Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance A 5 PANNAMGADU INDUSTRIAL ESTATE RAMAPURAM POST SULURPET TALUK NELLORE DISTRICT NELLORE ANDHRA PRADESH 524401 | TIRUPATI | ANDHRA PRADESH | 524401 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 8 1 B DIAMOND HARBOUR ROAD KOLKATA 700027 | KOLKATA | KOLKATA | WEST BENGAL | 700027 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
13 Sept 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
As per NIT
As per NIT
Cooling Tower Package for LuPech J18 Project at IOCL Gujarat Refinery
2021_REFHQ_138361_1
077154C/T/LuPech(J18)/PACKAGE5
Open Tender
Lump Sum TurnKey
Lump-sum
630 days
Vadodara
As per NIT
5 documents required · 5 mandatory
Exempted
Online
3 Nov 2021
17 Jul 2021
14 Sept 2021
17 Jul 2021
13 Sept 2021
25 Aug 2021
17 Jul 2021 - 27 Jul 2021
28 Jul 2021
180 days
Amount
Process Design and Engineering, Detailed Design and Engineering including HAZOP, SIL Study & Other Safety Studies as mentioned in Bidding Documents, 3D modelling, Project Management, Site development and enabling jobs, Demolition/ Dismantling/Re-routing works, Topography Survey and Soil Investigation, underground scanning and co-ordination for the same with Owner/PMC, Complete Procurement (includes supply of all items, equipment and construction material, chemicals, catalysts, first fill of chemicals and lubricants; consumables (chemicals & lubricants), special tools and tackles, Pre-Commissioning Spares, Commissioning Spares, Start-up spares & Mandatory spares), Fabrication, Manufacturing, Quality Assurance, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Handling & Storage of all Equipment at site, Materials, items and other Construction Materials at yard/site, Fabrication, Assembly, Construction, Erection, Installation of all plant machinery including Civil, Structural, Mechanical, Piping, Electrical and Instrumentation including tie-ins, Interface and Hook up with the Other facilities as required, Testing, Insulation, Painting, First fill of chemicals and lubricants, Obtaining all Statutory Approvals (except for Environment Clearance), Pre-commissioning & Mechanical Completion of Plant, Preparation of plant specific operating manuals, Start-up, Commissioning and Performance Guarantee Test Runs (PGTR), Training of Owner’s O&M personnel, supply and handing over of mandatory spares and consumables (Chemicals & Lubricants) for 6 (six) months operation, Contract closure activities of Cooling Tower - CT1 (5 Cells) and Cooling Tower – CT2 (9 Cells), each cell of 4000 m3/ hour capacity, with associated pumps, chemical dosing system and Local Control Room, Final invoice/billing and handing over of the facilities with Final and “As Built” drawing/documentation, supply of spares with necessary support and services during defect liability period and supply of Chemicals, Catalysts (if any), Tool & Tackles, Consumables (Chemicals & Lubricants), Refrigerants, etc. for initial charge and replenishment of any loss of these during Commissioning up to handing over after successful PGTR of the facilities and six (6) months operation as detailed out in the Bidding Document.
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
Lumpsum Price for Supply portion for completion of Scope of Work as per Bidding Document
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
ENGINEERING PRICE (RESIDUAL PROCESS DESIGN AND DETAIL ENGINEERING AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
IN FOREIGN CURRENCY
IN INDIAN CURRENCY PART
LUMPSUM PRICE FOR CONSTRUCTION PORTION AND SIX (6) MONTHS OPERATION AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF THE BIDDING DOCUMENT
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
TOTAL OF ENGINEERING, CONSTRUCTION PRICE AND SIX(6) MONTHS OPERATION AS PER REQUIREMENTS OF BIDDING DOCUMENT [1 + 2]
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
GST ON SUPPLY OF INDIGENOUS GOODS (PART BREAKUP OF SP-1 )
Basic Customs Duty & other import duties on Supply of Imported Goods other than those mentioned below (Foreign Component of SP-1)
SWS on Duties quoted at S.no. 2.1
IGST / (CGST+SGST) on (Foreign component of SP-1 + (Duties at Sr. 2.1 and 2.2 above)
GST on supply of services offered by Indian Bidder, quoted in Indian Currency and Foreign Currency (part- breakup of SP-2 calculated based on percentage quoted in SP-5
Description of Work / Item(s)
Amount
AMOUNT OF FOREIGN COMPONENT
AMOUNT OF INDIAN COMPONENT
Description of Work / Item(s)
Amount
Annual charges for Post Warranty maintenance for AC UPS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for BATTERY CHARGER as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for HVAC as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for ANALYSERS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for PLC as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Description of Work / Item(s)
Amount
GUARANTEED UTILITIES FOR PACKAGE-02 AS PER BIDDING DOCUMENT
POWER CONSUMPTION FOR COOLING WATER SYSTEM CT-1
POWER CONSUMPTION FOR COOLING WATER SYSTEM CT-2
Paharpur Cooling Towers Limited
BGR ENERGY SYSTEMS LIMITED
Paharpur Cooling Towers Limited
BGR ENERGY SYSTEMS LIMITED
Hamon shriram cottrell Pvt Ltd
BGR ENERGY SYSTEMS LIMITED
Paharpur Cooling Towers Limited
BGR ENERGY SYSTEMS LIMITED
Paharpur Cooling Towers Limited
Hamon shriram cottrell Pvt Ltd
BGR ENERGY SYSTEMS LIMITED
Paharpur Cooling Towers Limited
Paharpur Cooling Towers Limited
BGR ENERGY SYSTEMS LIMITED
US Dollar
European Euro
Japanese yen
Portion of Quoted Rate in Currency
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .