Loading…
Loading…
Tender Value
₹6.1 L
EMD Value
₹12,153
Closing Date
9 Jun 2026, 6:00 pm3d left
XEN LMC CAD K PATAN
XEN LMC CAD K PATAN
Construction of vrb at Gargni minor Ch.85
2026_CADKO_564157_12
CAD K PATAN NIT 03/2026-27
Open Tender
Civil Works
BUNDI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
AS PER NIT
₹12,153
Yes
2 Jun 2026
2 Jun 2026
10 Jun 2026
2 Jun 2026
9 Jun 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1ITEMS | ||||||
| 1.01 | Earth work in Excavation including loading, unloading, disposal and dressing of excavated earth within intial lead of 50m and lift up to 1.5 m in dry or moist including dressing of excavated area dewatering wherever required complete in all respect. (b)Hard / Dense soil . | 971.4 | Cum | 79 | ₹76,740.6 | BI01010001010000000000000515BI0100001113 |
| 1.02 | Providing and laying in position Cement concrete Nominal mix (1:3:6) M-10 including leads of all construction materials, curing , compaction and finshing with rendering in cement mortar 1:3 ( 1 Cement : 3 Coarse sand ) and making good the joints excluding the cost of centring, shuttering and reinforcement and finishing having well graded crushed broken stone aggregate of maximum size up to 20mm. | 14.54 | Cum | 4,654 | ₹67,669.16 | BI01010001010000000000000515BI0100001113 |
| 1.03 | Side shuttering including proping etc. complete (to achieve finish f2 (a) for block joints of foundation, stilling basins, buckets, aprons etc. (non-suspended horizontally lain mass concrete) for Dowels. | 115.84 | Sqm | 160 | ₹18,534.4 | BI01010001010000000000000515BI0100001113 |
| 1.04 | Supplying of M.S. reinforcement including labour charges for bending, binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using toe or ribbed bar (IS:1786-1985) | 1,407.84 | kg | 78 | ₹1,09,811.52 | BI01010001010000000000000515BI0100001113 |
| 1.05 | Centring and shuttering for slab, beam, lintels, columns through with or without caps and base including propering and remove. | 13 | Sqm | 225 | ₹2,925 | BI01010001010000000000000515BI0100001113 |
| 1.06 | Providing and laying in position Cement concrete Nominal mix (1:1.5:3) M-20 including leads of all construction materials, curing , compaction and finshing with rendering in cement mortar 1:3 ( 1 Cement : 3 Coarse sand ) and making good the joints excluding the cost of centring, shuttering and reinforcement and finishing having well graded crushed broken stone aggregate of maximum size up to 20mm. | 59.66 | Cum | 5,564 | ₹3,31,948.24 | BI01010001010000000000000515BI0100001113 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.12 MB
BOQ_1004072.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid