Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Schedule | Awardee / L1 Bidder | Status | Bids | Value |
|---|---|---|---|---|---|
| 1 | BC 2 BY 1 | Not yet disclosed by govt. | Awarded | 1 | - |
| 2 | FFL 2 BY 1 | Not yet disclosed by govt. | Awarded | 1 | - |
| 3 | BC 3 BY 1 | CELESTE INTERNATIONALLikely | RA Ended | 1 | ₹4.9 L |
Tender Value
₹45.9 L
EMD Value
Exempted
Closing Date
3 Mar 2023, 8:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BC AND FFL
4462646
GEM/2023/B/3166323
Two Packet Bid
Bathing Cubicle 2 by 1,Bathing Cubicle 2 by 1,Bathing Cubicle 2 by 1,FFL 2 by 1,FFL 2 by 1,FFL 2 by
90 days
Jammu And Kashmir; Baramulla, Jammu And Kashmir; Dungarpur
Group wise evaluation
BOQ
8 documents required · 8 mandatory
3 yrs
₹3
40%
Exempted
3 Mar 2023
21 Feb 2023
3 Mar 2023
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Bathing Cubicle 2 by 1 | Supply of stuctural material and construction material for pre-fabricated steel tubular BC 2 by 1 structure of size 2.40mtr x 2.40mtr including 0.90 mtr wide Verandah. Height at front side and rear side 2.10mtr and 2.7mtr gable height set of two cubical of size 1.50mtr x 1.20mtr each. All structure Material including construction materials and Tools required for construct of Bathing cubicle at site and cost of the same is deemed to be included in quoted rates all as specified in PDF attached. | 5 | Nos | flowersepo | 90 |
| 2 | Bathing Cubicle 2 by 1 | Supply of stuctural material and construction material for pre-fabricated steel tubular BC 2 by 1 structure of size 2.40mtr x 2.40mtr including 0.90 mtr wide Verandah. Height at front side and rear side 2.10mtr and 2.7mtr gable height set of two cubical of size 1.50mtr x 1.20mtr each. All structure Material including construction materials and Tools required for construct of Bathing cubicle at site and cost of the same is deemed to be included in quoted rates all as specified in PDF attached. | 5 | Nos | flowersadjt | 90 |
| 3 | Bathing Cubicle 2 by 1 | Supply of stuctural material and construction material for pre-fabricated steel tubular BC 2 by 1 structure of size 2.40mtr x 2.40mtr including 0.90 mtr wide Verandah. Height at front side and rear side 2.10mtr and 2.7mtr gable height set of two cubical of size 1.50mtr x 1.20mtr each. All structure Material including construction materials and Tools required for construct of Bathing cubicle at site and cost of the same is deemed to be included in quoted rates all as specified in PDF attached. | 2 | Nos | flowers36 | 90 |
| 1 | FFL 2 by 1 | Supply of structural material and construction material for Pre-fabricated steel tubular FFL 2 by 1 structure of size 2.40 x 2.40m bracket Including 0.90 mtr wide Verandah bracket. Height at front side and rear side is 2.10 and 2.7m gable height bracket set of two cubical of size 1.50m x 1.20m each. All structure Material including construction materials and Tools required for construct of Feild Flush Latrine at site and cost of the same is deemed to be included in quoted rates all as specified in PDF attached. | 4 | Nos | flowersepo | 90 |
| 2 | FFL 2 by 1 | Supply of structural material and construction material for Pre-fabricated steel tubular FFL 2 by 1 structure of size 2.40 x 2.40m bracket Including 0.90 mtr wide Verandah bracket. Height at front side and rear side is 2.10 and 2.7m gable height bracket set of two cubical of size 1.50m x 1.20m each. All structure Material including construction materials and Tools required for construct of Feild Flush Latrine at site and cost of the same is deemed to be included in quoted rates all as specified in PDF attached. | 2 | Nos | flowers372 | 90 |
| 3 | FFL 2 by 1 | Supply of structural material and construction material for Pre-fabricated steel tubular FFL 2 by 1 structure of size 2.40 x 2.40m bracket Including 0.90 mtr wide Verandah bracket. Height at front side and rear side is 2.10 and 2.7m gable height bracket set of two cubical of size 1.50m x 1.20m each. All structure Material including construction materials and Tools required for construct of Feild Flush Latrine at site and cost of the same is deemed to be included in quoted rates all as specified in PDF attached. | 3 | Nos | flowersadjt | 90 |
| 4 | FFL 2 by 1 | Supply of structural material and construction material for Pre-fabricated steel tubular FFL 2 by 1 structure of size 2.40 x 2.40m bracket Including 0.90 mtr wide Verandah bracket. Height at front side and rear side is 2.10 and 2.7m gable height bracket set of two cubical of size 1.50m x 1.20m each. All structure Material including construction materials and Tools required for construct of Feild Flush Latrine at site and cost of the same is deemed to be included in quoted rates all as specified in PDF attached. | 1 | Nos | flowers36 | 90 |
| 1 | Bathing Cubicle 3 by 1 | Supply of stuctural material and construction material for Pre fabricated steel tubular BC 3 by 1 structure of size 3.60mtr x 2.40mtr including 0.90 mtr wide Verandah. Height at front side and rear side 2.10mtr and 2.7mtr gable height bracket set of three cubical of size 1.50mtr x 1.20mtr each bracket. All structure Material including construction materials and Tools required for construct of Bathing cubicle at site and cost of the same is deemed to be included in quoted rates all as specified in PDF attached. | 1 | Nos | flowers372 | 90 |
| 1 | Bathing Cubicle 3 by 1 | Supply of stuctural material and construction material for Pre fabricated steel tubular BC 3 by 1 structure of size 3.60mtr x 2.40mtr including 0.90 mtr wide Verandah. Height at front side and rear side 2.10mtr and 2.7mtr gable height bracket set of three cubical of size 1.50mtr x 1.20mtr each bracket. All structure Material including construction materials and Tools required for construct of Bathing cubicle at site and cost of the same is deemed to be included in quoted rates all as specified in PDF attached. | 2 | Nos | flowers39fdpk | 90 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_4462646.pdf
GEM_BID
bc-fflcombined_2023-02-21-19-02-36_98f15a3f0aa8235546c35463e791f674.pdf
BOQ
bc-ffl-combined_2023-02-21-19-02-36_6031ae3b17cacf2e15b4407d49e0795e.csv
BOQ
CERT_a286e6e6-4841-4d65-bb391676987428592_flowers39fdpk.docx
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .