8 L
EMD Value
₹1.7 L
Closing Date
26 Mar 2026, 2:00 pmClosed
Executive Engineer and TA to SE/NEIC-II
OFFICE OF THE SE/ NEIC-II, CLUB ROAD, JALPAIGURI
Bank Protection work along the right bank of river Panga adjacent to the Karnamayee R.R.Prathamik vidyalaya for a length of 350 m in Block-Jalpaiguri Sadar P.S.- kotowali District Jalpaiguri.
2026_IWD_1021124_2
WBIW/SE/TUBNEICII/NIT10/2526
Open Tender
CIVIL WORKS
Percentage
90 days
Block-Jalpaiguri Sadar P.S.kotowali Dist Jalpaigur
PLEASE REFER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹1.7 L
Yes
17 Sept 2026
13 Mar 2026
27 Mar 2026
13 Mar 2026
26 Mar 2026
13 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting, uprooting of roots & stumps of trees of different girth up to 1 meter depth below ground level or bed level & filling the root holes by soil and removal of branches, roots & stumps etc. including carriage and stacking as per instruction of the Engineer-in-charge (Measurement of girth at breast height of 90 cm)
(a) Bamboo cluster (each cluster to be measured separately) / Tea bushes. | 3,330 | Sqm | 107.26 | ₹3,57,175.8 |
| 2 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, up to 30 cm. girth including removing as directed by Engineer-in-charge. | 2,975 | Sqm | 5.96 | ₹17,731 |
| 3 | Earthwork in excavation in the canals / drainage channels / borrow pits /River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge.
(a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. | 5,463.14 | Cum | 129.91 | ₹7,09,716.52 |
| 4 | Quarrying, Carrying, Supplying stone boulders from the quarrying site selected by the Engineer-In-Charge to the site of work including cost of materials, loading, unloading and carriage including all incidental charges like royalty and labour charges for laying boulder/ shingles in apron or within wire netting of sausage for slope pitching including carriage up to 30 metre and all lifts & dressing the exposed faces etc. complete as per direction of the Engineer-in-charge.
( Quarry bed belongs to Forest Department, Govt. of W.B).
a) Comprising Boulder above 30 Kg each 60%, above 20 Kg each 30% & above 10 Kg each 10 % for making loose boulder Apron.
N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal.
(a) For Forest area, Royalty including entry fee and TP fee : Rs. 178.33 per Cum
Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works . | 732.86 | Cum | 1,728.82 | ₹12,66,983.03 |
| 5 | Supply of G.I wire netting of different mesh and made with different SWG G I wire at site as per direction of the Engineer-in-charge.
a) Mesh size 150 mm x 150 mm with 10 SWG wire | 1,699.6 | Sqm | 95.34 | ₹1,62,039.86 |
| 6 | Labour charges for constructing sausage crates with 8 Gauge/10 Gauge dia. G.I Wire netting of different shapes and sizes in embankment,apron,slope etc. including with 12 S.W/G , G.I wire and tied at required interval as per direction of the Engineer- in Charge (rate exclude cost of wire net and laying of boulders but includes cost of binding wire
a) Mesh size 150 mm x 150 mm with 10 SWG wire | 326.95 | Cum | 220.62 | ₹72,131.71 |
| 7 | Quarrying, Carrying, Supplying stone boulders from the quarrying site selected by the Engineer-In-Charge to the site of work including cost of materials, loading, unloading and carriage including all incidental charges like royalty and labour charges for laying of boulders in apron or wire netting of sausage for pitching with all leads & lifts and dressing the exposed faces etc. complete as per direction of the Engineer-In-Charge
( Quarry bed belongs to Forest Department, Govt. of W.B).
a) Comprising Boulder above 30 Kg each 60%, above 20 Kg each 30% & above 10 Kg each 10 % for making trapezoidal deflector
N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal.
(b) For Non-Forest area
Royalty : Rs.106.00 per Cum
Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works . | 326.95 | Sqm | 1,728.82 | ₹5,65,237.7 |
| 8 | Quarrying, Carrying, Supplying stone boulders from the quarrying site selected by the Engineer-In-Charge to the site of work including cost of materials, loading, unloading and carriage including all incidental charges like royalty and dressing the exposed faces etc. complete as per direction of the Engineer-In-Charge
( Quarry bed belongs to Forest Department, Govt. of W.B).
a) Comprising Boulder above 30 Kg each 60%, above 20 Kg each 30% & above 10 Kg each 10 % for making Boulder Sausage work
N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal.
(a) For Forest area, Royalty including entry fee and TP fee : Rs. 178.33 per Cum
Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works . | 1,113.69 | Cum | 1,448.74 | ₹16,13,447.25 |
| 9 | Supplying, fitting, fixing end pieces for rectangular / square / circular sausages at the ends, with 10 SWG / 8 SWG G I wire net of different mesh sizes tying & sewing the same maintaining a lap length of 150 mm all around with 12 SWG G I wire complete, including the cost of supply of wire netting, fitting etc., complete as per direction of the Engineer - in - charge.
i) Mesh size 150 mm x 150 mm with 10 SWG wire | 1,166.45 | Sqm | 110.84 | ₹1,29,289.32 |
| 10 | Quarrying, Carrying, Supplying stone boulders from the quarrying site selected by Engineer-In-Charge to the site of work including cost of materials, loading, unloading and carriage including all incidental charges like royalty and labour charges for boulder pitching on top and slope by placing required boulders (each weighing 20 Kg. and above within lead of 100 metres and all lifts) including filling the interstices with fragments as required, preparing sub-grade by cutting or filling the earth on slope up to 7.5 cm. depth, watering and ramming where necessary complete as per direction of the Engineer-in-charge.
( Quarry bed belongs to Forest Department, Govt. of W.B)
c) Boulder above 20 Kg. each for slope pitching work
N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal.
(a) For Forest area, Royalty including entry fee and TP fee : Rs. 178.33 per Cum
Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works . | 396.75 | Cum | 2,011.51 | ₹7,98,066.59 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.10 MB
2911.pdf
Tender Documents • 0.77 MB
karnamoyeeBarChart.pdf
Tender Documents • 0.35 MB
BOQ_2509918.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .