Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 LAccepted-AOC | ₹1.1 L | 1 | Accepted-AOC 1ST LOWEST |
| 2 | 2₹1.1 LRejected-AOC JITPUR NADIA TEHATTA 1 NADIA | NADIA | WEST BENGAL | ₹1.1 L | 2 | Rejected-AOC 2ND LOWEST |
| 3 | 3₹1.1 LRejected-AOC | ₹1.1 L | 3 | Rejected-AOC 3RD LOWEST |
Tender Value
₹1.1 L
EMD Value
₹2,268
Closing Date
1 Jul 2026, 11:00 amClosed
Executive Enginner(A-I), Balurghat(A-I) Division
Uttar Chakbhabani, Balurghat, Dakshin Dinajpur
Construction of Shed near stackyard of Balurghat(A-I) Sub-Division under Balurghat(A-I) Division.
2026_WRDD_1028605_2
WBWRDD/EE AI/BLG/NP/02/2026-27
Open Tender
CIVIL WORKS
Percentage
Balurghat(A-I) Sub-Division
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,268
Yes
31 Jul 2026
22 Jun 2026
3 Jul 2026
22 Jun 2026
1 Jul 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork inexcavationof foundation trenches or drains, inall sorts of soil (includingmixed soil but excluding lateriteor sandstone) including removing, spreading or stacking the spoils within a lead of 75m. as directed.The item includes necessary trimming the sidesof trenches, levelling,dressingandrammingthe bottom, bailing out water as required complete. Depth of excavation not exceeding 1,500 mm. | 3.06 | Cum | 119.27 | ₹364.97 |
| 2 | Filling in foundationorplinthby silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the costof supply of sand. (payment to bemade on measurement of finished quantity) Do - by fine sand | 4.85 | Cum | 711.59 | ₹3,451.21 |
| 3 | SingleBrickFlat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 36.35 | Sqm | 324 | ₹11,777.4 |
| 4 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20mm nominal size)excluding shuttering and reinforcement, ifany, ingroundfloor as per relevant IS codes. Pakur Variety | 2.77 | Cum | 5,601.69 | ₹15,516.68 |
| 5 | Brick work with 1st class bricks in cement mortar (1:6) In foundation and plinth(Below Tie) | 0.27 | Cum | 4,919.88 | ₹1,328.37 |
| 6 | OrdinaryCement concrete (mix1:1.5:3) withgraded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. | 1.61 | Cum | 6,107.32 | ₹9,832.79 |
| 7 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removalof loose rust (if necessary),cutting to requisite length,hookingand bending tocorrect shape, placing in proper position and binding with16 gauge black annealed wire at every intersection, complete as per drawing and direction. For works in foundation and upto roof of ground floor/upto 4 m Tor steel/Mild Steel JSW/JSPL/SHYAM/SRMB/BMASL/ ELECTROSTEEL/SSL | - | M.T | 58,250.5 | - |
| 8 | Hire and labour charges for shuttering with centering and necessary staging upto 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) 25mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. | 10.05 | Sqm | 328 | ₹3,296.4 |
| 9 | Plaster(to wall, floor, ceiling etc.)with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor) With 1:6 cement mortar 15 mm thick plaster | 5.02 | Sqm | 141.48 | ₹710.23 |
| 10 | Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4)with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using [email protected] kg/sq.m all complete including all materials and labour. In ground floor. 3mm. thick topping(High polishing grinding on this item is not permitted with ordinary cement). Using grey cement 25 mm. thick | 32.53 | Sqm | 255.8 | ₹8,321.17 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Tendernotice_2.pdf
PDF • 0.93 MB
BOQ_2526516.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].