| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.8 LAccepted-AOC | L1 | Accepted-AOC Being L1 bidder | |
| 2 | L2₹31.2 L+₹2,700 (0.09%)Rejected-Finance D NO 35 14 13 1 R P PETA KANCHARAPALEM VISAKHAPATNAM 530 008 | VISAKHAPATANAM | ANDHRA PRADESH | 530008 | L2 | Rejected-Finance not being L1 | |
| 3 | L3₹33.1 L+₹2 L (6.42%)Rejected-Finance DOOR NO 44 19 10 RAILWAY NEW COLONY BEHIND SIVALAYAM VISAKHAPATNAM AP 530016 | VISAKHAPATANAM | ANDHRA PRADESH | 530016 | L3 | Rejected-Finance not being L1 | |
| 4 | L4₹35.4 L+₹4.3 L (13.7%)Rejected-Finance D NO 32 1 211 2 BOWDARA ROAD VISAKHAPATNAM 530004 | VISAKHAPATANAM | ANDHRA PRADESH | 530004 | L4 | Rejected-Finance not being L1 | |
| 5 | L5₹44.2 L+₹13.1 L (42.1%)Rejected-Finance | L5 | Rejected-Finance not being L1 |
| Sl No | Description | Qty | Unit | SAI ENGINEERING WORKS L1 | S.M.Electricals L4 | M/S CHANDRA ENGINEERS AND CONTRACTORS L2 | ANJALI ENTERPRISES L3 | LAKSHMI SAI CONSTRUCTIONS L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | M & L for de-scaling the shells and tubes of condenser units of 3 x 140TR Central AC plant by circulating the diluted hydrochloric acid at the appropriate ratio depending upon the scale deposits till removal of all the scale inside the copper tubes after removal of both the end covers, brushing with nylon/GI wire brush, removal of all scale deposits and degreasing with caustic soda, flushing out thoroughly, re-fixing the end covers with new gasket packing, nut and bolts and connecting the inlet and out let, every six month or as directed by engr-in-charge all as specified and directed. | 6 | Each Job | 10,000 ₹60,000 | 3,000 ₹18,000 Lowest | 10,000 ₹60,000 | 10,500 ₹63,000 | 7,500 ₹45,000 |
| 2.00 | All as per Sl Item No. 1.00 here in before but for 3 x 100 TR Central AC plant | 4 | Each Job | 9,000 ₹36,000 | 2,500 ₹10,000 Lowest | 8,600 ₹34,400 | 8,800 ₹35,200 | 6,000 ₹24,000 |
| 3.00 | All as per Sl Item No. 1.00 here in before but for 3 x 49 TR Central AC plant | 6 | Each Job | 6,000 ₹36,000 | 2,000 ₹12,000 Lowest | 6,500 ₹39,000 | 6,750 ₹40,500 | 5,000 ₹30,000 |
| 4.00 | M&L for servicing and cleaning of air handling unit of 48800 CFM capacity (central AC), with and including dismantling filter units, blowing out the dust, chemical cleaning by spraying the organic based scale removing agent Vaniklin at the appropriate ratio till removal of complete dust & scale deposits in the fin area of evaporator coil, flushing through for proper air flow across the coil, greasing of blower motor, checking of electrical connection, cleaning of air filters, greasing of blower motor, replacement of un serviceable bearings, cleaning water drain lines, renewal of rusted sheet metal screws, every month for running AC plant at optimal condition unit all as specified and as directed by Engineer-in-Charge.
Note : There are 03 No's of 48800CFM capacity AHU and servicing of each AHU shall measured as "Each Job" | 27 | Each Job | 2,900 ₹78,300 Lowest | 6,000 ₹1,62,000 | 3,000 ₹81,000 | 3,250 ₹87,750 | 8,000 ₹2,16,000 |
| 5.00 | All as per Sl Item No. 4.00 here in before but 01 No of Air handling unit of 35324 CFM capacity | 9 | Each Job | 2,800 ₹25,200 | 5,000 ₹45,000 | 2,700 ₹24,300 Lowest | 2,900 ₹26,100 | 7,000 ₹63,000 |
| 6.00 | All as per Sl Item No. 4.00 here in before but 01 No of Air handling unit of 35142 CFM capacity | 9 | Each Job | 2,600 ₹23,400 Lowest | 4,200 ₹37,800 | 2,600 ₹23,400 Lowest | 2,800 ₹25,200 | 7,000 ₹63,000 |
| 7.00 | All as per Sl Item No. 4.00 here in before but 01 No of Air handling unit of 34400 CFM capacity | 9 | Each Job | 2,500 ₹22,500 Lowest | 4,000 ₹36,000 | 2,500 ₹22,500 Lowest | 2,600 ₹23,400 | 7,000 ₹63,000 |
| 8.00 | All as per Sl Item No. 4.00 here in before but 01 No of Air handling unit of 23000 CFM capacity | 9 | Each Job | 2,300 ₹20,700 Lowest | 3,800 ₹34,200 | 2,300 ₹20,700 Lowest | 2,500 ₹22,500 | 6,000 ₹54,000 |
| 9.00 | All as per Sl Item No. 4.00 here in before but 01 No of Air handling unit of 17050 CFM capacity | 9 | Each Job | 2,000 ₹18,000 Lowest | 3,400 ₹30,600 | 2,000 ₹18,000 Lowest | 2,200 ₹19,800 | 5,000 ₹45,000 |
| 10.00 | M&L for complete servicing of FRP cooling tower, removal of complete scales, dirt etc. by using chemicals, cleaning the sump louvers, PVC fills, fan assembly, renewal of spray nozzles, renewal of nuts and bolts, and complete painting of the cooling tower as per standard practice for 3 x 140 TR capacity cooling tower for every three months complete all as specified and directed. | 3 | Each Job | 11,500 ₹34,500 | 9,000 ₹27,000 Lowest | 11,000 ₹33,000 | 11,500 ₹34,500 | 9,000 ₹27,000 Lowest |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
28 Oct 2025, 6:00 pmClosed
Garrison Engineer Utility-I Visakhapatnam
Garrison Engineer Utility-I Near Samudrika Naval Base Post Visakhapatnam -530 014
REPAIR / MAINTENANCE OF CENTRAL AC PLANTS, PACKAGE AC UNITS AT MWC, TPW UNDER AGE E/M NO-III OF GE (U-I) VISAKHAPATNAM
2025_MES_732256_2
8783/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
Garrison Engineer Utility-I Visakhapatnam
As per NIT
7 documents required · 7 mandatory
₹500
Garrison Engineer Utility-I
₹96,000
Yes
12 Dec 2025
14 Oct 2025
30 Oct 2025
14 Oct 2025
28 Oct 2025
22 Oct 2025
M & L for de-scaling the shells and tubes of condenser units of 3 x 140TR Central AC plant by circulating the diluted hydrochloric acid at the appropriate ratio depending upon the scale deposits till removal of all the scale inside the copper tubes after removal of both the end covers, brushing with nylon/GI wire brush, removal of all scale deposits and degreasing with caustic soda, flushing out thoroughly, re-fixing the end covers with new gasket packing, nut and bolts and connecting the inlet and out let, every six month or as directed by engr-in-charge all as specified and directed.
All as per Sl Item No. 1.00 here in before but for 3 x 100 TR Central AC plant
All as per Sl Item No. 1.00 here in before but for 3 x 49 TR Central AC plant
M&L for servicing and cleaning of air handling unit of 48800 CFM capacity (central AC), with and including dismantling filter units, blowing out the dust, chemical cleaning by spraying the organic based scale removing agent Vaniklin at the appropriate ratio till removal of complete dust & scale deposits in the fin area of evaporator coil, flushing through for proper air flow across the coil, greasing of blower motor, checking of electrical connection, cleaning of air filters, greasing of blower motor, replacement of un serviceable bearings, cleaning water drain lines, renewal of rusted sheet metal screws, every month for running AC plant at optimal condition unit all as specified and as directed by Engineer-in-Charge. Note : There are 03 No's of 48800CFM capacity AHU and servicing of each AHU shall measured as "Each Job"
All as per Sl Item No. 4.00 here in before but 01 No of Air handling unit of 35324 CFM capacity
All as per Sl Item No. 4.00 here in before but 01 No of Air handling unit of 35142 CFM capacity
All as per Sl Item No. 4.00 here in before but 01 No of Air handling unit of 34400 CFM capacity
All as per Sl Item No. 4.00 here in before but 01 No of Air handling unit of 23000 CFM capacity
All as per Sl Item No. 4.00 here in before but 01 No of Air handling unit of 17050 CFM capacity
All as per Item SL No. 65.00 here in before but 80 mm bore
All as per Sl Item No. 10.00 here in before but for 3 x 100 TR capacity
All as per Sl Item No. 10.00 here in before but for 3 x 49 TR capacity
M&L for complete leak testing for Chiller type sytem by extracting the existing refrigenrant into empty cylinders and pressure and leak testing the complete system with Nitrogen Gas and check for leaks, identifying the leaks if any, rectification of the leaks by brazzing / welding and replacing the damaged gland package/gasket at the identified leak points, pressure testing the system again after rectification for 24 hours, vaccume the entire system after release of Nitrogen and charging the refrigerant into the system, testing and commissioning the plant of capacity 3 x 49 TR Central AC plant all as specified and as directed by Engineer-in-Charge.
All as per Sl Item No. 13.00 here in before but for the plant of capacity 3 x 100 TR Central AC plant
All as per Sl Item No. 13.00 here in before but for the plant of capacity 3 x 140 TR Central AC plant
S&F "V" belts suitable for Air handling units of capacity from 17050 CFM upto 48800 CFM including taking down existing un-serviceable 'V' belt complete all as specified and directed.
S&F of GI metal frame with powder coated Pre Filters of 15 micron capacity made out of fibre visco washable type of Size 48"x48" and 50 mm thickness complete all as specified and as directed by Engineer-in-Charge.
All as per Sl Item No. 17.00 here in before but of Size 24"x12"
All as per Sl Item No. 17.00 here in before but of capacity 5 micron and Size 12"x12"
All as per Sl Item No. 17.00 here in before but of capacity 5 micron and Size 18"x18"
Supply & charge Rrefrigerant gas 134 A (environmental friendly) complete all as specified & directed by Engineer-in-charge.
S & F solenoid valve coil suitable for 7/8” size valve, 220/230V 50 Hz including taking down existing un-serviceable solenoid valve coil complete all as directed by Engineer-in-Charge.
M & L for dismantling the defective wornout cast iron bed from the motor and pump assembly of any capacity, S & F a new cast iron bed of the same dimensions as the old bed, reassembling, testing and commissioning of the motor and pump set after proper alignment of shaft all as directed by Engr-in-charge. Notes :- Motor removed during fabrication shall be overhauled completely and small spares like nuts and bolts shall deemed to inclusive in the rate quoted.
M & L for dismantling defective induction motor of any make & 6 to 12.5 HP capacity, 415 V of any duty or any class of insulation from the bed duly coupled with pump, transporting to work shop, removing burnt out winding from stator, rotor and rewinding with suitable gauge super enameled copper wire and replacing worn out driven end and non driven end bearings, insulation materials, varnishing, heating reassembling, testing and commissioning complete all as specified and as directed. Note : Motor removed for rewinding shall overhauled completely and the quoted rate shall deemed to inclusive for the same.
All as per Sl Item No. 24.00here in before but 15 to 25 HP capacity
Supply and replacement of wornout coupling made out of suitable material and suitable size for the shaft of the motor and pump assembly of capacity 6 to 14 HP all as specified and as directed by Engr-in-Charge.
All as per Sl Item No. 26.00 here in before but 15 to 25 HP capacity
M & L for Overhauling of split casing type pump up to 20 HP dismantling the pump carryout overhauling including replacing the complete damaged spare parts . Repair /replacing the wornout shaft ,replacing the bushes roller/ball bearings, wearing gland packages, renewal of all corroded studs, gaskets, damaged impellars etc. and reassembling with proper alignemnt including testing and commissioning the pump all as directed and specified by Engr-in-Charge.
All as per Sl Item No. 28.00 here in before but for pump of capacity 21 HP to 40 HP
M&L for taking down defective unserviceable pressure Gauge in refrigerent line of 4" dia including necessary pressure line with 1/4" copper tube and long neck type Brass flre nut and fixing to the compressor and checking of leaks complete all as specified and as directed by Engr-in-Charge.
All as per Sl Item No. 30.00 here in before but Pressure Gauge in refrigerent line of 2" dia
S&F MNX 12 Contactor 220 V, 50 Hz suitable for AC plant panels including necessary control wiring including taking down existing un-serviceable contactor complete all as specified and as directed by Engr-in-Charge.
All as per Sl Item No. 32.00 here in before but MNX 25 Contactor
All as per Sl Item No. 32.00 here in before but MNX 32 Contactor
All as per Sl Item No. 32.00 here in before but MNX 40 Contactor
S & F MCB 63 Amps, SP, 415Volt, including taking down existing un-serviceable MCB complete all as specified and as directed by Engr-in-Charge.
S & F MCB 32 Amps SP, 415 Volt, including taking down existing un-serviceable MCB complete all as specified and as directed by Engr-in-Charge.
S & F DOL Starter with relay range13-20 Amps suitable for 10/15 HP Motor with SPP feature including taking down existing un-serviceable DOL Starter complete all as specified and as directed by Engr-in-Charge.
S & F in repairs rotational moulded polyethylene water storage tanks of 5000 Litres capacity, multilayered (cylindrical vertical with closed top) hoisted and fixed in position and including 20 mm dia nipple suitable for HDPE water tank (minimum weight 45 gm), 20 mm bore ball valves (minimum weight 210 gm) high pressure of PTMT with epoxy coated aluminium rod and high density plastic ball screwed for iron pipe and fixed to 20 mm bore pipe including taking down existing un-serviceable tank complete all as specified and directed.
All as per Sl Item No. 39.00 here in before but of capacity 1000 Litres
S & F butterfly valve 150mm bore, & PN 1.6 with necessary rubber gasket, bolts, nuts and washer including taking out existing un-serviceable valve complete all as specified and as directed.
All as per Sl Item No. 41.00 here in before but 100 mm bore
All as per Sl Item No. 41.00 here in before but 75 / 80 mm bore
S&F cooling tower motor base frame, base plate, Nut & bolts all as per existing, suitable for motor of capacity upto 5HP including taking down existing un-serviceable motor base frame complete all as specified and directed by Engr-in-Charge.
S&F fan assembly of FRP cooling tower of capacity 1.5/2 HP, 1300mm minimum with 04 blades fan hub assembly made out of Die Cast aluminium with necessary clamp supports, nut & bolts of SS metal including taking down existing un-serviceable fan assembly & connected fitting from the position, testing and comissioning the cooling tower all as specified and as directed by Engr-in-Charge.
S&F PVC Fills of size 600mm X 300mm X 150 mm (Blocks) suitable for cooling tower of any capacity including taking down existing un-serviceable PVC fills complete all as specified and directed by Engr-in-Charge.
Carrying out repairs and Maintenance, attending the breakdown of 3x140 TR Central AC plant as per the scope of work mentioned below including carrying out general repairs/servicing to ensure smooth and trouble free operation of plants through authorised OEM technician, to the entire satisfactioin of users / department all as directed by Engineer-in-Charge. Scope of Work: (a) Periodical monitoring / inspecting the complete AC plant and carrying out preventive / periodical maintenance to ensure smooth fuctioning by technician/service engineer of OEM once in a qurater other than breakdown calls for monitoring the operational condition of the plant including preventive maintenace / breakdown calls whenever required. Each preventive maintenace with a maximum of 02 nos of breakdown calls if any shall be measured as "Each Job". (b) Visual inspection for oil traces, technical inspection of all the microprocessors, microcontrollers, sensors, control wiring, insulation etc, to check the performance parameters such as the temperature difference between the inlet and outlet of the heat exchanger, check the motors and starters for performace and healthy condition of the plant. (c) Rectification of minor leaks in the system, filling the refrigirant upto 05 Kg at no extra cost if any. Note :- Supply and replacement of spares required shall be measured and paid seperately under relevant items.
S&F and testing of following spare parts of make as per OEM as required during repair of 3x140 TR Central AC plant including taking down existing un-serviceable spare parts complete all as specified and as directed by Engr-in-Charge:-
Choked drier core assembly
Temperature Sensor
HP Switch
LP Transducer
HP Transducer
Screw Compressor Protection Module(SCPM)
Mother Board
Internal Oil Filters
Flow Switch
Timer - star/delta
M&L for complete servi
Siemens contactor 3TF51 or equivalent
SW 220 compressor oil or equivalent for Carrier compressor.
Carrying out repairs and Maintenance, attending the breakdown of 3x100 TR Central AC plant as per the scope of work mentioned below including carrying out general repairs/servicing to ensure smooth and trouble free operation of plants through authorised OEM technician, to the entire satisfactioin of users / department all as directed by Engineer-in-Charge. Scope of Work: (a) Periodical monitoring / inspecting the complete AC plant and carrying out preventive / periodical maintenance to ensure smooth fuctioning by technician/service engineer of OEM once in a qurater other than breakdown calls for monitoring the operational condition of the plant including preventive maintenace / breakdown calls whenever required. Each preventive maintenace with a maximum of 02 nos of breakdown calls if any shall be measured as "JOB". (b) Visual inspection for oil traces, technical inspection of all the microprocessors, microcontrollers, sensors, control wiring, insulation etc, to check the performance parameters such as the temperature difference between the inlet and outlet of the heat exchanger, check the motors and starters for performace and healthy condition of the plant. (c) Rectification of minor leaks in the system, filling the refrigirant upto 05 Kg at no extra cost if any. Note :- Supply and replacement of spares required shall be measured and paid seperately under relevant items.
S&F and testing of following spare parts of make as per OEM as required during repair of 3x100 TR Central AC plant including taking down existing un-serviceable spare parts complete all as specified and as directed by Engr-in-Charge:-
Choked drier core assembly
Temperature Sensor
HP Switch
LP Transducer
HP Transducer
Electronic Control Module
M&L for complete servi
Voltage Motor Protection Device (VMPD) along with cable and digital display
Internal Oil Filters
Siemens contactor 3TF51 or equivalent
Flow Switch
Timer - star/delta
BSE-170 compressor oil sutable for Voltas screw compressor
Carrying out repairs and Maintenance, attending the breakdown of 3x49 TR Central AC plant as per the scope of work mentioned below including carrying out general repairs/servicing to ensure smooth and trouble free operation of plants through authorised OEM technician, to the entire satisfactioin of users / department all as directed by Engineer-in-Charge. Scope of Work: (a) Periodical monitoring / inspecting the complete AC plant and carrying out preventive / periodical maintenance to ensure smooth fuctioning by technician/service engineer of OEM once in a qurater other t
han breakdown calls for monitoring the operational condition of the plant including preventive maintenace / breakdown calls whenever required. Each preventive maintenace with a maximum of 02 nos of breakdown calls if any shall be measured as "JOB". (b) Visual inspection for oil traces, technical inspection of all the microprocessors, microcontrollers, sensors, control wiring, insulation etc, to check the performance parameters such as the temperature difference between the inlet and outlet of the heat exchanger, check the motors and starters for performace and healthy condition of the plant. (c) Rectification of minor leaks in the system, filling the refrigirant upto 05 Kg at no extra cost if any. Note :- Supply and replacement of spares required shall be measured and paid seperately under relevant items.
Danfoss 160SZ Polyolester Lubricant Oil
Choked drier core assembly
Temperature Sensor
HP Switch
LP Transducer
HP Transducer
S&F and testing of following spare parts of make as per OEM as required during repair of 3x49 TR Central AC plant including taking down existing un-serviceable spare parts complete all as specified and as directed by Engr-in-Charge:-
Flow Switch
cing of FRP cooling tower, removal of complete scales, dirt etc. by using chemicals, cleaning the sump louvers, PVC fills, fan assembly, renewal of spray nozzles, renewal of nuts and bolts, and complete painting of the cooling tower as per standard practice for 3 x 140 TR capacity cooling tower for every three months complete all as specified and directed.
Danfoss SZ185 series 15 Ton scroll type compressor
M&L for dismantling and chemical cleaning of the cooling coils of outdoors units (03 Nos), indoor splits units (17 Nos) and cassette units (6 Nos) and refrigerant pipe lines with appropriate cleaning agents, flushing through for proper air flow across the coils to improve the cooling efficiency, reassembling & re-installing the units in their original position of 3x16 TR VRF AC plant of Blue star make complete all as specified and as directed by Engr-in-Charge.
Inverter Refrigirating Compressor of Capacity upto 9000W
S&F and testing of following spare parts of make as per OEM as required during repair of 3x16 TR VRF AC plant including taking down existing un-serviceable spare parts complete all as specified and as directed by Engr-in-Charge:-
Power board
VRF Out Door Unit(ODU) Fan
VRF ODU Fan Controller
VRF ODU Fan Cover
10HP Capacitor boards
ODU fan motors
Mother Board
16HP VRF outdoor unit main PCB board controller
VRF 4 TR Cassette AC indoor units main PCB controller
VRF 2.8 TR Cassette AC indoor units main PCB controller
VRF 1.7 TR Split ac indoor units main PCB controller
VRF 1 TR split ac indoor units main PCB controller
VRF IDU coil sensors
VRFcassette IDU drain flot sensors
VRF IDU Room sensors
S&F insulation foam of thickness upto 8mm along with necessary adhesive and tape suitable for tube time refrigerant pipe line of 1/2 inch dia copper pipe all as specified and as directed by Engr-in-Charge.
S&F 1/2 inch dia copper pipe of L type including necessary elbows/sockets/tee brackets/clamps etc and brazing for VRF AC units including taking down existing un-serviceable pipe complete all as specified and as directed by Engr-in-Charge
All as per Sl Item No 56.00 here in before but 5/8 inch.
All as per Sl Item No 56.00 here in before but 3/4 inch.
All as per Sl Item No 56.00 here in before but 7/8 inch.
All as per Sl Item No 60.00 here in before above but suitable for 5/8 inch dia copper pipe
All as per Sl Item No 60.00 here in before but suitable for 3/4 inch dia copper pipe
Supplying and laying synthetic rubber insulated mats 2.5 mm thick for voltage upto 11 kv for electrical purpose as per IS 15652-2006, (superseding IS 5424) suitable for electrical shock safety of sizes 2m x 1m including taking down complete all as specified and directed.
S&F MS ERW pipe 150mm bore, heavy grade laid in trenches or on ground / vertically with all flanges / fittings welded joints including painting with two coats of synthetic enamel paint over a coat of primer & taking down existing un-serviceable pipe complete all as specified and as directed by Engineer-in-Charge.
M&L for preparation of old painted metal surfaces of any description, over 10 cm in width or girth, not otherwise described and including applying one coat of synthetic enamel paint complete all as specified and as directed. Note:- Rusted surfaces shall be scraped with sand paper and shall be applied with one coat of zinc chromate primer before application of paint and unit rate quoted against this item shall be considered to include this aspect.
S&F 25 mm bore dia galvanised steel tubing, medium grade, llaid in trenches or on ground / vertically with all flanges / fittings welded joints including painting with two coats of synthetic enamel paint over a coat of primer & taking down existing un-serviceable pipe complete all as specified and as directed by Engineer-in-Charge.
M & L for Removing the worn out duct insulation carefully, cleaning / preparing the surfaces and M&L for duct insulation (25mm thick) with resin bonded fibre glass wool roll of density 24 kg/Cum, with factory laminated aluminium vapour barrier, thickness of insulation as specified and including the following:- (a) M&L for cleaning the duct surface (to be insulated ) by scrapping carefully with wire brush etc. to make the surface completely free of millscale, dirt, dust, grease and other foreign materials, taking special care so that all duct joints are sealed against any leakage. (b) M&L for applying rubber based adhesive CPRX compound. (c) M&L for sealing of all longitudinal joints and circular overlaps with and including Aluminium foil tape 50 mm wide, to make the insulation leakproof. (d) M & L for securing the insulation with and including mechanically fastened nylon/ steel straps of size 12 mm/50 mm at maximum intervals of 1.2 mtr.
All as per Sl Item No. 68.00 here in before, but for 3x49 TR Central AC Plant
M&L for prepration of previously painted metal surface for entire 3x140 TR central AC plant, including pipe lines, pumps motors, panel boards, compressor units, condenser units etc by scraping properly and removing burrs, uneven surface including applying a coat of primer and a coat of synthetic enamel paint of same colour as perviously applied complete all as specified and as directed by Engr-in-Charge.
All as per Sl Item No. 68.00 here in before, but for 3x100 TR Central AC Plant
M&L earthing complete with galvanised steel earth plate electrode of size 600 x 600 x 6 mm thick buried directly in ground in vertical position (earth pit not less than 2.25 m deep below the normal ground level) with top edge of the earth plate not less than 1.5 m below normal ground level, connected to earth lead of galvanised iron strip 32 x 6 mm by means of bolts, nuts, check nuts and washers of galvanised iron or steel, all as shown in electrical plate No. 3 of SSR Part-I (2009), connected to earthing test point including dismantling existing earthing complete all as specified and directed. Note:- The unit rate shall also include for earth work in any type of soil, PCC 1:3:6 type C1 chamber, RCC 1:1.5:3, type A1 cover slab, 50 mm thick reinforced with 8 mm dia TMT bar @ 140 mm C/C both ways, 10 mm dia plain bar lifting handle embedded in cover slab, Main earthing lead from earth electrode to test point upto 7.5 m length, 20 mm bore medium grade GI watering pipe, 40 mm bore GI light grade earth lead protection pipe, funnel, wire mesh, copper lugs, charcoal and common salt in alternate layer etc.
S&F in repair earth continuity conductor or main earthing lead using 32 x 6 mm galvanised iron strip, fixed to wall on batten or recess or chases or buried in ground or drawn in conduit / pipe or fixed to poles or any other indicated situation for loop earthing etc. as required complete all as specified and directed.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
8783Tender.pdf
Tender Documents • 0.80 MB
BOQ_823151.xls
BOQ • 0.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .