| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹404.43Accepted-AOC BARECHHINA ALMORA | ALMORA | UTTARAKHAND | 244715 | ₹404.43 Quoted ₹4.0 Cr | L1 | Accepted-AOC Bid is responsive |
| 2 | L2₹4.1 Cr+₹5.3 L (1.31%)Rejected-Finance | ₹4.1 Cr+₹5.3 L (1.31%) | L2 | Rejected-Finance BID IS NON RESPONSIVE |
| 3 | Rejected-Technical VILL P O HUPLI NACHNI TEHSIL MUNSYARI PITHORAGARH UTTARAKHAND | - | - | Rejected-Technical BID IS NON RESPONSIVE |
| 4 | Rejected-Technical | - | - | Rejected-Technical BID IS NON RESPONSIVE |
| 5 | Rejected-Technical | - | - | Rejected-Technical BID IS NON RESPONSIVE |
Tender Value
₹4.1 Cr
EMD Value
₹8.2 L
Closing Date
28 Jul 2021, 1:00 pmClosed
CE URRDA Dehradun
1st floor Directorate of Panchayati raj opposite IT Park Shastradhara Road Dehradun
Construction and Maintenance of Basolikhan - Chamtola to Nayal Dhura MR Stage-II with 5 Year Maintenance under PBMC
2021_CCUK_111544_1
UT0108
National Competitive Bid
Civil Works - Roads
Item Rate
240 days
Almora
Please refer Technical bid
3 documents required · 3 mandatory
₹5,900
₹8.2 L
PMGSY Circle Almora
6 Oct 2021
2 Jul 2021
28 Jul 2021
2 Jul 2021
28 Jul 2021
7 Jul 2021
7 Jul 2021
Amount
Protection Work
Earthwork in excavation for structures as per drawing and technical specifications Clause305.1 including settingout, construction of shoring and bracing, removal of stumps andother deleterious material and disposal up to a lead of 50m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
For R/W and B/W
Construction of R. R . stone masonary laid dry including supply of all materials, labour,t&p&royaltyetc,required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clause 700 &1604.
For R/W and B/W
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 {Random rubble masonry In cement mortar (1:5)}
For R/W and B/W
HP stone filling in back of walls including supply of all material, labour, T&P etc. required for proper completion of the work.
For R/W and B/W
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS: 4826 in 100 mm x 100 mm mesh (woven diagonally) including 10% extra for laps and joints laid with stone boulders weighting not less than 25 Kg each as per drawing and technical specification of MORD and as directed by Engineer-in-charge(3.00x1.50x1.25).
Providing and fixing of C.C. edge stone 12cm X 12cmX 60cm Size in M-15 Cement Concrete With 4 nos. 8mm dia HYSD vertcal bars and 3 nos. 6mm dia MS bar Strrups as per approved Drawing including 2 coat White washing on valley side of formation as directed
Construction of Parapet
Earthwork in excavation for structures Earthwork in excavation for structures as per drawing and technical specifications Clause305.1 including settingout, construction of shoring and bracing, removal of stumps andother deleterious material and disposal up to a lead of 50m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing and laying of concrete for plain concrete in open foundations for structures including supply of all materials, labour, T&P, royalty etc. required for proper completion of work as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014. P.C.C grade M 10.
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 {Random rubble masonry In cement mortar (1:5)}
15 mm thick Plastering with 1:4 cement mortar including supply of all materials, labour,T&P, royalty etc.required for proper completion of work as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.
Pointing with cement mortar (1:3) on brickwork in parapet as per technical specifications Clauses 613.3 and 1208.4
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 Nominal mix (1:2:4)
White washing of parapet walls of CD work and tree truncks White washing two coats on parapet walls and tree trunks including preparation ofsurface by cleaning scraping etc. as per technical specifications Clause 1915
SIDE DRAIN
Cleaning of Drains Maintenance of Drains The maintenance of drains include erosion,repair, clearing, cleaning, reshaping,regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1907.
Construction of Hill side K C Pucca drain in accordance with the requirement of specification true to line and grades. Dimensions and other particulars as per drawing including all material labour T&P. etc. required for proper completion of the work as directed by Engineer in charge.
Earthwork in excavation for structures Earthwork in excavation for structures as per drawing and technical specifications Clause305.1 including settingout, construction of shoring and bracing, removal of stumps andother deleterious material and disposal up to a lead of 50m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 {Random rubble masonry In cement mortar (1:5)}
15 mm thick Plastering with 1:4 cement mortar including supply of all materials, labour,T&P, royalty etc.required for proper completion of work as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.
EARTHAN SHOULDERS SUPER ELEVALATION.
Repairs of damages caused by rain/spillage of water Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1 (Sub grade preparation)
Excavation in Cutting in Soil by manual means with lead upto 50 m.Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3(for making superelevation)
Construction of Embankment with material obtained from Roadway Cutting/with approved materials deposited at site from roadway as directed by Engineer-in-charge and MORD specifications for Rural Roads 2014 (Filling/Patri Filling)
Coolie walling including supply of all material, labour, T&P , royalty etc. required for proper completion of the work , as directed by Engineer-in-charge and as per PWD specifications 8.90
PAVEMENT WORK
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (Using naturally occuring gravel)
WBM Grading 2Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. By Mechanical Means
WBM Grading 3Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means
BITUMINOUS WORKS
Prime CoatLow porosity :- Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70- 1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (Emulsion used for cold mix)
Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.(Emulsion used for cold mix shall be supplied from authorized of IPR's owner i.e CRRI , New Delhi)
Providing laying and rolling of cold mixed open -graded primix carpet of 20 mm thickness composed of 13.2 mm to 5.6mm agregates using penetration grade Catonic Bitumen Emulsion (Tailor mace binder ) to required line , grade and level to serve as wearing course on previously prepared base ,including mixing in a suitable plant, lying and rolling with a three wheel 80-100 KN static roller capacity , finished to required level and grades to be followed by seal coat of either Type B as per MORD specification Clause 506.2 (Emulsion used for cold mix shall be supplied from authorized of IPR's owner i.e CRRI , New Delhi)
Providing and Laying seal coat by Bituninous Emulsion (tailor made binder) as binder for sealing the voids in a bituminous surface laid to the specified levels grade and cross fall using Type B as per Technical Specification Clause 508(Emulsion used for cold mix shall be supplied from authorized supplier of IPR's owner i.e. CRRI ,New Delhi)
Road Furniture
Providing fixing of Title Information Board with PMGSY Logo at suitable place in the starting of the road as per standard drawing duly painted and written as directed by Engineer in charge/ as per MORD Specification for Rural Roads 2014.
Providing & fixing of Citizen Information Board with PMGSY Logo at starting or prominent location (where maximum no. of citizens can view the detail of the road) as per standard drawing dully painted and written as directed by Engineer in charge/ as per MORD Specification for Rural Roads 2014.
Providing fixing of Maintenance Information Board with PMGSY Logo at starting or prominent location (Where maximum no.of citizens can view the detail of the road) as per standard drawing duly painted and written as directed by Engineer in charge/as per IRC/MORD Specification for Rural Road 2014.
Semi-Reflective Traffic signs Direction and place identification signs up to 0.9 sqm size board Providing and erecting direction and place identifications of semi reflective sign boards as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. Supported and welded on 47 mm x 47mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701
Maintainance Activities:
Slip ClearanceClearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side complete as directed by the Engineer-in-charge.
Ist year (2/9X80X2.00X2.00X7.500)
IInd year (2/9X60X2.00X2.00X7.500)
IIIrd year (2/9X40X2.00X2.00X7.500)
IVth year (2/9X20X2.00X2.00X7.500)
Vth year (2/9X20X2.00X2.00X7.500)
Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1907.(Twice in a year)
Ist year
IInd year
III rd year
IV th year
V th year
Ist year
IInd year
III rd year
IV th year
V th year
Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908.Twice in a year
Ist year
IInd year
III rd year
IV th year
V th year
Maintenance of Road Signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910
III rd year
V th year
Maintenance of 200 metre and km stones Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing ]and technical specification Clause 1912
III rd year
V th year
Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914.
Ist year
IInd year
III rd year
IV th year
V th year
White washing of parapet walls of CD work and tree truncks. White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915
Edge Stone (2150+3000) = 5150.00 nos @0.30sqm/ no = 1545.00 Sqm
Ist year
IInd year
III rd year
IV th year
V th year
Parapet (1448+102)=1550 nos @2.94sqm/ no = 4557.00 Sqm
Ist year
IInd year
III rd year
IV th year
V th year
Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type Bspecification Clause 1904.2.
IIIrd year (2% of P.C. Work 23928.58 Sqm = 478.57 Sqm)
Vth year (3% of P.C. Work 23928.58 Sqm = 717.86 Sqm)
Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per technical specificationClause 1906.
IIIrd year (1% of P.C. Work 23928.58 Sqm = 239.58 Sqm)
Vth year (2% of P.C. Work 23928.58 Sqm = 478.57 Sqm)
PBMC Maintenance
Deploying Hydraulic Excavators of 0.90 cum Bucket for clearance of major slip in all type of Soil, Rock and Boulders including its Operator, Fuel, all other charge and taxes required for proper completion of work.
Ist year
IInd year
III rd year
IV th year
V th year
Major Slip clearance in all type of Soil, Rock and Boulders including cast of all material , Machine, T&P and Taxes etc required for proper completion of work as per MoRD specifications, Clause 1611
Isyear (2/9X40X2.50X2.25X7.500)
IIndyear (2/9X30X2.50X2.25X7.500)
IIIrdyear (2/9X20X2.50X2.25X7.500)
IVthyear (2/9X10X2.50X2.25X7.500)
Vthyear (2/9X5X2.50X2.25X7.500)
Coolie walling i/c supply of all material, labour, T&P, royalty etc. required for proper completion of the work, as directed by Engg-in-charge & as per PWD specifications 8.90 (For Opening Communication Only)
Ist year (25.00X0.45X0.45x7.50)
IInd year (20.00X0.45X0.45x7.50)
IIIrd year (15.00X0.45X0.45x7.50)
IVth year (10.00X0.45X0.45x7.50)
Vth year(5.00x0.45X0.45x7.50)
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (woven diagonally)including 10% extra for laps and joints laid with stone boulders weighing not less than 25 kg each As per drawing and technical Specifications clause 1301
Istyear (1X3.0X1.50X1.25x7.50)
IIndyear (1X3.0X1.50X1.25x7.50)
IIIrdyear (1X1/2X3.0X1.50X1.25x7.50)
IVthyear (1X1/2X3.0X1.50X1.25x7.50)
Vthyear (1X1/2X3.0X1.50X1.25*7.50)
mohan construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .