| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | -9.63% | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹12.1 L (8.06%)Admitted-Finance | -2.35% | ₹1.6 Cr+₹12.1 L (8.06%) | L2 | Admitted-Finance |
| 3 | L3₹1.6 Cr+₹13.3 L (8.89%)Admitted-Finance | -1.60% | ₹1.6 Cr+₹13.3 L (8.89%) | L3 | Admitted-Finance |
| 4 | L4₹1.6 Cr+₹13.8 L (9.22%)Admitted-Finance | -1.30% | ₹1.6 Cr+₹13.8 L (9.22%) | L4 | Admitted-Finance |
Tender Value
₹1.7 Cr
EMD Value
₹3.9 L
Closing Date
7 Jul 2026, 5:00 pmClosed
GENERAL MANAGER (JAL)
Water Works Compound Sector-5 Noida
Strengthening of Sewerage (Construction of Sumpwell in Green Belt, Sector-135) Noida
2026_NOIDA_1165630_1
45/SM(Jal)-I/ET/2026-27
Open Tender
Civil Works - Others
Fixed-rate
365 days
NOIDA
Please Refer to Tender Document
3 documents required · 3 mandatory
₹5,310
NOIDA
₹3.9 L
30 Jul 2026
2 Jul 2026
8 Jul 2026
2 Jul 2026
7 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting road and making good the same i/c supply of extra quantities of materials i.e. aggregate, moorum screening, red bajri and labour required of bituminous portion. | 23.1 | Cum. | 2,613.35 | ₹60,368.39 |
| 2 | Cutting road and making good the same i/c supply of extra quantities of materials i.e. aggregate, moorum screening, red bajri and labour required of water wound macadam. | 120.45 | Cum. | 1,500.55 | ₹1,80,741.25 |
| 3 | Demolishing RCC work manually/by mechanical means i/c stacking of steel bars & disposal of unserviceable material within 50 m lead as per direction of E/I. | 68.4 | Cum. | 1,347.16 | ₹92,145.74 |
| 4 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 33 | Cum. | 923.42 | ₹30,472.86 |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavater) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as we as 10 sqm on plan) including getting out and disposal of exavated earth, lead upto 50 and lift upto 1.5m, as directed by Engineer-in-charge. The contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavating only after getting permission of Engineer-in-Charge. All kinds of soil. | 1,949.44 | Cum. | 136 | ₹2,65,123.84 |
| 6 | Extra for every additional lift of 1.5 or part thereof in excavation / banking excavated or stacked materials. all kind of soil……. | 1 | Cum. | - | - |
| 6.01 | 1.50 to 3.00 m | 508.47 | Cum. | 15.8 | ₹8,033.83 |
| 6.02 | 3.00 - 4.50 m | 355.46 | Cum. | 31.6 | ₹11,232.54 |
| 6.03 | 4.50 - 6.00 m | 229.44 | Cum. | 47.4 | ₹10,875.46 |
| 6.04 | 6.00 - 7.50 m | 130.39 | Cum. | 63.2 | ₹8,240.65 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_2186131.xls
BOQ • 0.33 MB
TD45.pdf
Tender Documents • 2.37 MB
Capability_45.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .