Tender Value
₹6.9 L
EMD Value
₹7,000
Closing Date
1 May 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Panchayat Road and Building Division, Morbi
Construction of Protection Wall,Earth Work Near Govindbhai Bochiya House and Precast storm water drain Near Gate At Motibarar Village (Under Jilla Panchayat Swabhandol Year -2025-26) Tal.Maliya Dist. Morbi (2nd Attempt)
298589
64 / 2026
Open
Civil - All
Morbi
6 documents required · 6 mandatory
₹900
Executive Engineer, Panchayat Road and Building Division, MORBI
₹7,000
23 Apr 2026
23 Apr 2026
23 Apr 2026
1 May 2026
23 Apr 2026
BILL OF QUANTITY
Memorandum showing items of works to be carried out
Item Discription of Item (With Brief Specification and reference to Quantity Unit Rate In Amount
No. book of Specification) Figures
In Figure Rs. Ps
1 Excavation for foundation upto 1.5M. Depth including sorting out 65.130 Cum 267.08
and stacking of useful materials and disposing of the excavated
stuff upto 50 mt. lead in (C)hard Murrum
2 Providing and laying Cement concrete 1:4:8 ( 1-Cement : 4- 7.230 Cum 2769.69
Coarse sand : 8-hand broken stone aggregate 40mm nominal
size) and curing complete excluding the cost of form work in (A)
Foundation and Plinth
3 Providing and laying cement concrete 1:2:4 (1-Cement : 2-Coarse 112.300 Cum 4073.54
sand : 4-Graded stone aggregates 20mm niminal size) and curing
complete excluding cost of formwork.and reinforcement for
reinforced concrete work in (A) foundation, footings, base or
columns and mass concrete
4 Providing formwork of ordinary timber plank so as to give a rough 221.760 Sqm 180.40
finish including centering, shuttering, strutting and centering below
supporting floor to celiling not exceeding 4 M. and removal of the
same for in sity reinforced concrete and plin concrete work in.(A)
Foundations,Footings, Bases of Columns, and Mass Concrete.
5 Earthwork for embankment including breaking clods, dressing with 780.910 Cum 177.91
all lead and lift and including watering rolling and consolidation of
subgrade in layers at O.M.C. to required dry density including
filling the depression which occur during the process using power
roller 8T to 10T. (E) From Borrow area All Lead.
6 Providing TMT Bar FE 415 reinforcement for R.C.C. work 161.310 Kg 68.33
including bending, binding and placing in position complete upto
All floor level
7 RCC precast M.H. Frame & Cover Manufacture , supply & 4.000 No 1121.00
Delivery at store or at site of work precast RCC M.200 Frame &
cover suitable to drainage M.H. and as per type design & Drawing
including cost of reinforcement M.S. Angles or Flate, curring mold
work etc.(A)Heavy duty
(B1) Frame suitable for 50 cm. opening of MH
8 RCC precast M.H. Frame & Cover Manufacture , supply & 4.000 No 1173.00
Delivery at store or at site of work precast RCC M.200 Frame &
cover suitable to drainage M.H. and as per type design & Drawing
including cost of reinforcement M.S. Angles or Flate, curring mold
work etc.(A)Heavy duty
(B2) Cover suitable for 50 cm. opening of MH
9 Providing and fixing 20cm. x 15cm x 2.5 cm. thick year plate of 2.000 No 279.69
marble stone set in C.M. 1:4 including finishing and engraving
letters etc. complete.
Rupees Six Lakh Ninety Four Thousand Five Hundred Seventy Three and Paise Ninteen only
I \ We am \ are willing to carry out the work at ……………………… % above\bellow percent ( Should be written in
figures and words ) of the estimated rate mentioned above. Amount of My \ Our tender works put as under.
* Estimated Amount * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Add……..……..%
In words………………….……………… In words………………….………………
1.The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge
for which no extra payment shall be made.
2.The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3.GST and Income tax TDS will be deducted at a source while making payments of bills
4.In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned
in all the tender.
Signature of Contractor
Deputy Executive Engineer Executive Engineer
Panchayat R.& B. Sub Division Panchayat R.& B. Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 SBD Pro Wall and Earthwork and Stom Water Drain.pdf
2 Speci.Pro Wall and Earthwork and Stom Water Drain.pdf
3 Spei.Index Pro Wall and Earthwork and Stom Water Drain.pdf
4 Sch-B Pro Wall and Earthwork and Stom Water Drain.pdf
5 Building circular_compressed.pdf
6 is 2592.2002 MH.pdf
7 Qty Sheet Pro Wall and Earthwork and Stom Water Drain.pdf
8 Test Shedual Pro Wall and Earthwork and Stom Water Drain.pdf