| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.7 LAccepted-AOC | L1 | Accepted-AOC Overall qualified as L1 | |
| 2 | L2₹49.9 L+₹16,805 (0.34%)Rejected-AOC GURGAON | GURUGRAM | HARYANA | 122001 | L2 | Rejected-AOC Over disqualified | |
| 3 | L3₹50.6 L+₹91,165 (1.83%)Rejected-AOC KHASRA NO 203 KHARAKPUR DEVIPURA KASHIPUR | KASHIPUR | L3 | Rejected-AOC Over disqualified |
| Sl No | Description | Qty | Unit | KUMAUN ELECTRICALS L3 | M/S KUNDAN SINGH SAINI CONTRACTOR L1 | GLOBE TECH SOLUTIONS CONSULTANCY PVT LTD L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means(Hydraulic excavator)/Manual means in benching/revetment work including disposal of surplus excavated soil as directed, with all lead and lifts, disposed earth to be neatly levelled and dressed. Hard rock. In ordinary soil/earth mixed with boulders. | 45 | Cumt. | 12,060 ₹14,230.8 | 11,790 ₹13,912.2 Lowest | 11,880 ₹14,018.4 |
| 2.00 | Providing and laying in position Cement concrete of specified grade including cost of centering and shuttering .All work upto plinth level: 1:3:6 (1 cement :3 coarse sand:6 graded stone aggregate 20mm nominal size). | 40 | Cumt. | 3,36,000 ₹3,96,480 | 3,33,600 ₹3,93,648 Lowest | 3,34,400 ₹3,94,592 |
| 3.00 | Supply of M.S. steel bar (including supply) | 26 | MT | 23,40,000 ₹27,61,200 | 23,37,920 ₹27,58,745.6 Lowest | 23,38,960 ₹27,59,972.8 |
| 4.00 | Providing and laying in position specified grade of reinforced cement concrete including cost of centering shuttering finishing .All work upto plinth level 1:1.5:3 (1 cement : 1.5 coarse sand: 3 graded stone aggregate 20mm nominal size) (M20). | 180 | Cumt. | 18,90,000 ₹22,30,200 | 18,34,200 ₹21,64,356 Lowest | 18,36,000 ₹21,66,480 |
| 5.00 | Supply and spreading of earth by earth work in excavation by mechanical/manual means over surface areas, trenches ,plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering including all lead lifts (land of earth supply to be arranged by contractor at his own cost). | 55 | Cumt. | 33,000 ₹38,940 | 32,395 ₹38,226.1 Lowest | 32,560 ₹38,420.8 |
| 6.00 | Filling of eroded foundation of tower from bottom bad to stub-top by filling of soil/sand in empty cement bags, stiching and proper laying as per instruction of engineer in-charge complete in all respect including head load and cost of labour, T&P and material etc. | 9,300 | Nos. | 2,32,500 ₹2,74,350 | 2,13,900 ₹2,52,402 Lowest | 2,23,200 ₹2,63,376 |
| 7.00 | Providing and laying boulder apron for protection with stone boulders weighing not less than 25 Kg each complete including excavation as per direction of engineer in-charge. Boulders laid dry with wire crates of 8 gauge BWG GI wire confirming to IS:280 & IS:4826 in (150mm x 150 mm) wire mesh. | 75 | Cumt. | 1,91,250 ₹2,25,675 | 1,80,150 ₹2,12,577 Lowest | 1,83,750 ₹2,16,825 |
| 8.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Blacksmith Ist class 03no., 1day@ 897, Beldar 03no., 1day @ 736 for total 5 days. | 1 | Job | 24,800 ₹29,264 | 24,490 ₹28,898.2 Lowest | 24,500 ₹28,910 |
Tender Value
Refer Docs
EMD Value
₹1.8 L
Closing Date
22 Jan 2024, 5:00 pmClosed
Chief Engineer
Office of CE, OandM, Kumaon Zone, PTCUL, Haldwani
Construction of new protection wall at location No. JK-121 of 132KV Jaspur-Kashipur line connected to 132KV S/s, Jaspur under 220KV OandM Division, PTCUL, Mahuakheraganj
2024_PTC21_67115_1
CE(OandM)/PTCUL/HLD/03/2023-24
Open Tender
Civil Works
Item Rate
180 days
132KV S/s, Jaspur
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,900
EE, 220KV OandM Division, PTCUL, Mahuakheraganj
₹1.8 L
Office of CE, OandM, Kumaon Zone, PTCUL, Haldwani
6 Sept 2025
2 Jan 2024
23 Jan 2024
2 Jan 2024
22 Jan 2024
2 Jan 2024
12 Jan 2024
Earth work in excavation by mechanical means(Hydraulic excavator)/Manual means in benching/revetment work including disposal of surplus excavated soil as directed, with all lead and lifts, disposed earth to be neatly levelled and dressed. Hard rock. In ordinary soil/earth mixed with boulders.
Providing and laying in position Cement concrete of specified grade including cost of centering and shuttering .All work upto plinth level: 1:3:6 (1 cement :3 coarse sand:6 graded stone aggregate 20mm nominal size).
Supply of M.S. steel bar (including supply)
Providing and laying in position specified grade of reinforced cement concrete including cost of centering shuttering finishing .All work upto plinth level 1:1.5:3 (1 cement : 1.5 coarse sand: 3 graded stone aggregate 20mm nominal size) (M20).
Supply and spreading of earth by earth work in excavation by mechanical/manual means over surface areas, trenches ,plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering including all lead lifts (land of earth supply to be arranged by contractor at his own cost).
Filling of eroded foundation of tower from bottom bad to stub-top by filling of soil/sand in empty cement bags, stiching and proper laying as per instruction of engineer in-charge complete in all respect including head load and cost of labour, T&P and material etc.
Providing and laying boulder apron for protection with stone boulders weighing not less than 25 Kg each complete including excavation as per direction of engineer in-charge. Boulders laid dry with wire crates of 8 gauge BWG GI wire confirming to IS:280 & IS:4826 in (150mm x 150 mm) wire mesh.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Blacksmith Ist class 03no., 1day@ 897, Beldar 03no., 1day @ 736 for total 5 days.
GLOBE TECH SOLUTIONS CONSULTANCY PVT LTD
KUMAUN ELECTRICALS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .