| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.4 LAdmitted-Finance | +4.00% | ₹9.4 L | L1 | Admitted-Finance |
| 2 | L2₹9.4 L+₹4,498.66 (0.48%)Admitted-Finance CHOKHNA TEHSIL GHUMARWIN DISTT BILASPUR HP | +4.50% | ₹9.4 L+₹4,498.66 (0.48%) | L2 | Admitted-Finance |
Tender Value
₹9.0 L
EMD Value
₹18,000
Closing Date
4 Aug 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
O/O EE HPPWD DIVISION GHUMARWIN
Construction of link road Dangar Malehri Bhadsi road km 0/00 to 2/500 SH Construction of Embankment , Stone Soling Cement concrete work in 1.1.5.3 km 2/100 to 2/210 and C/o P.C.C. R/wall AND B/wall at various RD Under MMSY
2026_PWD_140116_11
4249-55 DT.25/07/2026
Open Tender
Civil Works
Percentage
30 days
GHUMARWIN
AS PER SBD
11 documents required · 11 mandatory
₹350
₹18,000
Yes
27 Aug 2026
28 Jul 2026
5 Aug 2026
28 Jul 2026
4 Aug 2026
28 Jul 2026
28 Jul 2026 - 4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m (one point five meter), transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per drawings and MORD technical specification 2014 Clause 301.5.The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 66.15 | Per cubic metre | 275 | ₹18,191.25 |
| - | Stone soling properly hand-packed filling interstices with Kharanja stone and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification. 150 mm (One Hundred fifty millimetre)spread thickness (finished work including materials and labour)as per direction of Engineer-In-Charge including carriage of material with in all leads and lifts and other incidentals as directed by the Engineer-In-Charge. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 53.89 | Per cubic metre | 1,550 | ₹83,529.5 |
| - | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level. 1:1.5 :3(One cement is to one point five coarse sand is to three graded crushed stone aggregate 20 mm (twenty milimetre) nominal sizeas per direction of Engineer-In-Charge including carriage of material with in all leads and lifts and other incidentals as directed by the Engineer-In-Charge. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 44.91 | Per cubic metre | 7,100 | ₹3,18,861 |
| - | Earthwork in excavation for structures as per drawing and technical specifications Clause 304 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material .The rate includes, octroi, Malkana , Toll tax , Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 62.19 | Per Cubic metre | 250 | ₹15,547.5 |
| - | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level :1:4:8 (One Cement is to four coarse sand is to eight crushed graded stone aggregate) 40 mm (forty millimetre) nominal size as per direction of Engineer-In-Charge with in all leads and lifts and other incidentals. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 53.86 | Per cubic metre | 5,000 | ₹2,69,300 |
| - | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, all lead and lift up to in All kinds of soil with in all leads and lifts and other incidentals. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 342.15 | Per square metre | 20 | ₹6,843 |
| - | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm (one hundered milimeter ) dia PVC pipe of working pressure not less than 4kg/sqcm ( four kilogram per square centimeter) extending through the full width of the structures with slope of 1(V) (one vertical) :20(H) ( twenty horizontal) towards drawing face complete as per drawings and MORD technical specification 2014 Clauses 614, 709, 1204.3.7 . The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 25 | Each | 325 | ₹8,125 |
| - | Providing and laying cement concrete for plain / reinforced concrete in open foundation completeas per drawing and technical specifications clause 802,803, 1202&1203 PCC grade M-10 (Nominal Mix 1:3:6) (one :three:six)and curing complete as per drawing.The rate is including octroi, royality, Malkana, toll tax, GST building and other construction worker, welfare cess, royality or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsover in this respect of the same . | 18.9 | Per cubic metre | 5,400 | ₹1,02,060 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete work including cost of binding wire upto all floor level TMT of grade Fe-500D or more steel bars including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals. The rate includes, octroi, Malkana , Toll tax , Goods Service Tax, building and other construction work, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 525 | Per Kilogramme | 90 | ₹47,250 |
| - | Back filling behind abutment , wing walls return wall complete as per drawings and technical specification clause 1204.3.8 as per direction of Engineer-In-Charge with in all leads and lifts and other incidentals. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 1.65 | Per cubic metre | 1,650 | ₹2,722.5 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
sbd11.pdf
Tender Documents • 4.89 MB
BOQ_207764.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .