Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.5 LAccepted-AOC | ₹49.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹49.5 LSame as L1Rejected-Finance | ₹49.5 LSame as L1 | L2 | Rejected-Finance High Quoted |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Complied with Prequalification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Complied with Prequalification |
Tender Value
₹52.6 L
EMD Value
₹38,000
Closing Date
5 Dec 2022, 2:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Highways C and M Tirunelveli AR Line Road Palayamkottai
Preparation of Detailed Project Report for formation of alternative route for Thoothukudi Tiruchendur Kanniyakumari road in km 58 4 63 4 SH176
2022_HWAY_265868_1
TN No 26 2022 23 D1 Dated 15.11 2022
Open Tender
Consultancy
Item Wise
180 days
Thoothukudi
Minimum quantities of works completed in 1yr during the last 5yrs
Personnel capabilities
Equipment capabilities
Financial position
Audited balance sheet for the last 5yrs
Litigation history
8 documents required · 8 mandatory
₹0
₹38,000
Tirunelveli
17 Apr 2023
21 Nov 2022
6 Dec 2022
21 Nov 2022
5 Dec 2022
25 Nov 2022
25 Nov 2022
Amount
Fixing Temporary Bench Marks along the alignment as directed by the departmental officers in charge of the work.
Fixing of Boundary Stones & C/L of Pillar with Rcc on both sides along the alignment as directed by the departmental officers in charge of the work.
Conducting Boring with power boring machine to 100mm (4" dia) in all classes of soils excluding hard strata like kankar, SDR, laterite
Conducting Boring with power boring machine to 100mm (4" dia) in Distintegrated rocks/ Kankar
Conducting Boring with power boring machine to 100mm (4" dia) in Soft Rock
Conducting Boring with power boring machine to 100mm (4" dia) in Hard Rock
Details Report on Alignment (including Three alternations) fixing Horizontal Alingment and Vertical Alingment as per IRC Standards
Materials survey for road and bridge works and preparation of rate analysis, SBC Calculation, Drawings etc., complete including Design for pavement composition based on kilometer wise field data
Preparation of Land Plan Schedule and its Report
Preparation Detailed Estimate and Abstract Estimate including power point presentation
Report on Environment & Social impacts Assessment, Report writing and submission of Report like inspections report Traffic report etc., complete (Staionery purpose) including CRZ clearence if necessary.
Calculation of SubTotal, GST and Total carried out by system automatically
Sub Total Amount for above all items
GST 18% for the above SubTotal Amount
ABHISAN
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .