Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹13.6 Laccepted-aoc | accepted-aoc |
Tender Value
₹15.7 L
EMD Value
₹39,285
Closing Date
10 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sri Bramarambha Mallikarjuna Swamy Devasthanam, Srisailam
SRISAILAM
Provbiding Green mat, Stage barricading and other arrangements for Koti Deepotsavam
1005958
E2/477224/2026 - Providing Green mat, Stage barricading and other arrangements for Koti Deepotsavam
OPEN - NCB
Civil Works
NANDYAL, ANDHRA PRADESH
5 documents required · 5 mandatory
₹557
₹39,285
15 Nov 2026
7 Nov 2026
7 Nov 2026
90 days
Hire charges of colour carpets including cost of charges for spreading and folding after completion of the Festival/ Function etc., and the colour carpets should be cleaned every day and to keep neat appearance as directed during execution. The rate quoted is including conveyance of all materials. The rate is for below mentioned calendar days.
Hire charges for supply of steel dining tables of size 1’6” x 6’0” including loading and unloading. *The rate is including maintenance, watch and ward, against theft and fire accidents, repairs and replacement etc., complete during the said period. Rate is including all taxes, Transportation etc.,complete
Hire charges for supply of stage of size 72'x40'x6 feet height with necessary jack supports / necessary base supports with tie brackings whereever required and all safety precautions. The stage should be of standard specification. The rate includes transprotation charges, loading and unloading charges etc, all complete for finished item of work. The stage should be laid 7 days prior to programme
Hire charges for erection and removal of wooden platforms up to 60 cms (2' 0") height from ground level made of benches, stools or wooden benches / planks etc., of required size including providing necessary supports and steps as directed during execution. The platforms should be level top and fixed firmly with each other with necessary verticals, cross supports, screws, nails , coir rope etc., The rate is including hire charges ,conveyance of all materials and labour charges for fixing etc., complete . The rate is for below mentioned calendar days
Hire charges for erection and removal of barricading with M.S. frames made with MS hallow square tubes. The barrication provided such that it shall be 1.20m height above the ground level and fixed to the ground (Earth/CC road/B.T road )with base anchors made with MS angle/channels true to alignment. The barrication shall be strongly fixed without any shaking including providing inclined struts wherever necessary including labour charges for all the operations such as loading, unloading ,erection, removal etc., including conveyance charges to site both ways)and removing the same after completion of the festival and taking away the material etc., complete as directed during the execution .
Hire charges for providing of Banquet chairs for VIPs including loading, unloading, transportation etc., complete. The rate is including maintenance, watch and ward, against theft and fire accidents, repairs and replacement etc., complete during the said period. Rate is including all taxes, Transportation etc., complete .
Hire charges for providing Three Seater VIP Sofas as decided by the department, including conveyance, loading and unloading etc. complete. The rate is including maintenance, watch and ward, against theft and fire accidents, repairs and replacement etc., complete during the said period. Rate is including all taxes, Transportation etc.,complete.
Hire charges for supply, spreading and removing of PVC chairs including loading and unloading. The rate is including maintenance, watch and ward, against theft and fire accidents, repairs and replacement etc., complete during the said period. Rate is including all taxes, Transportation etc., complete.
Filling with Gravel in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidentail labour charges etc, hire charges etc, complete but excluidng seignorage charges for finished item of work
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Bid - Stage Green mat for KM-26.docx
TENDER_DOCUMENT • 0.19 MB
BOQ -Green mat -Stage barricing at Koti Deepostavam.xlsx
TENDER_DOCUMENT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .