Tender Value
₹4.2 Cr
EMD Value
₹6.3 L
Closing Date
16 Sept 2026, 4:00 pm7d left
Public Works Department
Shivashanker Kamshetty
Improvements to Road from Ghodampalli to Nagoora Cross Via Sadughat MDR Road Km. 4.00 to 6.00 in Bidar Taluka. (Working Reach Km. 3.758 to 6.00) UNDER 5054 APPENDIX-E
PWD/2026-27/RD/WORK_INDENT35949
PWD/2026-27/RD/WORK_INDENT35949
Open
Roads
Two Tender Document System(Two Cover)
PWD Division Office Bidar
6 documents required · 6 mandatory
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2021-22, 2022-23, 2023-24 2024-25 & 2025-26 (a) achieved in at least two financial years a minimum financial turn over (in all cases of civil engineering construction works only) Rs. 836.25 Lakhs Turnover certificate must have UDI number , otherwise it will not be considered for further bid evaluation.
To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2021-22, 2022-23, 2023-24 2024-25 & 2025-26 (b) satisfactorily completed as prime contractor, at least one similar work such as Improvements to BT road such as of value not less than Rs. 209.07 Lakhs
To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2021-22, 2022-23, 2023-24 2024-25 & 2025-26 (c) executed in any one year, the following minimum quantities of work (1) EWE: 12662.00 cum (2) GSB: 2734.00 cum (3) WMM/WBM: 2490.00 (4) PCC/RCC: 51.00 cum .(5) BM/SDBC: 754.00 Cum (6) Steel: 2.66 mt
Each Tenderer should further demonstrate: ( As per Govt. Circular No. PWD 60 CRM 2021 Dt 08.11.2021)(a) Availability by owning the required / specified key and critical equipment for this work is 1) Hot Mix Plant - 1 No (2) Paver Finisher: 1 No. (3) Vibrator Roller : 1 No(4) Tipper : 2 No (5) Bituminous Mechanical Sprayer : 1 No And availability by lease /Hire basis for this work is (1) Tippers -2 No. (2) Excavator like JCB/Hitachi : 2 No. (3) Water Tanker : 2 No. (The relevant documents ownership / commitment /agreements etc. for availability for this work are furnished)-
Liquid assets and/or availability of credit facilities of no less than Rs. 139.38 Lakhs Credit lines/letter of credit/ certificates from the banks for meeting the fund requirement etc
List of existing commitments and ongoing works
List of works for which tenders already submitted
Total value of civl engineering works executed and payments received in the last five years (year-wise)
Reports on the financial standing of the tenderer, such as profit and loss statements and auditors reports for the last five years
₹5,000
₹6.3 L
5 Sept 2026
5 Sept 2026
18 Sept 2026
15 Sept 2026
14 Sept 2026
Improvements to Road from Ghodampalli to Nagoora Cross Via Sadughat MDR Road Km. 4.00 to 6.00 in Bidar Taluka. (Working Reach Km. 3.758 to 6.00) UNDER 5054 APPENDIX-E
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Cutting of Trees, excluding removal of stumps and roots of trees - Girth from 300 mm to 600 mm. Ref to MoRT&H : IRC - 201
Cutting of Trees, excluding removal of stumps and roots of trees - Girth from 600 mm to 900 mm. Ref to MoRT&H : IRC - 201
Compacting Original Ground - Compacting original ground supporting embankment - Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of emba...
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (R...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta...
Granular Sub-Base - By Mix in Place Method - Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared sur...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ...
Prime Coat over WMM/WBM - Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying ...
Tack coat on Bituminous surface - Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface clean...
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Kilometre Stone - Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc - Ordinary kilometer ston...
Kilometre Stone - Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc - 200 m stone (precast). ...
Pedestrian Crossings as per IRC 99-2018 - Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of...
Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV ret...
Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV ret...
Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV ret...
Direction and Place Identification Signs upto 0.9 m2 Size Board. - Providing and erecting direction and place identification retro- reflectorised sign as per IRC:67:2022 made of high intensity...
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface - Providing and laying of hot applied thermoplastic compound 2.5 mm thick including ref...
Supplying and Fixing of Molded Shank Raised Pavement Markers / Cats Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total int...
Providing and fixing board displaying information, such as Name of work, Tender cost, Name of Contractor, Work completion and liability period etc, having rectangular shape of 1.2...
Metal Beam Crash Barrier - Type - B, THRIE : Metal Beam Crash Barrier - Providing and erecting a Thrie metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal b...
Bituminous Macadam Grading - II for traffic <20 MSA - Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading prem...
Semi Dense Bituminous Concrete - Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading pre...
Tree Cutting Charges to Deposit Forest Department
ROUTINE MAINTENCES ACTIVITES FOR THIRD YEAR
Road Maintenance for 3rd year for Road with BM+SDBC a Wearing coat Maintenance ot Road for Grd vear by Clcaring and Uprooting Veetation on either sides o thc road Maintenance of Surface drains by clea...
ESTIMATES FOR ROUTINE MAINTENCES ACTIVITES FOR FIFTH YEAR
Road Maintenance for 5th year with BM+SDBC coat as wearing coat Maintenance of Road for Sth year by Clearing and Uprooting Vegetation on either sides of the road Maintenance of surface drains by clear...
Construction of CD Works
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
PIPE CULVERTS - Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row - Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta...
Boundary pillar / Guard Stone - Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding...
Estimate for Shifting of HT Line
200105-RCC Pole-9.0M Long,145 kg WL
27901205-11 kV Horizontal cross arm with single top, clamp ,Bolt & Nuts with washers for RCC poles - MS
2811101-Guy with Complete set
2811103-Earthing Materials Type for grounding.
283008-11kV, 5KN Composite/Polymeric Pin Insulator(24mm dia FP Rod)
283320-Silcon rubber composite insulator/11kV 45 kN Polymeric insulator
284108-Rabbit ACSR Conductor
Erection of RCC/PSC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth
Head loading of the pole Above 185 Mtrs
Loading & unloading of 9 mtr RCC/PSC poles
Fixing of V-Shape/Horizontal cross arm including single top support Braces and Insulators fixing.
a) Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT) ...
Providing GI Pipe Earthing for lightning arresters Transformer Neutral and Transformer Metal parts (Excluding digging of pits)
For Rabbit ACSR
Errection of 63kva transformer Complete set
Releasing & Restringing/Tightening of loose spans a) Weasel/ Squirrel
Releasing & Restringing/Tightening of loose spans b) Rabbit
Releasing and Erection of RCC/PCC poles
Releasing of 63kva transformer Complete set
Overhead Charges @ 10% on Sum of Sl No. 1, 2 & 3
Contractors Profit @ 10% on Sum of Sl No. 1, 2 & 3
Deposit Charges 5% on Total Estimate Cost
ESTIMATES FOR ROUTINE MAINTENCES ACTIVITES FOR FOURTH YEAR
Road Maintenance for 5th year with BM+SDBC coat as wearing coat Maintenance of Road for Sth year by Clearing and Uprooting Vegetation on either sides of the road Maintenance of surface drains by clear...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid doc_kw_4_RD_35949.doc
Tender Document • 1.07 MB
Tender Guidelines-KW-4_RD_35949.docx
Tender Submission Guidelines • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .