Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.6 LAdmitted-Technical | -40.55% | ₹10.6 L | L1 | Admitted-Technical Responsive |
| 2 | L2₹11.0 L+₹43,422.18 (4.10%)Admitted-Technical | -38.11% | ₹11.0 L+₹43,422.18 (4.10%) | L2 | Admitted-Technical Responsive |
| 3 | L3₹11.5 L+₹96,810.10 (9.15%)Admitted-Technical | -35.11% | ₹11.5 L+₹96,810.10 (9.15%) | L3 | Admitted-Technical Responsive |
| 4 | L4₹13.2 L+₹2.7 L (25.1%)Admitted-Technical | -25.65% | ₹13.2 L+₹2.7 L (25.1%) | L4 | Admitted-Technical Responsive |
Tender Value
Refer Docs
EMD Value
₹42,000
Closing Date
16 Apr 2026, 6:55 pmClosed
Executive Engineer
Duderhama Ganderbal Opposite Qamariya Park
Permanent Restoration of road Satrina- Kawcherwan, Package No JK13-68.
2026_KSRRD_147166_3
NIT No. 01/EE/PMGSY/GBL/E-Tendering of 2026-27 Dated 01/04/2026
Open Tender
Civil Works - Roads
Percentage
Ganderbal
Please refer Tender documents.
8 documents required · 8 mandatory
₹800
Executive Engineer PMGSY Ganderbal
₹42,000
25 Apr 2026
3 Apr 2026
17 Apr 2026
3 Apr 2026
16 Apr 2026
3 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | - | cum | - | - |
| 2 | Providing and laying hand packed stone soling in foundation ,incl ramming watering ramming carriage from approved source to site with all leads, lifts, loading, unloading, stacking and octori incl all carriages.(Finished work ) | - | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 20 mm nominal size) including all carriages of material involved | - | cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)including all carriages of material involved | - | cum | - | - |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)including all carriages of material involved | - | cum | 7,960.42 | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | - | sqm | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | - | sqm | 551.46 | - |
| 8 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc complete.(50mm thick) including all carriages of material involved | - | sqm | - | - |
| 9 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level (1:1.5:3) including all carriages of material involved | - | cum | - | - |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete above plinth level | - | kg | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.77 MB
BOQ_228997.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .