Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹2.3 L
Closing Date
2 Jan 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
+ Capital Works)
Above/Below/Par
WA
16 conditions · 3 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees. N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB of Indian Railways Standard General Conditions of Contract, GCC - April 2022, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Similar nature work means Tenderer should have experience on: "Execution of any 1500V DC or 25 kV AC OHE work." (Authority: PCEE- WR/CCG's letter No.EL/90/TRD/W/1 dated 21.01.2009) ( Click here to download Format)
1 condition
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
OHE modification work in connection with extension of existing lines in "C & W yard" at Gandhidham and LC elimination & ROB work in Lakhpat - Gandhidham - Adesar section
TRD-ADI-T-17-2025-26~WR
TRD-ADI-T-17-2025-26
Open
Works - General
12 Months
Ahmadabad, Gujarat
₹0
₹2.3 L
2 Jan 2026
5 Dec 2025
19 Dec 2025
235 items across 5 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 48,44,737.6 | ||
| — | Breakup for | details. | — | ||
| 1.Preparation of all drawing and design for overhead equipment including preparation of SED and OHE layout plan | — | — | — | 21,166 | |
| — | Breakup for | details. | — | ||
| 2.Preparation of SWR diagram board along with caption diagram | — | — | — | 54,200 | |
| — | Breakup for | details. | — | ||
| 3.Supply and erection of fabricated galvanised steel structure and SPS as per specification | — | — | — | 17,96,782 | |
| — | Breakup for | details. | — | ||
| 4.Concrete for foundation and plinth in all type of soil incl. hard/rocky soil (incl. excavation and supply of all material viz. sand, cement, and ballast, etc.) | — | — | — | 4,83,210 | |
| — | Breakup for | details. | — | ||
| 5.Supply & erection of single cantilever assembly complete with insulators for OHE | — | — | — | 5,34,040 | |
| — | Breakup for | details. | — | ||
| 6.Supply & erection of regulating equipment 3 pulley type complete with all accessories including counter weight assembly and SS wire rope | — | — | — | 68,654 | |
| — | Breakup for | details. | — | ||
| 7.Supply and erection of material for termination of double conductor (including supply of 9 ton cut in insulator) of overhead equipment. | — | — | — | 13,865 | |
| — | Breakup for | details. | — | ||
| 8.Supply and erection of material for termination of single conductor (including supply of 9 ton cut in insulator) of overhead equipment. | — | — | — | 16,120 | |
| — | Breakup for | details. | — | ||
| 9.Supply of in-span droppers with dropper clips etc as per explanatory note | — | — | — | 2,26,350 | |
| — | Breakup for | details. | — | ||
| — | Breakup for | details. | — | ||
| — | — | — | 71,766 | ||
| — | Breakup for | details. | — | ||
| 12.Erection of anticreep assembly | — | — | — | 3,006 | |
| — | Breakup for | details. | — | ||
| 13.Supply and erection of 9 tonne cut in insulator | — | — | — | 89,250 | |
| — | Breakup for | details. | — | ||
| 14.Supply and erection of earth electrode. | — | — | — | 29,885 | |
| — | Breakup for | details. | — | ||
| 15.Supply & erection of all type of Galvanized bonds (40 x 6 mm) | — | — | — | 7,08,760 | |
| — | Breakup for | details. | — | ||
| 16.Supply of retro-reflective number plates | — | — | — | 90,740 | |
| — | Breakup for | details. | — | ||
| 17.Eretion of materials for splicing & extension of anchored OHE. | — | — | — | 69,810 | |
| — | Breakup for | details. | — | ||
| 18.Supply of different type of caution boards. | — | — | — | 1,11,500 | |
| — | Breakup for | details. | — | ||
| 19.Transfer of OHE from one mast to another mast and adjustment of droppers | — | — | — | 34,295 | |
| — | Breakup for | details. | — | ||
| — | Breakup for | details. | — | ||
| 21.Dismantling & removal of guy rod assembly. | — | — | — | 2,668 | |
| — | Breakup for | details. | — | ||
| 22.Dismantling & removal of regulating equipment (ATD) | — | — | — | 5,513 | |
| — | Breakup for | details. | — | ||
| 23.Supply of Contact Ending Clamp | — | — | — | 3,250 | |
| — | Breakup for | details. | — | ||
| 24.Supply of Catenary Ending Clamp | — | — | — | 7,320 | |
| 25.Supply of anchor double strap set with rivet, washer and pins as per RDSO drawing no. ETI/OHE/P/5030-MOD 'C' | — | — | — | 3,840 | |
| — | Breakup for | details. | — | ||
| 26.Supply of PG clamps (RI No. 1030-3) | — | — | — | 3,010 | |
| — | Breakup for | details. | — | ||
| 27.Supply of PG clamps small (RI No. 1040-3) | — | — | — | 27,700 | |
| 28.Supply and erection of section insulator assembly including core and cut in insulator. | — | — | — | 1,26,350 | |
| — | Breakup for | details. | — | ||
| 29.Breaking of PCC/foundation | — | — | — | 32,400 | |
| — | Breakup for | details. | — | ||
| 30.Erection of OHE | — | — | — | 43,959.6 | |
| — | Breakup for | details. | — | ||
| 31.Erection under Power block | — | — | — | 1,12,362 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
T-17OHEmodification.pdf
ATTACHMENT
1-GCCwithACS10final.pdf
ATTACHMENT
CorrigendumT-17.pdf
ATTACHMENT
CorrigendumT-17.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .