| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 CrAccepted-AOC VILLAGE MAHAWAR THANA DHOLNA DISTRICT KASGANJ | KASGANJ | UTTAR PRADESH | 207123 | ₹7.4 Cr Quoted ₹7.2 Cr | L1 | Accepted-AOC Accepted Being Lowest |
| 2 | L2₹7.6 CrRejected-Finance H NO 431 RAJENDRA NAGAR ASHOK TENT HOUSE INDRA NAGAR BAREILLY | BAREILLY | BAREILLY | UTTAR PRADESH | ₹7.6 Cr | L2 | Rejected-Finance Being Higher |
| 3 | L3₹7.8 CrRejected-Finance SURYA FACTORY SORAN ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹7.8 Cr | L3 | Rejected-Finance Being Higher |
| 4 | L4₹8.0 CrRejected-Finance | ₹8.0 Cr | L4 | Rejected-Finance Being Higher |
| 5 | L5₹8.4 CrRejected-Finance KOTHI NO 6 CIVIL LINES OPP TB TOWER DISTRICT MORADABAD UTTAR PRADESH | MORADABAD | UTTAR PRADESH | 244001 | ₹8.4 Cr | L5 | Rejected-Finance Being Higher |
| Sl No | Description | Qty | Unit | ms Dev cont L1 | M/S M A DEVELOPERS AND ENGINEERS L5 | M/s Hanu Infrastructure Pvt Ltd L3 | RAJEEV TRADERS L2 | M/S A M CONSTRUCTIONS L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation for roadwork in soil with hydraulic excavatot including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the emnankment location within all lifts and load up to 1000m. | 3,099 | Cum | 50 ₹1.5 L | 45 ₹1.4 L | 30 ₹92,970 | 70 ₹2.2 L | 10 ₹30,990 |
| 2.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 29,800 | Cum | 57 ₹17.0 L | 50 ₹14.9 L | 50 ₹14.9 L | 80 ₹23.8 L | 10 ₹3.0 L |
| 3.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.(FOR SHIFTING AND COMPACTION ONLY)
(Data Book Sr. no. - 3.17) | 3,099 | Cum | 55 ₹1.7 L | 30 ₹92,970 | 30 ₹92,970 | 65 ₹2.0 L | 10 ₹30,990 |
| 4.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 | 6,533 | Cum | 50 ₹3.3 L | 40 ₹2.6 L | 50 ₹3.3 L | 90 ₹5.9 L | 10 ₹65,330 |
| 5.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Carted Earth) | 1,320 | Cum | 130 ₹1.7 L | 60 ₹79,200 | 70 ₹92,400 | 100 ₹1.3 L | 10 ₹13,200 |
| 6.00 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 440 | Cum | 3,790 ₹16.7 L | 3,500 ₹15.4 L | 3,500 ₹15.4 L | 4,500 ₹19.8 L | 3,800 ₹16.7 L |
| 7.00 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing | 3,738 | Cum | 5,680 ₹2.1 Cr | 6,500 ₹2.4 Cr | 6,500 ₹2.4 Cr | 6,100 ₹2.3 Cr | 5,900 ₹2.2 Cr |
| 8.00 | Construction of granular sub-base by providing close graded material mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with Mechanical Paver on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | 3,404 | Cum | 2,300 ₹78.3 L | 2,700 ₹91.9 L | 2,500 ₹85.1 L | 2,200 ₹74.9 L | 2,750 ₹93.6 L |
| 9.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 3,777 | Cum | 2,400 ₹90.6 L | 2,800 ₹1.1 Cr | 3,000 ₹1.1 Cr | 2,200 ₹83.1 L | 2,800 ₹1.1 Cr |
| 10.00 | Providing and laying priming coat with bitumen emulsion (SS-1 grade) using Emulsion pressure distributor at the rate of 0.60 Kg. Per sqm on the prepared surface of granular base cleaned with mechanical broom. | 26,905 | Sqm | 30 ₹8.1 L | 12 ₹3.2 L | 25 ₹6.7 L | 30 ₹8.1 L | 30 ₹8.1 L |
Tender Value
₹10.1 Cr
EMD Value
₹20.3 L
Closing Date
30 Jan 2026, 12:00 pmClosed
S E Bareilly Circle PWD Bareilly
Superintending Engineer Bareilly Circle PWD Bareilly
Widening and strengthening work of the village Rajunagla Baheri Shergarh road (ODR) from Richha Station via Girdharpur, in District Bareilly FY 2025-26 (Including Maintenance for 05 year)
2026_CEBLY_1108676_1
45/413C(E-Tender)-3/2025-26 Dated 03.01.2026
Open Tender
Civil Works - Roads
270 days
Bareilly
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,725
₹20.3 L
S E Bareilly Circle PWD Bareilly
10 Apr 2026
23 Jan 2026
30 Jan 2026
23 Jan 2026
30 Jan 2026
23 Jan 2026
24 Jan 2026
Excavation for roadwork in soil with hydraulic excavatot including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the emnankment location within all lifts and load up to 1000m.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.(FOR SHIFTING AND COMPACTION ONLY) (Data Book Sr. no. - 3.17)
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Carted Earth)
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
Construction of granular sub-base by providing close graded material mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with Mechanical Paver on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing and laying priming coat with bitumen emulsion (SS-1 grade) using Emulsion pressure distributor at the rate of 0.60 Kg. Per sqm on the prepared surface of granular base cleaned with mechanical broom.
Providing and applying tack coat with bitumen using VG-10 pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 (VG-30)per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Providing and laying bituminious concrete with 100-120 batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.40% as per job mix, and filler, transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 509 complete in all respects.
Providing and Laying of Interlocking Concrete Block Pavements having thickness 100 mm as per drawings and Technical Specification Clause 1504.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. As per Ref to MoRTH specifications 304 Sr.No 12.1
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and as per MORT&H Specification Clause 1500, 1700 & 2100. (Grade M-20)
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in Single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry. (1000 mm Dia)
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in Single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry. (600 mm Dia)
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. 1500, 1700 & 2100 (Grade M-25)
Providing and laying stone boulder apron on river bed for protection againest scour with stone boulder weighting not less than 40 kg each complete as per drawing and technical specifications (MORT&H Specification no 2503
Providing and laying stone boulder pitching on slopes using 25-60 kg stone boulder on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specifications (MORT&H Specification no 2504
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications (MOR&H Specification no 2504)
Sand filling in foundation trenches as per Drawing & technical specification no 304
Bricks Ballast 40 mm gauge filling behind abutment, wing wall & return wall complete as per drawing & technical specification.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
SBDPart1.pdf
Tender Documents • 0.73 MB
SBDPart2.pdf
Tender Documents • 0.43 MB
Addendum01.pdf
Tender Documents • 1.97 MB
BOQ_2047028.xls
BOQ • 0.25 MB
BOQPARTB01.pdf
Additional Documents • 0.47 MB
Download all tender documents and submit your bid