Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
29 May 2026, 4:00 pmClosed
Executive Engineer
Office of the Executive Engineer ED-Vijaypur
Rate Contract for Carrying out Augmentation of TransformerSubStations from Existing Capacity of 25 KVA to 63 KVA and 100 KVA,63 KVA to 100 KVA and250 KVA,100KVA to 250 KVA and 250 KVA to 400 KVA within the jurisdiction of Electric Division Vijaypur
2026_PDD_309592_1
EDV/04 of 2026-2027 Dated 08-05-2026
Open Tender
Electrical Works
Turn-key
60 days
Vijaypur
As per SBD
6 documents required · 6 mandatory
₹1,000
Executive Engineer, Electric Division Vijaypur
₹1 L
Office of the Executive Engineer ED-Vijaypur
17 Jul 2026
8 May 2026
30 May 2026
9 May 2026
29 May 2026
9 May 2026
9 May 2026 - 29 May 2026
21 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Scope of work for Augmentation of 25 KVA Distribution Transformer to 63 KVA | |||||
| 1.01 | Supply, Installation & commissioning of 11/0.433 KV, 63 KVA 3-Phase Distribution Transformer (Aluminium Wound) of latest Energy efficiency Level: 2, "IS-1180 part-I, 2014 as per latest upto date amendment along with transporatation | 1 | No | - | - |
| 1.02 | Supply, Installation, Testing & Commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp,Vertical Type | 1 | Set | - | - |
| 1.03 | Supply, Installation, Testing & Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A | 1 | Set | - | - |
| 1.04 | Supply Installation, Testing & Commissioning of Gapless Surge Arrestor,9 kV ,10 kA ,LA withpolymer housing, Stn. Type | 1 | Set | - | - |
| 1.05 | Providing & Fixing of 120 mm² Single Phase Cable, 1.1 KV grade,PVC insulated Stranded conductor FRLS type(44 mtrs for each) | 44 | Mtr | - | - |
| 1.06 | Providing & Fixing of LT Distribution Box for 63 KVA DTR with MCCB for incomer & switch fuse unit for Out Going Ckts. | 1 | No | - | - |
| 1.07 | Providing of Earthing of Sub-Station - Excavation of Earth Pit650mm and depth 3000mm , Installation of Earth Pipe of 40 mm of nominal bore & 4 mm wall thickness with length 2.5 Mtr long as per IS 1239, GI Strip for neutral Earthing of Size 25mm x3mm thickness for connection of Transformer Body, GO Set, LA Set as per IS 2629/85 GI nuts and bolts refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover(3per S/stn) | 3 | No | - | - |
| 1.08 | Supply Erection Testing & commissioning of 9 mtrs ST poles(ST-410 SP33) | 2 | No | - | - |
| 1.09 | Cement bottoming 1:2:4 mix as per REC Standards 0.5cum/pole | 2 | No | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
Tendernotice_2.pdf
PDF • 1.45 MB
BOQ_1002171.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .