Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹18.2 LAccepted-Finance VILLAGE URU P O SHINGLA TEHSIL RAMPUR DISTT SHIMLA | L-1 | Accepted-Finance accepted | |
| 2 | L-2₹19.0 L+₹82,925.50 (4.55%)Rejected-Finance V P O MILLAH TEHSIL SHILLAI DISTT SIRMOUR 173029 | SIRMAUR | HIMACHAL PRADESH | 173029 | L-2 | Rejected-Finance rejected | |
| 3 | L3₹19.2 L+₹95,812.80 (5.26%)Rejected-Finance VILL SOBLI P O DEVNAGAR TEHSIL RAMPUR DISTT SHIMLA H P | SHIMLA | SHIMLA | HIMACHAL PRADESH | L3 | Rejected-Finance rejected |
| Sl No | Description | Qty | Unit | M/S KEDAR BHALUNI L3 | Kuldeep Singh L2 | M/s Prabhu Dyal L1 |
|---|---|---|---|---|---|---|
| 1.00Prov.form work with steel plates 3.15mm thick welded with angle iron frame 30 x 30 x 5mm so as to give a fair finish including centring, shuttering,strutting & propping etc. with wooden battens and ballies, height of propping & centering below supporting floor to ceiling not exceeding 4mtr.& removal of same for insitu rainforced concrete and plain concrete work complete in all leads and lifrs and as per the directioin and to the entire satisfaction of the Engineer-in-Charge :- | ||||||
| 1.01 | Columns, Pillars, , Posts and Struts etc. | 26.4 | Cum | 700 ₹18,480 Lowest | 850 ₹22,440 | 800 ₹21,120 |
| 1.02 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 39.03 | Cum | 700 ₹27,321 Lowest | 720 ₹28,101.6 | 700 ₹27,321 Lowest |
| 1.03 | Suspended floors, roofs, landings, balconies and access platform | 71.96 | Cum | 850 ₹61,166 | 850 ₹61,166 | 830 ₹59,726.8 Lowest |
| 1.04Edges of slabs and breaks in floors and walls | ||||||
| 1.05 | Under 20 cm wide | 36.08 | Rmt. | 150 ₹5,412 Lowest | 200 ₹7,216 | 160 ₹5,772.8 |
| 2.00Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : | ||||||
| 2.01 | 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) | 1.98 | Cum | 13,000 ₹25,740 | 12,500 ₹24,750 | 12,100 ₹23,958 Lowest |
| 2.02 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) | 12.85 | Cum | 13,700 ₹1,76,045 | 13,000 ₹1,67,050 | 12,500 ₹1,60,625 Lowest |
| 3.00Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level | ||||||
Tender Value
₹17.0 L
EMD Value
₹33,951
Closing Date
4 Sept 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE Rampur
JSD Rampur
Stock storage Sarahan
2025_HPIPH_113078_1
No.EE-JSD-RMP-E-ten/-5109-5159 dt 26.08.2025
Open Tender
Civil Works
Item Rate
90 days
Sarahan
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
₹33,951
22 Nov 2025
27 Aug 2025
5 Sept 2025
27 Aug 2025
4 Sept 2025
27 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .