| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.4 LAccepted-AOC | 1 | Accepted-AOC lowest bidder executed the agreement on 06.09.2021 | |
| 2 | Rejected-Technical | - | Rejected-Technical second lowest bidder and rejected | |
| 3 | Rejected-Technical | - | Rejected-Technical third lowest bidder and rejected |
Tender Value
Refer Docs
EMD Value
₹13,386
Closing Date
11 Aug 2021, 3:00 pmClosed
Assistant Executive Engineer PWD Roads Subdivision
Assistant Executive Engineer PWD Roads Subdivision Perubavoor
footpath M20 grade cover slabs, kerb with painting, hand rail, raising of drain side walls using PCC M15, delineators
2021_PWD_432947_1
TR/RD/2021/1910/1
Open Tender
Civil Works - Roads
Item Rate
90 days
Keezhillam
please refer Tender documents
7 documents required · 7 mandatory
₹1,970
₹13,386
2 Nov 2021
3 Aug 2021
14 Aug 2021
3 Aug 2021
11 Aug 2021
3 Aug 2021
Amount
Detailed Estimate
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
8.1.A:Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC Using Concrete Mixer on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
8.20:Providing, Fixing and erecting 50 mm dia GI pipe railing in 3 rows duly painted on Tubular Steel Railing on Medium Weight Steel Channel ( ISMC series) 100 mm x 50 mm, 1.2 metres high above ground, 2 m centre to centre, complete as per approved drawings including painting over suitable primer .
8.15:Supplying and installation of delineator (Roadway indicators) posts 80- 100cm high above ground level, pained black, and white in 15 cm wide strips, fitted with min. 80 x 100 mm rectangular or 75 mm dia circular retro reflectorized panels at the top with minimum visibility of 300m with provisions to prevent edge lifting and vandalisam, and conforming to clause 806 , IRC-79 and the drawings including fixing to ground (The deleniator shall be of approved type as per specification)
8.5:Providing and fixing of direction and place identification retro-reflectorised sign with 7 years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
footpath
11.20.1:Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Light shade pigment using white cement
JOSE PAUL
MOHANAN.N.V
Bidder Name
MOHANAN.N.V
JOSE PAUL
AFKAR ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_614737.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .