Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-Finance | ₹1.8 L | L1 | Accepted-Finance Accepted as being lowest. |
| 2 | L2₹1.8 L+₹2,618 (1.49%)Rejected-Finance | ₹1.8 L+₹2,618 (1.49%) | L2 | Rejected-Finance Not accepted as not being lowest. |
| 3 | L3₹1.8 L+₹3,371 (1.92%)Rejected-Finance | ₹1.8 L+₹3,371 (1.92%) | L3 | Rejected-Finance Not accepted as not being lowest. |
| 4 | L4₹1.9 L+₹12,533 (7.13%)Rejected-Finance | ₹1.9 L+₹12,533 (7.13%) | L4 | Rejected-Finance Not accepted as not being lowest. |
Tender Value
₹1.8 L
EMD Value
₹3,586
Closing Date
31 Aug 2026, 12:00 pmClosed
SUB-DIVISIONAL OFFICER, CALCUTTA CANALS (I) SUB-DI
37/3, CANAL WEST ROAD, KOLKATA-700004
Eviction including dismantling of one Pucca structure and removal of rubbish from the Govt. Plot on right bank of Kestopur Khal in Mouza Krishnapur, Block- Rajarhat, District- North 24 Parganas under Canals Division during the year 2026-2027.
2026_IWD_5019937_1
WBIW/SDO/C.C/CD/e-NIT- 02(e)/2026-27
Open Tender
CIVIL WORKS
Percentage
3 days
Mouza Krishnapur, Block- Rajarhat
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,586
Yes
21 Sept 2026
24 Aug 2026
1 Sept 2026
24 Aug 2026
31 Aug 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for unskilled Labour equipped with one Shovel, one pick basket. | - | Each /Day | 583.98 | - |
| 2 | Hire charges of Poclain Machine - Power 200 including wages of operator & helper.
(a) During Operation of eviction (Including Fuel & Lubricant ) | - | Each/ hour | 9,153.02 | - |
| 3 | Hire charges of Poclain Machine - Power 200 including wages of operator & helper.
(b) During Non Operation Period | - | Each/ hour | 5,452.49 | - |
| 4 | Hire Charges of one Dumper including operation cost , Fuel & Lubricant, wages of operator & helper etc all complete as per site requirement (During Operation ). | - | Each/ hour | 2,621.96 | - |
| 5 | Hire Charges of RCC Cutter machine including cost of operator & generator. | - | Each /Day | 4,266.64 | - |
| 6 | Hire Charges of 1 (one) no. Mike set with announcer including small vehicle like Toto/Rickshaw. | - | Each /Day | 5,363.1 | - |
| 7 | Supply & fixing of wooden peg/pegs (Size 5’0” height X 0’2” X 0'2.5”) including supplying and fixing of danger tape on the wooden peg complete as per direction of EIC. | - | Each | 238.36 | - |
| 8 | Still and video photography including supply of soft copy of still and video photography and supply of 3 set of still photograph. | - | Each | 1,191.8 | - |
| 9 | Supply & fixing Signboard comprising size 4’ X 3’ flex on the land. | - | LS | 810.42 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
Tendernotice_2.pdf
PDF • 0.39 MB
Tendernotice_3.pdf
PDF • 0.11 MB
BOQ_5093563.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .