| 1 | ₹5.3 Cr 2 YOUR TENDER SUBMITTED ON 13 02 2026 ON E TENDER WEBSITE 3 YOUR PRICE BID OPENED ON 16 02 2026 ON E TENDER WEBSITE SIR AL THIS IS TO NOTIFY YOU THAT YOUR TENDER FOR THE WORK UNDER REFERENCE HAS BEEN ACCEPTED WE | ₹5.3 Cr |
Tender Value
₹5.9 Cr
EMD Value
₹5.9 L
Closing Date
13 Feb 2026, 11:00 amClosed
Desilting of lagoon and repair/replacement of Lagoon Gate at RSPL, SAIL, Rourkela in Sundargarh District of Odisha
NBCC/SBG/ODISHA/NIT/25-26/59
NBCC/SBG/ODISHA/NIT/25-26/59
Open Tender-Domestic
Civil Works - Others
Sundargarh, Odisha
₹11,800
₹5.9 L
21 Jul 2026
30 Jan 2026
13 Feb 2026
13 Feb 2026
16 Feb 2026
ABSTRACT OF COST
Description on item SCHEDULE +
No. SCHEDULE NON SCHEDULE
Cost of Desilting of lagoon and
Repair / Replacement of Lagoon
Digitally signed by JAYA
Name of the Work: - Desilting of lagoon and Repair / Replacement of Lagoon Gate at RSPL, SAIL, Rourkela in Sundargarh District of
DSR/ NON Rate (Rs.) Amount (Rs.)
Sl. No. SCHEDULED Description of Items Unit Quantity NON NON
SCHEDULED SCHEDULED
RATE(NSR) SCHEDULED SCHEDULED
Providing temporary retaining structure sheet pile including
transporting, driving and retrieving with appropriate
thickness, shape & depth at desire loaction for creating a
NS temporary, watertight enclosure for underwater work to hold
back soil and water during replacing the sluice gate and
structure will retain till completion of the entire replacement
of sluice gate work complete in all respect as per direction
of engineer in charge
Near sluice gate work sqm 175.00 13880.00 24,29,000.00
2 Desilting by Dredging from river /nallah/ Pond for depths
varying from 1.00m to 3.00 m including fixing of pipelines ,
Floaters and floating pipelines for disposing of water slurry
consisting of all kinds of soil including medium fine sand &
coarse sand with gravelly earth and deposited far away from
the work site within 2km. The rate shall include the cost of
NS labour , materials , consumables POL, spare parts and
accessories to keep dredger , T&P etc. including building in
the island by providing geo tubes and accessories or by tin
sheets for information of bund for dumping of dredged
material with all lead and lift including GST as per direction
of the Engineer-in-Charge .
NS From Existing Water Body of 125000 Sqm Area Cum 127500.00 387.99 4,94,68,725.00
3 Dismantling and removing MS sections such as plate,
doors, windows, ventilators and etc. including removal of
frame, hinges, fastening and stacking the same for reuse
and removing the debris within 50m lead including all cost of
labour,material,mechineries, loading & unloading,
conveyance & T&P etc. Complete as per the direction of
Engineer-In-Charge.
NS Exsting Sluice Gate Sqm 90.00 1161.00 1,04,490.00
4 Supplying, fitting & fixing in all floors of M.S. grills, grill
gates, M.S. gates, garage door, collapsible gates with top
and bottom rails, steel windows, critical frames for windows,
stair case and parapet railing made out of M.S Square bar/
flat including stair case hand railing with 40mm. dia G.I.pipe
NS etc. including painting two coats over a coat of redoxide
primer as per approved drawing and design with cost of all
materials & labour, labour cess, T&P, sundries etc.
complete in all respect as per specification & direction of the
Engineer-in-Charge.
5 Design, Drawing ,Construction , Commissioning &Testing of
MS Intake well (upto desired Depth) including dewatering ,
cofferdam, suitable height pump house on the well, EOT
crane ) sufficient wide walk way (as per requirement to
NS intake pump house including external electrification ,raw
water pump ,approach to site ,spur and cutoff wall etc.
complete in all respect as per direction of Engineer in
charge (upto 25 m length) Sqm 180.00 1600.00 2,88,000.00
6 DSR-13.85.3 Applying priming coats with primer of approved brand and
manufacture, having low VOC (Volatile Organic Compound )
With water thinnable cement primer on wall surface having
VOC content less than 50 grams/litre
Exisitng RCC Surface Sqm 300.00 73.95 22,185.00
7 DSR-13.44.1 Finishing walls with water proofing cement paint of required
New work (Two or more coats applied @ 3.84 kg/10 sqm)
Exisitng RCC Surface Sqm 300.00 116.90 35,070.00
Digitally signed by JAYA
8 DSR-13.80) Providing and applying white cement based putty of
average thickness 1 mm, of approved brand and
manufacturer, over the plastered wall surface to prepare the
surface even and smooth complete.
Exisitng RCC Surface Sqm 300.00 156.05 46,815.00
10 NS Clearing and removal of vegetation,grass,bushes, etc.
and disposal of unserviceable materials and stacking of
unserviceable materials to be used or auctioned , up to
a lead of 1000 metres including removal and complete
as specification and direction of the Engineer-in-
charge. The exiting waterbody having 2,12,096 Sqm
area. vegetation removal will be for an area of 80,057.94
Carryingout pre & post hydrographic survey in exiting
Lagoon area as per guidelines of IS-Code/ CWC
guidelines etc complete as per direction of EIC acre 53.00 23600.00 12,50,800.00
Digitally signed by JAYA
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT01.pdf
Tender Document
GCC WITH AMENDMENT-16.pdf
Tender Document
SCC.pdf
Tender Document
INTEGRITY PACT.pdf
Tender Document
BOQ Lagoon.pdf
Tender Document
Technical Specification.pdf
Tender Document
APPROVED MAKES.pdf
Tender Document
Technical Circular_31.pdf
Tender Document
Milestone.pdf
Tender Document
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .