Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.0 LAccepted-AOC 81 SAHAPUR MAIN ROAD PS BEHALA KOLKATA WB PIN 700038 | KOLKATA | WEST BENGAL | 700038 | L1 | Accepted-AOC Being lowest and reasonable | |
| 2 | L2₹51.3 L+₹26,875.31 (0.53%)Rejected-Finance 12 SHAH INDUSTRIAL ESTATE DEONAR VILLAGE ROAD DEONAR MUMBAI MAHARASHTRA 400088 | MUMBAI SUBURBAN | MAHARASHTRA | 400088 | L2 | Rejected-Finance Being not lowest | |
| 3 | NB₹50.1 LRejected-Finance | NB | Rejected-Finance Declared non bonafide due to overall quoted amount is less than minimum wages including statuary provision as mentioned in Sch A notes of tender document | |
| 4 | Rejected-Technical 42 43A VIDYA SAGAR SARANI PALLY BARISHA KOLKATA 700 008 | KOLKATA | WEST BENGAL | 700008 | - | Rejected-Technical As mention in Technical Evaluation Report |
Tender Value
₹60.4 L
EMD Value
₹1.2 L
Closing Date
14 Jan 2020, 6:00 pmClosed
CWE KOLKATA
Commander Works Engineers, MES, National Library Avenue, Alipore, Kolkata 700 027
OUTSOURCING SERVICES FOR OPERATION OF VARIOUS WATER PUMP HOUSE INSTALLATIONS AT OUTSIDE FORT WILLIAM UNDER GE(FW) KOLKATA
2019_MES_308246_1
8037/E8(E40)19-20
Open Tender
Miscellaneous Services
Item Rate
334 days
KOLKATA-27
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
GE FORTWILLAM KOLKATA
₹1.2 L
Yes
13 Feb 2020
20 Dec 2019
15 Jan 2020
20 Dec 2019
14 Jan 2020
2 Jan 2020
20 Dec 2019 - 27 Dec 2019
Amount
NOTE NOS :-1. The bidders/contractors are advised to read tender document & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates. 2. It is highlighted that the cretin condition of General Condition Of Contracts (IAFW-2249) has been modified as direction of MOD i.e inclusion of performance security, deletion of risk & cost provisions and increase in defects liability period all as specified in tender document.
Outsourcing of 08 hrs Fitter General Mechanic(Skilled) operation of various type Pump, DG Set, water treatment, equipment/machinery etc per day per month including reliever on Sundays & holidays for day to day operation of group of following E/M installations in various pump house at inside FW as per direction of Engg-in-Charge’s/GE and daily maintenance including cleaning entire installation area and daily maintenance of necessary records & documents all as specified here-in-after:- Qty- 01 no FGM x 03 shifts x01 Nos Location(Pump House / DG Set) x11 Month = 33 Each calendar month per 08 hours service.
Outsourcing of 08 hrs Mate Fitter General Mechanic(Semi Skilled) operation of various type Pump, DG Set, water treatment, equipment/machinery etc per day per month including reliever on Sundays & holidays for day to day operation of group of following E/M installations in various pump house at at inside FW as per direction of Engg-in-Charge’s/GE and daily maintenance including cleaning entire installation area and daily maintenance of necessary records & documents all as specified here-in-after:- Qty- 01 no FGM Mate x (03 shifts x 4Nos Location(Pump House / DG Set+ 0 shifts x 01 No Location(Pump House / DG Set) )x11 Month =14x11 Each calendar month per 08 hours service.
Note for item no 2 to 3: (i) Unit rate shall be quoted one Fitter General Mechanic)/Mate Fitter General Mechanic /electrician per 08 hour service per Day for one month (ii) DUTY TIME :- A normal working 08 hour shift as mentioned in PS. However, GE/Engg-in-Charge at his discretion may change the shift timings as per requirements and 1 shift or 2 shift installation may be late-night hours. The shift of 08 hours shall however be continuous. The quoted rate shall be deemed to take into account such situations. (iii) Contractor shall be provide T & P such as (Pipe wrench, pliers, line tester, test lamp, clamp meter) two set of uniforms to every operator, one No first aid box, cotton waste, wipping cloths to each installation under contract schedule, required log sheets of pumping sets and DG sets of all installations and sweeping instruments and the cost thereof deemed to be included in above quoted rate. (iv) Wherever operation of pump (water supply / fire fighting / sewage) is mentioned, the same is inclusive of greasing, cleaning, adjustment, minor repairs of nuts, bolts, washers etc with other related equipments of the pump house / installations alongwith operation of valves including cleaning of inside and outside areas of the respective pump houses, replacement of gland packing, maintenance of suction and delivery pipe lines, primary fill up of OH tanks and general cleanliness of surrounding area complete all as specified and directed and the cost thereof deemed to be included in the quoted rate. (v) Wherever operation of DG Set is mentioned, the same is inclusive of operating the AMF / control panel including checking of battery, lub oil, fuel level, coolant etc and general cleanliness of the DG Set and surrounding area and reporting of fault immediately and switching on street lights as per time schedule where applicable all as specified and directed and the cost thereof deemed to be included in the above quoted rate. (vi) The quoted rate of above items shall be deemed to be included payment of wages, mode of payment, EPF and ESI payment to Fitter General Mechanic)/Mate Fitter General Mechanic /electrician as applicable as per Sch "A" note & PS. Accordingly bidder should quoting their offer. (vii) Electrician/ Mate Electrician will take all preventive measures as per code of practise of EI Rules as well as they should be insured for accident as per labour laws. The Department will not be responsible for any type of incident. (viii)The operator should have own conveyance and communication system like mobile etc (ix) The term & condition as specified in Sch 'A' Note & PS of tender document. Accordingly bidder should quoting their offer. Location:-(i) FGM: (A) Installation No -1 :- (New RRC Pump House ,P-1 Pump House ,Sewage Pump,KMC Pump House & Ladies Golf at outside FW) (03 shifts) (ii) FGM Mate:-(a) Installation No - 1 :- Pump House for MAP Officers Accn (03 shifts), (b) Installation No - 2 :- Pump House for MAP ORs ACCN (03 shifts) (03 shifts),(c) Installation No - 3 :- Swimming Pool Pump House & Golf Pump House (03 shifts),(d) Installation No - 4 :- Lakh Gallon Pump House,Engr Det,RD Parade Ground (03 shifts),(e) Installation No - 5:- Sewage Pump House at George Gate (02 shifts)
BKGL CONSTRUCTION
AIRCON SYSTEMS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .