| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC | ₹8.0 L | L1 | Accepted-AOC LI |
| 2 | L2₹8.1 LRejected-AOC | ₹8.1 L | L2 | Rejected-AOC L2 |
| 3 | L3₹8.2 LRejected-AOC | ₹8.2 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | UNION ELECTRIC ENGINEERING WORKS L2 | V S ASSOCIATES L1 | L3 |
|---|---|---|---|---|---|---|
| 1.00App.A- Working Charges & Cost of Materials | ||||||
| 1.00 | OD249594/2025-2026:Charges for conveyance to Tools and other required equipment from work shop to Pump house and return back, Charges for disconnecting power supply and dismantling LT and HT connection of transformer, Charges for shifting 500KVA transformer in the foundation from the yard to outside the transformer room. | 1 | no | 9,857.87 ₹9,857.87 | 9,727 ₹9,727 | 10,000 ₹10,000 |
| 1.00 | OD249606/2025-2026:Charges for conveyance of transformer from Aanandavalleswaram pump house to Transformer factory, Charges for lifting transformer using crain, Charges for dismantling 500KVA transformer , top cover opening and lifting from tank and seperating HV and LV coils. | 1 | no | 17,699.11 ₹17,699.11 | 17,463 ₹17,463 | 18,000 ₹18,000 |
| 1.00 | OD249619/2025-2026:Charges for cleaning the core and coils | 1 | no | 6,397.71 ₹6,397.71 | 6,313 ₹6,313 | 7,000 ₹7,000 |
| 1.00 | OD249621/2025-2026:Charges for replacing damaged insulations and Charges for new insulation material connecting | 1 | no | 5,985.61 ₹5,985.61 | 5,906 ₹5,906 | 6,500 ₹6,500 |
| 1.00 | OD249624/2025-2026:Charges for making winding former for LT and HT | 1 | no | 11,702.48 ₹11,702.48 | 11,547 ₹11,547 | 11,800 ₹11,800 |
| 1.01 | OD249639/2025-2026:Charges for HT coils winding | 1 | no | 11,176 ₹11,176 | 11,027 ₹11,027 | 11,300 ₹11,300 |
| 1.01 | OD249668/2025-2026:Charges for LT coils winding | 1 | no | 13,038.53 ₹13,038.53 | 12,865 ₹12,865 | 13,150 ₹13,150 |
| 1.01 | OD249671/2025-2026:Charges for transformer coils re assembling | 1 | no | 23,807.69 ₹23,807.69 | 23,490 ₹23,490 | 24,000 ₹24,000 |
| 1.01 | OD249675/2025-2026:Charges for ovening charge for 3 days including current charges, Charges for conservator tank opening and cleaning | 1 | no | 15,438.83 ₹15,438.83 | 15,233 ₹15,233 | 15,700 ₹15,700 |
Tender Value
₹8.4 L
EMD Value
₹20,920
Closing Date
19 May 2026, 1:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer WS SUB DIVISION KOLLAM
Overhauling and maintanance work of 500KVA Transformer No2 at Booste pum house Anandavalleeswaram
2026_KWA_849460_1
RE 16/2026-27/AEE/WSSD/KLM
Open Tender
Civil Works - Water Works
KOLLAM
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,845
Yes
₹20,920
Yes
3 Jun 2026
12 May 2026
20 May 2026
12 May 2026
19 May 2026
12 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1App.A- Working Charges & Cost of Materials | ||||||
| 1.001 | OD249594/2025-2026:Charges for conveyance to Tools and other required equipment from work shop to Pump house and return back, Charges for disconnecting power supply and dismantling LT and HT connection of transformer, Charges for shifting 500KVA transformer in the foundation from the yard to outside the transformer room. | - | no | - | - | BI01010001010000000000000515BI0100001114 |
| 1.002 | OD249606/2025-2026:Charges for conveyance of transformer from Aanandavalleswaram pump house to Transformer factory, Charges for lifting transformer using crain, Charges for dismantling 500KVA transformer , top cover opening and lifting from tank and seperating HV and LV coils. | - | no | - | - | BI01010001010000000000000515BI0100001115 |
| 1.003 | OD249619/2025-2026:Charges for cleaning the core and coils | - | no | - | - | BI01010001010000000000000515BI0100001116 |
| 1.004 | OD249621/2025-2026:Charges for replacing damaged insulations and Charges for new insulation material connecting | - | no | - | - | BI01010001010000000000000515BI0100001117 |
| 1.005 | OD249624/2025-2026:Charges for making winding former for LT and HT | - | no | - | - | BI01010001010000000000000515BI0100001118 |
| 1.006 | OD249639/2025-2026:Charges for HT coils winding | - | no | - | - | BI01010001010000000000000515BI0100001119 |
| 1.007 | OD249668/2025-2026:Charges for LT coils winding | - | no | - | - | BI01010001010000000000000515BI0100001120 |
| 1.008 | OD249671/2025-2026:Charges for transformer coils re assembling | - | no | - | - | BI01010001010000000000000515BI0100001121 |
| 1.009 | OD249675/2025-2026:Charges for ovening charge for 3 days including current charges, Charges for conservator tank opening and cleaning | - | no | - | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1435409.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
NOTICE500KVA.pdf
Other Document • 0.03 MB
BID500KVA.pdf
Tender Documents • 2.01 MB
BOQ_1435409.xls
BOQ • 0.31 MB
termscondition.pdf
Additional Documents • 0.11 MB