| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.7 LAccepted-Finance VILLAGE PO BARMAR TEHSIL JAWALI DISTT KANGRA HP | ₹27.7 L | L1 | Accepted-Finance L1 |
| 2 | L2₹28.3 L+₹54,340 (1.96%)Rejected-Finance | ₹28.3 L+₹54,340 (1.96%) | L2 | Rejected-Finance L2 |
Tender Value
₹27.2 L
EMD Value
₹54,300
Closing Date
11 Aug 2026, 11:00 amClosed
Executive Engineer HPPWD Division Kotla Behar
Executive Engineer HPPWD Division Kotla Behar
Balance work of link road Mandwara to Karol via Chanouria Basti, Baba Balotu Mandir, Suker and Dadari Km. 0/0 to 5/150 (SH Removal of Formation Deficiency, in Km 4/019 to 4/120, 4/489 to 4/828, c/o Retaining wall at Rd. 4/030 to 4/046, 4/043.60 to
2026_PWD_140570_10
2222-50 dt 01.08.2026
Open Tender
Civil Works - Roads
Percentage
90 days
Executive Engineer HPPWD Division Kotla Behar
Please refer Tender documents.
16 documents required · 16 mandatory
₹2,000
₹54,300
28 Aug 2026
6 Aug 2026
12 Aug 2026
6 Aug 2026
11 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for road way in hilly areas in all heights and depths and in all kinds of soil by manual/ mechanical means, including saturated soil comprising of ordinary soil, ordinary rock, soft rock, hard rock chiseling or wedging out rock (where blasting is prohibited) and their intermediate classification of soil complete including setting out true to the required lines grades, cutting width and trimming of side slopes, camber, super elevation and levels as shown in the drawings and as directed by the Engineer-in Charge complete according to the MORD Technical Specification Section 300 and 1600 and sorting out and stacking of useful materials with in all leads and lifts in acquired road width and transporting of un-useful materials for filling in road ways, camber, embankments for grade improvements and disposal of all surplus materials to the approved dumping sites through all modes of transportation including head load or animal transport or by mechanical means including leveling, fine dressing and carriage of machineries, materials, tools, equipments and shingle measures and other incidentals necessary to complete the work by mechanical means and labour if required.All useful material such as stones shungle, aggregate and slates etcetra shall be sorted out and stacked in proper stack. Recovery of stones to the tune of 150.00 cubic meter quantity at the rate of Rs. 300/- only (Rupees three hundred only) per cubic meter shall be effected from the contractors running bills on pro-rata basis as per actual quantity executed. Any loss to the public/private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be compensated by him to all cases as per the entire satisfaction and direction of Engineer - in - Charge. The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 1,509.59 | Cubic metre | 175 | ₹2,64,178.25 |
| 2 | Earth work in excavation in foundation for all types of structures such as retaining walls, breast walls, culverts, drains, parapets and other similar structures in all kinds and classification of soil, including saturated soil comprising of ordinary mix soil, ordinary rock, hard rock, chiseling/wedging out rocks (where blasting is prohibited) complete in accordance with the lines and dimensions shown on the drawings, including setting out, construction of shoring, bracing, removal of stumps and other deleterious materials and disposal of excavated material upto any leads and lifts including dressing of sides and bottom and obstructions necessary for placing the foundations, trimming, leveling ramming and watering bottom of excavation and back filling in trenches with excavated suitable approved materials to the original surface in layers not exceeding 15cm (fifteen centimeter) compacted thickness including shoring and strutting and pumping or bailing out water (surface and sub-soil water) up to any depth and any quantum of water and cleaning of slush which may arise out during dewatering complete as per drawing and MORD Technical Specification clause 305.1 and as per the direction and the entire satisfaction of Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 184.73 | Cubic metre | 190 | ₹35,098.7 |
| 3 | Providing and laying cement concrete 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate) 40 mm (forty millimetre) nominal size.in retaining wall including the cost of centering, shuttering and finishing complete as per approved drawing, design, specifications and as per directions and entire satisfaction of the Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 82.45 | Cubic metre | 2,850 | ₹2,34,982.5 |
| 4 | Providing weep holes in brick masonry/stone masonry/plain reinforced concrete abutment, wing wall, return wall with 100mm (one hundred millimetres) diameters P.V.C. pipe extending through the full width of the structure with slope of 1(v):20(H) towards drawing face complete as per drawing and technical specifications Clause 614, 709, 1204.3.7 , as per direction of Engineer-in-Charge including carriage of materials within all leads, lifts and other incidental. The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 44 | Numbers | 190 | ₹8,360 |
| 5 | Back filling behind abutment, wing wall and return wall complete as per drawing & Technical Specification Clause-1204.3.8 Granular material and as per the entire satisfaction and direction of Engineer – in- Charge including carriage of materials within all leads, lifts and other incidental. The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 6.3 | cubic metre | 780 | ₹4,914 |
| 6 | Providing and laying mechanically mixed and vibrated cement concrete 1:4:8 (one cement isto four sand isto eight graded crushed stone aggregate 40mm (forty millimeter) nominal size) for plain cement concrete, in or under water in open foundation for all types of structures, including pumping or bailing out water/ dewatering (surface/sub-soil water) and including removal of slush which may arise at the time of laying under water for all heights/depth and any quantum of water including cost of form work and curing complete as per drawing and MORD technical specification 802, 803, 1202 & 1203 and as per the direction and the entire satisfaction of Engineer-in-Charge, including carriage of material with in all leads lifts and other incidentals. The rate is including Royality, Malkhana, Octroi, Toll Tax, Sale Tax, or any other taxes imposed excluding GST by the Government. | 20.52 | Cubic metre | 3,075 | ₹63,099 |
| 7 | Providing and laying mechanically mixed and vibrated concrete for plain cement concrete nominal mix 1:3:6 (One cement isto three sand isto six graded crushed stone aggregate 20mm (twenty millimeter) nominal size), on ground or under water for all type of structure, in drain,edge wall and the like etcetera complete including pumping or bailing out water, dewatering (surface/sub soil water)including removal of slush which may arise at time of laying concrete for all heights/depths including cost of form work and curing complete for 14 (fourteen) days as per drawing and MORD Technical specification section 800, 900, 1200 and 1600 as per entire satisfaction and directions of Engineer-in-charge, including carriage of materials within all leads, lifts and other incidentals. The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 90 | Cubic metre | 3,650 | ₹3,28,500 |
| 8 | Providing and laying mechanically mixed and vibrated concrete for plain cement concrete in substructure Grade M-15 (M-Fifteen) Nominal mix 1:2½:5 (one cement : two and half sand : five graded crushed stone aggregate (40mm) forty millimeters nominal size)on ground or under water, including pumping or bailing out water/ dewatering (surface and sub-soil water) and removal of the slush which may arise at the time of laying concrete, for all heights/depths and any quantum of water, toe wall and parapets etcetera including cost of form work and curing complete as per drawing and MORD technical specification section 800, 900 and 1200 and as per the direction and the entire satisfaction of Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidentals. The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 74.42 | Cubic metre | 3,850 | ₹2,86,517 |
| 9 | Providing and laying cement concrete 1:2:4 (1 cement:2 Sand:4 graded stone aggregate 20mm nominal size) and curing complete mechanically mixed and vibrated including cost of form work in open foundation as per approved specification, drawing and design complete upto floor all level within all leads, lifts of materials and other. incidentals and as per approved drawing, design and as directed by the Engineer-in-Charge.The rate is including Royality, Malkhana, Octroi, Toll Tax, Sale Tax, or any other taxes imposed excluding GST by the Government. | 31.72 | Cubic metre | 4,470 | ₹1,41,788.4 |
| 10 | Providing and laying (to level or slope) 900mm (Nine Hundred millimeter) diameter ISI marked reinforced cement concrete heavy duty non pressure pipes I.S class NP-2 as per design for culverts first class bedding of granular material in single row including providing and fixing collar with cement mortar 1:2 (one cement : two sand) but excluding the cost of excavation, protection works, back filling, concrete bedding and masonary work in head walls and parapets etcetera as per drawing and MORD technical specification as section 1100 as per the direction and the entire satisfaction of Engineer-in-Charge including carriage of materials with in all leads, lifts and other incidentals. The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 7.5 | Running metre | 3,175 | ₹23,812.5 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
10.pdf
Tender Documents • 3.38 MB
BOQ_208658.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .