Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹27.7 L+₹6,838 (0.25%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹25.4 L
EMD Value
₹50,000
Closing Date
17 Oct 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXecutive Engineer ,LID EW DIVISION Kottayam
EXecutive Engineer ,LID EW DIVISION Kottayam
LAC-ADS-18791- Vaikom Constituency -Construction of Thumbunkal Bridge in Kalathil Kuttunkal Road Ward-No 2 of Udayanapuram GP-General Civil Work
2024_LSGD_695328_7
05/2024-25/EE/LIDEW/KTM3
Open Tender
Civil Works - Roads
Item Rate
180 days
LID EW DIVISION Kottayam
please refer tender documents
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
12 Mar 2025
9 Oct 2024
18 Oct 2024
9 Oct 2024
17 Oct 2024
9 Oct 2024
Amount
culvert and approach road
2.3.A.1:Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps <br> Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. <br> A. Lead upto 100 m <br> (i) Girth above 300 mm to 600 mm
2.5.2.B:Dismantling of Structures<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.<br> (II) By Mechanical Means <br>(B) Reinforced Cement Concrete
2.7.B:Dismantling Stone Masonry as per Technical Specification Clause 202.<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.<br>(B) Rubble Stone Masonry in Cement Mortar
OD32825/2024-2025:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete.
OD95479/2024-2025:(OD from 60.2.2) Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
OD34117/2024-2025:Coconut Pile - Supplying and stacking well matured straight coconut post for driving down through various strata below bed level including cost of conveyance labour charges etc. complete
OD34116/2024-2025:Coconut Pile - Driving down coconut pile to lines and levels through various strata including all hire charges and labour for fixing, staging platform and all other appliances necessary for pile driving down after pointing the bottom end.
OD62918/2024-2025:Cutting and removing the excess length of wooden piles to lines and levels and removing the cut end of piles and stacking within 150m
OD32826/2024-2025:(60.7.2). DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6
11.4.5:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>V. R.C.C. grade M 25
12.5.4:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 <br> For height upto 5 m <br> IV. R.C.C. grade M 25
13.1.2:Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5<br>R.C.C M 25
12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
OD44564/2024-2025:DRY RUBBLE MASONRY- (OD from 60.7.1) Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site.
OD37790/2024-2025:DRY RUBBLE MASONRY (WITH DEPARTMENT RUBBLE) with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications.
11.4.3.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>III. P.C.C. grade M 20 (i) Nominal mix (1:2:4)
3.4:Construction of Embankment with Material Obtained from Borrow Pits <br> Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
OD33569/2024-2025:Granular sub base/base/ surface course with local materials by mix in place method normal: Construction of Granular sub base by providing well graded material, spreading in uniform layers on prepared surface, mixing by mix in place method and compacting with smooth wheel roller to achieve the desired density complete as per clause 401.4 as per Technical specification clause 408. ii) Soil Gravel mixture/quarry waste
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
OD32828/2024-2025:Provision for providing and fixing granite name board of required size showing details of proposed work as per the direction of Engineer in charge etc. complete
ROJI XAVIER
Bidder Name
Devi Constructions
ROJI XAVIER
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .