Executive Engineer Mech. Irrig. DIv. Baramulla
Mech. Irrig. DIv. Baramulla
Electrical work to be carried out at lift Irrigation scheme Zehanpora.
2023_IFC_209533_15
eNIT 02 of 2023-24
Open Tender
Repair and Maintenance Works
Item Rate
7 days
Baramulla
Please refer Tender documents.
8 documents required · 8 mandatory
₹50
Yes
Executive Engineer Mech. Irrig. DIv. Baramulla
Yes
19 Apr 2023
10 Apr 2023
18 Apr 2023
10 Apr 2023
17 Apr 2023
10 Apr 2023
Amount
Repairs to 200HP Starter at L.I.S Zehanpora by way of: Disconnecting of fully automatic Autotransformer Starter from the main circuit, then dismantling of damaged parts from the starter which comprises of followinng a) Providing and fitting of new Voltmeter & Ampere meter (0-500) of reputed make (01 no each.). b) Providing and fitting of new volt coil of 325A MNX contactor assembly of L& T make c) Providing and fitting of new fuse set of reputed make as per sample. d) Providing, fitting & setting of electro pneumatic timing relay with timing range up to 60s coil voltage 415V. (2NO 2NC double block. e) Repairs to ATS of starter by way of: f) Isolating and disconnecting of all incoming and outgoing leads from auto transformer starter. Draining out transformer oil from the oil tank and collecting in a suitable container taking out damaged auto transformer coil assembly from oil tank at site. Providing and fitting of new auto transformer coil fabricated out of copper wire of standard size and quality (03 legs @ 8 kg/leg approximately= 24 kg). Providing, fitting of insulation material such as cardboard, latheride paper, cotton tape, PVC paper, varnishing, nuts and bolts etc. Replacement of damaged brass bolts with nuts as per sample of incoming and outgoing connections. Reassembling of auto coil at site by way of fitment of coils, core piece and after proper cleaning, clamping channels, nuts, bolts, soldering of connections and testing it on full load at site. The job also includes the charge of, skilled labous and other tools & tackles for the completion of work. Deducting cost of scrap @ 80% of the total value of copper. (i.e. 19.2 kg) g) Replacement of damaged copper control wiring of starter including cable ties, connections, tapping and insulation as per requirement. After completion of work the starter should be tested on full load. The job also includes the charge for p/f of fresh T-oil for topping of starter (15 Ltr). The starter should be repair at site in presence of concerned Engineer.
M/S STAR ELECTRICAL ENGINEERING WORKS
M/s Sopore Engineering Works
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .