| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.7 LAdmitted-Finance | ₹26.7 L | L1 | Admitted-Finance |
| 2 | L2₹26.7 L+₹1,833.23 (0.07%)Admitted-Finance | ₹26.7 L+₹1,833.23 (0.07%) | L2 | Admitted-Finance |
| 3 | L3₹26.7 L+₹4,069.88 (0.15%)Admitted-Finance | ₹26.7 L+₹4,069.88 (0.15%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MAHESWARI BORO L1 | Sri Shiva Prasad Rabha L3 | Dwimalu Brahma L2 |
|---|---|---|---|---|---|---|
| 1.00Establishment of Children Park (part-I) | ||||||
| 1.01 | Construction of subgarde and earthen shoulders with approved materials obtained from borrow pits with all lifts and leads,transporting to site, spreading ,grading to required slop and compacted to meet requirment of Table 300.2 with lead upto 1000m as per Technical Specification .(i) Private Land | 4,419.04 | Cum | 354.6 ₹15,66,991.58 Lowest | 355.5 ₹15,70,968.72 | 355 ₹15,68,759.2 |
| 1.02 | Provising and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280and IS:4826 in 100mmX 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighting not less than 25 kg each as per drawing and technical specifications. | 52.81 | Cum | 2,903.63 ₹1,53,340.7 Lowest | 2,904 ₹1,53,360.24 | 2,904 ₹1,53,360.24 |
| 1.03 | Construction of reatining walls/breast walls in cement mortar 1:5 as per drawing Stone machinary in cement mortar 1:5 | 108.38 | Cum | 5,902.6 ₹6,39,723.79 Lowest | 5,903 ₹6,39,767.14 | 5,903 ₹6,39,767.14 |
| 1.04 | Fencing with RCC post placed at required distance embedded in cement conceret blocks ,every 15th post,last but one end post and corner post shall be strutted on both side only ,provided with horizontal lines and two diagonals of barbed wire weighting 9.38 Kg per 100 meters(minimum) between the two posts fitted and fixed with GI staples on wooden plugs or G.I binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C posts ,struts,earth work and concerete to be paid separtly ):-Payment to be made per meter cost of total length of barbed wire used. | 217 | Rm | 14.69 ₹3,187.73 Lowest | 14.8 ₹3,211.6 | 14.7 ₹3,189.9 |
| 1.05 | RCC Standards post/struts/rails/pales of mix 1:1:5:3(1 Cement:1.5 coarsesand:3 garded stone aggregate 12.mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer incharge (cost of earth works inexcavation ,concrete works in foundation to be paid separtely) (i) RCC posts | 9.06 | Cum | 33,751.54 ₹3,05,788.95 Lowest | 33,752.2 ₹3,05,794.93 | 33,751.6 ₹3,05,789.5 |
Tender Value
₹26.7 L
EMD Value
₹53,386
Closing Date
16 Sept 2026, 4:00 pmClosed
Chairman
Ward No-2 MB Road Tangla Udalguri Assam
Establishment of Children Park at Tangla Town (Part-I)
2026_BoTC_53611_1
TMB-140/ 6th FC/2026-27/142
Open Tender
Civil Works
Works
90 days
Ward no-2 Tangla Town
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,500
Yes
₹53,386
Yes
19 Sept 2026
27 Aug 2026
16 Sept 2026
27 Aug 2026
16 Sept 2026
27 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Establishment of Children Park (part-I) | |||||
| 1.01 | Construction of subgarde and earthen shoulders with approved materials obtained from borrow pits with all lifts and leads,transporting to site, spreading ,grading to required slop and compacted to meet requirment of Table 300.2 with lead upto 1000m as per Technical Specification .(i) Private Land | 4,419.04 | Cum | - | - |
| 1.02 | Provising and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280and IS:4826 in 100mmX 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighting not less than 25 kg each as per drawing and technical specifications. | 52.81 | Cum | - | - |
| 1.03 | Construction of reatining walls/breast walls in cement mortar 1:5 as per drawing Stone machinary in cement mortar 1:5 | 108.38 | Cum | - | - |
| 1.04 | Fencing with RCC post placed at required distance embedded in cement conceret blocks ,every 15th post,last but one end post and corner post shall be strutted on both side only ,provided with horizontal lines and two diagonals of barbed wire weighting 9.38 Kg per 100 meters(minimum) between the two posts fitted and fixed with GI staples on wooden plugs or G.I binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C posts ,struts,earth work and concerete to be paid separtly ):-Payment to be made per meter cost of total length of barbed wire used. | 217 | Rm | - | - |
| 1.05 | RCC Standards post/struts/rails/pales of mix 1:1:5:3(1 Cement:1.5 coarsesand:3 garded stone aggregate 12.mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer incharge (cost of earth works inexcavation ,concrete works in foundation to be paid separtely) (i) RCC posts | 9.06 | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
BOQ_84358.xls
BOQ • 0.38 MB
SBD_PARK.pdf
Tender Documents • 3.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .