| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | -22.15% | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹9.2 L (7.76%)Admitted-Finance | -16.11% | ₹1.3 Cr+₹9.2 L (7.76%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 Cr+₹32.1 L (27.2%)Admitted-Finance | -1.00% | ₹1.5 Cr+₹32.1 L (27.2%) | L3 | Admitted-Finance |
| 4 | L4₹1.5 Cr+₹33.2 L (28.1%)Admitted-Finance | -0.30% | ₹1.5 Cr+₹33.2 L (28.1%) | L4 | Admitted-Finance |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
24 Aug 2026, 4:00 pmClosed
SUPERINTENDING ENGINEER PWD (RnB) CIRCLE RAJOURI
O/O SUPERINTENDING ENGINEE PWD(RnB)CIRCLE RAJOURI
Construction of Dedicated underground Fire Station in the premises of PWD (RnB) Complex,Rajouri (Balance Work)
2026_PWDJK_321248_1
e-NIT No. 18 of 2026-27 Dated 17.08.2026 (2nd Call)
Open Tender
Civil Works
Percentage
60 days
Rajouri
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
SUPERINTENDING ENGINEER PWD (RnB) CIRCLE RAJOURI
₹3.0 L
Yes
29 Aug 2026
18 Aug 2026
25 Aug 2026
18 Aug 2026
24 Aug 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for
foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides
and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres:
2.9.1 All kinds of soil : | 50.98 | cum | 187.3 | ₹9,548 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:
1:5:10 | 16.99 | cum | 4,826.5 | ₹82,013.59 |
| 0.0 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix
plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8
to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge | 15 | cum | 1,885.5 | ₹28,282.5 |
| 0.0 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of
laying , excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per
direction of the Engineer- in - charge. Note: - Cement content considered in this item is @ 330 kg/ cum. Excess/ less cement used as per design mix is payable/ recoverable separately.
5.38.1 All works upto plinth level | 5.66 | cum | 8,520.15 | ₹48,259.13 |
| 0.0 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of
laying , excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per
direction of the Engineer- in - charge. Note: - Cement content considered in this item is @ 330 kg/ cum. Excess/ less cement used as per design mix is payable/ recoverable separately.
All works above plinth level upto floor V level | 328.63 | cum | 9,911.1 | ₹32,57,124.56 |
| 0.0 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level | 33,793 | kg | 123.2 | ₹41,63,297.6 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work for:
4.6.1 Foundations, footings, bases for columns | 37.17 | sqm | 286.35 | ₹10,644.98 |
| 0.0 | Columns, pillars, piers, abutments, posts and struts. | 118.96 | sqm | 742.55 | ₹88,333.09 |
| 0.0 | Suspended floors, roofs, landings, balconies and access platforms. | 935.32 | sqm | 718.2 | ₹6,71,743.94 |
| 0.0 | Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 509.39 | sqm | 577.55 | ₹2,94,196.24 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.99 MB
BOQ_1071988.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .