Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹8.2 LAccepted-AOC | l1 | Accepted-AOC l1 | |
| 2 | l2₹8.2 L+₹153.18 (0.02%)Rejected-Finance | l2 | Rejected-Finance l2 |
| Sl No | Description | Qty | Unit | SURESH BABU C L1 | PRADEEP S L2 |
|---|---|---|---|---|---|
| 1.00Building work | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 36 | sqm | 18.59 ₹669.24 Lowest | 18.59 ₹669.24 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 10.5 | cum | 263.35 ₹2,764.38 Lowest | 263.35 ₹2,764.38 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.73 | cum | 8,109.18 ₹13,988.34 Lowest | 8,109.18 ₹13,988.34 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 4.32 | sqm | 394.74 ₹1,705.28 Lowest | 394.74 ₹1,705.28 Lowest |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 674.9 | kilogram | 114.92 ₹77,559.51 Lowest | 114.92 ₹77,559.51 Lowest |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 10.8 | sqm | 1,030.96 ₹11,134.37 Lowest | 1,030.96 ₹11,134.37 Lowest |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.46 | cum | 13,056.01 ₹19,035.66 Lowest | 13,056.01 ₹19,035.66 Lowest |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 12.71 | cum | 8,528.9 ₹1,08,436.43 Lowest | 8,528.9 ₹1,08,436.43 Lowest |
| 1.01 | 50.6.1.5:Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 14.92 | cum | 7,368.25 ₹1,09,904.82 Lowest | 7,368.25 ₹1,09,904.82 Lowest |
Tender Value
₹8.2 L
EMD Value
₹20,415
Closing Date
19 Sept 2025, 1:00 pmClosed
KAILAS S
AE LIDEW VETTOOR GP
Prj no 65 Improvement works to Ayurvedha hospital building
2025_LSGD_795887_5
4/AE/LIDEW/VTR/25
Open Tender
Civil Works - Roads
Item Rate
180 days
VETTOOR
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,805
Yes
₹20,415
Yes
21 Oct 2025
11 Sept 2025
19 Sept 2025
11 Sept 2025
19 Sept 2025
11 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1316623.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .