| 1 | L1₹3.1 LAdmitted-Finance | ₹3.1 L | L1 | Admitted-Finance |
| 2 | L2₹4.9 LAdmitted-Finance | ₹4.9 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M.K. ENTERPRISES L2 | Ms Jhandel Singh Sisodia L1 |
|---|---|---|---|---|---|
| 1.00 | Maintenance of LED street light Fixture (90 to 120 Watt) in industrial area Gundi Fatehpur including supply and replacing the required material and labour etc. complete as per the following terms and conditions:- i At any moment a minimum of 90% of total fixture must be in order. The defective fixture must be repaired within 3 days, falling Which deduction for number of light which are not functioning in the industrial area shall be made at one time of the rate (accordingly deduction for lights which are not functioning becomes two times of the rates from total payment due for total number of lights whose operation and maintenance was awarded to the contractor ). ii Contractor shall arrange at his cost for put on & off the street light fixture at appropriate time regularly as per instructions of Engineer-In charge. A register shall be maintained at RIICO/association office and complaint lodged must be attended by contractor within 24 hours. The person deputed by contractor shall attend the RIICO/Association office daily and comply the instructions and attend complaints regularly. iii Contractor will have to employ trained and qualified electricians for the work. iv Corporation shall not be responsible for any kind of accident during execution of work. v Contractor will be responsible for safety and security of fixtures and all concerned materials. vi Contractor will be responsible for arrangement of all T&P required for the work vii Cost of all labour and material like will be born by contractor. All material required for the work shall not be below the category-II of concerned BSR item. Contractor has to repair and maintenance fixture with material in all cases like short circuit, phase to phase of JVVNL line etc. viii No extra payment will be made for fixing/removal of extra/existing fixture in the industrial area. ix. If any cable or fixtures are completely damaged due to any other reason and are not serviceable, RIICO shall re-install them at their own level after verification. x. Contractor will be responsible for timely collection and deposition of electric bills of areas in each month. In case of delay in payment and JVVNL impose surcharge for delay payment the same will be recovered from the running bill fo the contractor. Payment of electricity bill will be made by RIICO. xi Contractor will be responsible for rebate of Timer provided by JVVNL. Hence contractor will maintain the On/Off system by timer properly. In case no rebate is provided by JVVNL due to failure of timer then rebate will be deducted from contractor payment. xii Contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this. In case of any theft is found suitable penalty will be imposed on the contractor. xiii Contractor will maintain cubical panel board and accessories fitted in it. In case of any fault repair/replace of material will be done by the contractor at his own cost. No extra payment will be made on behalf of material. xiv Contractor has to keep ready total fixtures. In case of fault of fixture a penalty of Rs.100/- per fixture per day will be imposed on the contractor. | 4,944 | Per Point Per Month | 100 ₹4.9 L | 62.9 ₹3.1 L |
Tender Value
₹4.2 L
EMD Value
₹8,405
Closing Date
18 Mar 2026, 6:00 pmClosed
Unit Head RIICO Kota
RIICO Office, Road NO. 5, IPIA near Gobaria Babri Kota
As per boq
2026_RIICO_545441_1
68/2025-26(1)/4876-81
Open Tender
Electrical and Maintenance Works
730 days
Gundi Fatehpur industrial area
as per TD
3 documents required · 3 mandatory
₹590
RIICO head office payment gateway
₹8,405
7 Apr 2026
12 Mar 2026
19 Mar 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
Maintenance of LED street light Fixture (90 to 120 Watt) in industrial area Gundi Fatehpur including supply and replacing the required material and labour etc. complete as per the following terms and conditions:- i At any moment a minimum of 90% of total fixture must be in order. The defective fixture must be repaired within 3 days, falling Which deduction for number of light which are not functioning in the industrial area shall be made at one time of the rate (accordingly deduction for lights which are not functioning becomes two times of the rates from total payment due for total number of lights whose operation and maintenance was awarded to the contractor ). ii Contractor shall arrange at his cost for put on & off the street light fixture at appropriate time regularly as per instructions of Engineer-In charge. A register shall be maintained at RIICO/association office and complaint lodged must be attended by contractor within 24 hours. The person deputed by contractor shall attend the RIICO/Association office daily and comply the instructions and attend complaints regularly. iii Contractor will have to employ trained and qualified electricians for the work. iv Corporation shall not be responsible for any kind of accident during execution of work. v Contractor will be responsible for safety and security of fixtures and all concerned materials. vi Contractor will be responsible for arrangement of all T&P required for the work vii Cost of all labour and material like will be born by contractor. All material required for the work shall not be below the category-II of concerned BSR item. Contractor has to repair and maintenance fixture with material in all cases like short circuit, phase to phase of JVVNL line etc. viii No extra payment will be made for fixing/removal of extra/existing fixture in the industrial area. ix. If any cable or fixtures are completely damaged due to any other reason and are not serviceable, RIICO shall re-install them at their own level after verification. x. Contractor will be responsible for timely collection and deposition of electric bills of areas in each month. In case of delay in payment and JVVNL impose surcharge for delay payment the same will be recovered from the running bill fo the contractor. Payment of electricity bill will be made by RIICO. xi Contractor will be responsible for rebate of Timer provided by JVVNL. Hence contractor will maintain the On/Off system by timer properly. In case no rebate is provided by JVVNL due to failure of timer then rebate will be deducted from contractor payment. xii Contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this. In case of any theft is found suitable penalty will be imposed on the contractor. xiii Contractor will maintain cubical panel board and accessories fitted in it. In case of any fault repair/replace of material will be done by the contractor at his own cost. No extra payment will be made on behalf of material. xiv Contractor has to keep ready total fixtures. In case of fault of fixture a penalty of Rs.100/- per fixture per day will be imposed on the contractor.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
TD68streetlight.pdf
Tender Documents • 0.18 MB
BOQ_972792.xls
BOQ • 0.39 MB
Paymentassociation.pdf
Other Document • 0.68 MB
Download all tender documents and submit your bid