| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC 01 REWARI REWARI HARYANA 123401 | REWARI | HARYANA | 123401 | ₹1.2 Cr | L1 | Accepted-AOC quoted lowest amout |
| 2 | L2₹1.3 Cr+₹6.1 L (4.95%)Rejected-AOC 121004 | ₹1.3 Cr+₹6.1 L (4.95%) | L2 | Rejected-AOC quoted higher rate than L1 |
| 3 | L3₹1.3 Cr+₹6.8 L (5.55%)Rejected-AOC 21 SARSWATIPURAM KHARGAPUR GOMTI NAGAR LUCKNOW 226010 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226010 | ₹1.3 Cr+₹6.8 L (5.55%) | L3 | Rejected-AOC quoted higher rate than L1 |
| 4 | Not Admitted-Fee/PreQual/Technical D 39 DIVYA NAGAR GORAKHPUR | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
21 Feb 2024, 2:45 pmClosed
SE Sixth Circle IW Lucknow
Office of SE six circle Lucknow
DISTRICT LUCKNOW ME STHIT HARDING BRIDGE kM 0.000 SE SITAPUR RAILWAY CROSSING KM 0.800 TAK GOMTI NAGAR KE BAYE TATBANDH KE PUNRODHAR KARYA
2024_UPIDC_897336_1
19/SE-6/2023-24
Open Tender
Civil Works - Canal
Item Rate
300 days
Lucknow
As per pre qualification document
4 documents required · 4 mandatory
₹2,354
₹2.6 L
Yes
Office of SE six circle Lucknow
18 Apr 2024
15 Feb 2024
21 Feb 2024
15 Feb 2024
21 Feb 2024
15 Feb 2024
17 Feb 2024
Amount
Heavy jungle clearance with thorney bushes on afflux bunds of Barrages including of all labour,material & T&P upto proper completion of work.
Earth work at Left Gomti Bund outer side slope by power transport for a lead of upto 1km including excavation. Loading, unloading, raoyalty, manual, compaction and dressing including all lift, rates shall be applicable for lead beyand 630m and upto 1km including of all labour,material & T&P upto proper completion of work.
Dressing of Left Gomti Bund Inner side slope including of all labour,material & T&P upto proper completion of work.
Turfing of Left Gomti Bund Inner side slope with chopa Grass inluding watering including of all labour,material & T&P upto proper completion of work.
Laying Plain Cement Concrete (M-15) in foundation 1:2:4 with Cement,coarse sand & stone grit in sleeper including cost of material, labour, T&P etc upto proper completion of work.
Brick Masonary in 1:4 Cement and coarse sand mortar using m-150 class brick in sleeper in all respect including all lifts/cum including of all labour,material & T&P upto proper completion of work.
Cement pointing in 1:2 cement, coarse sand mortar in sleeper including cost of material, labour and T&P etc upto proper completion of work.
Brick on edge pitching with 1st class bricks in 1:4 cement and coarse sand mortar in outer slope including cost of all material, labour & T&P etc. required for proper completion of work.
Laying Plain Cement Concrete (M-15) in foundation 1:2:4 with cement, coarse sand & stone grit in toe wall including cost of material, labour, T&P etc upto proper completion of work.
Brick Masonary in 1:4 Cement and coarse sand mortar in toe wall using M-150 class brick in all respect including all lifts including of all labour,material & T&P upto proper completion of work.
Brick Masonary in 1:4 Cement and coarse sand mortar in parapet wall using M-150 class brick in all respect including all lifts including of all labour,material & T&P upto proper completion of work.
12mm cement plastring in 1:4 in cement, coarse sand mortar in parapet wall including of all labour,material & T&P upto proper completion of work.
Brick Masonary in 1:4 Cement and coarse sand mortar in stairs using M-150 class brick in all respect including all liftS including of all labour,material & T&P upto proper completion of work.
12mm cement plastring in 1:4 in cemet, coarse sand mortar in stairs including of all labour,material & T&P upto proper completion of work.
Laying Plain Cement Concrete (M-15) in foundation 1:2:4 with cement, coarse sand & stone grit in rainchute including cost of material, labour, T&P etc including of all labour,material & T&P upto proper completion of work.
Brick Masonary in 1:4 Cement and coarse sand mortar in rainchute using M-150 class brick in all respect including all lifts including of all labour,material & T&P upto proper completion of work.
Cement pointing in 1:2 cement, coarse sand mortar in rainchute including cost of material, labour and T&P etc for proper completion of work.
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster in barrel no. 25 & chaukidar room including disposal of rubbish to the dumping ground within 50m lead including of all labour,material & T&P upto proper completion of work.
12mm cement plastring in 1:4 in cemet, coarse sand mortar in barrel no. 25 & chaukidar room including of all labour,material & T&P upto proper completion of work.
Cement pointing in 1:2 cement, coarse sand mortar in barrel no. 25 & chaukidar room including cost of material, labour and T&P etc for proper completion of work
One priming coat and two coat of oil distemper on old distepered surface in barrel no. 25 & chaukidar room including supply of all material, labour and T&P etc. required for proper complition of work.
M/S KUMAR MANGLAM CONSTRUCTION
M/s RATHAUR CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .