| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC ANNASSERY PO THALAKKALATUR KOZHIKODE 673317 KERALA | KOZHIKODE | KERALA | 673317 | L1 | Accepted-AOC First lowest | |
| 2 | L2₹2.9 L+₹14,963.75 (5.49%)Rejected-AOC | L2 | Rejected-AOC Second lowest | |
| 3 | L3₹2.9 L+₹17,024.71 (6.25%)Rejected-AOC ARUNODAYAM H KAYANNA BAZAR PO 673525 | KOZHIKODE | KERALA | 673525 | L3 | Rejected-AOC Third lowest | |
| 4 | L4₹3.2 L+₹47,982.88 (17.6%)Rejected-AOC KANNADIKKUZHI HOUSE RAMANATTUKARA VAZHAYUR EAST PO | L4 | Rejected-AOC Forth lowest | |
| 5 | L5₹3.2 L+₹49,534.74 (18.2%)Rejected-AOC | L5 | Rejected-AOC Fifth lowest |
Tender Value
₹3.2 L
EMD Value
₹8,049
Closing Date
29 Aug 2024, 6:55 pmClosed
Assistant Executive Engineer
O/o Assistant Executive Engineer KyIP Canal Sub division Vatakara
-KyIP-ACP PLAN-2024-25-Reconstruction of Culvert near Ch.0/500KM in Atholi Sub distributory canal
2024_Irrig_687247_1
IRR/PI/TR/3673/2024_5_5_4/1
Open Tender
Civil Works - Bridges
Item Rate
180 days
Atholi
Please refer Tender documents.
7 documents required · 7 mandatory
₹710
Yes
₹8,049
Yes
3 Apr 2025
22 Aug 2024
31 Aug 2024
22 Aug 2024
29 Aug 2024
22 Aug 2024
22 Aug 2024 - 29 Aug 2024
Amount
canal and culvert
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.9.16.2:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsAbove 20 cm wide
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.12:Providing, hoisting and fixing up to floor level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but excluding cost of reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
OD4184/2024-2025:Supply,stacking,spreading and consolidating of Quarry Muck inside the trench in canal bed, road work etc.. including carriage ,loading , unloading & stacking upto any lead.
RAFTER AND PURLIN LLP
CHANDRAN.C.H
HAREESH KUMAR V K
Rahul p
Bidder Name
HAREESH KUMAR V K
SHAMEJ T
CHANDRAN.C.H
RAFTER AND PURLIN LLP
Rahul p
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1069396.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .