Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | L1 | Accepted-AOC L1 bidder. | |
| 2 | L2₹2.4 L+₹60,749 (34.8%)Rejected-Finance | L2 | Rejected-Finance L2 bidder. |
Tender Value
₹2.2 L
EMD Value
₹4,480
Closing Date
12 Jun 2023, 3:00 pmClosed
Administrative Officer
CSIR- Indian Institute of Chemical Biology, 4 Raja S.C. Mullick Road, Jadavpur, Kolkata 700032.
Comprehensive Annual Maintenance Contract of Daikin make VRV system.
2023_CSIR_154844_1
CSIR_IICB / Admn 26(811) / E / 2023
Open Tender
Miscellaneous Works
Works
365 days
CSIR IICB Salt Lake Campus.
Executed Servicing, Maintenance and overhauling of VRV AC system in Government or Semi Government Organizations or CSIR or CSIR Laboratories in anywhere in India.
4 documents required · 4 mandatory
₹0
₹4,480
Yes
16 Oct 2023
1 Jun 2023
13 Jun 2023
1 Jun 2023
12 Jun 2023
2 Jun 2023
Amount
Comprehensive Annual Maintenance of Daikin make VRV III Inverter Split Air Conditioning units (Outdoor units: 4 nos., Indoor units: 24 nos., Each Outdoor capacity: 12 HP, total capacity : 48 HP) installed at Guest House of CSIR-IICB, Salt Lake campus. This work will be including repair and replacement of all necessary spare parts & consumable materials viz. Refrigerant Gas, Capacitor, Compressor, Indoor & outdoor P.C.B., Runner, Copper pipe (as per sample, minor rectification work), clear braided flexible PVC hose pipe / CPVC drain pipe, Three / four core Electric wire, Condenser fan motor, Indoor fan motor etc. complete as required and as per standard engineering practice. Here the scope of work is inclusive of general Servicing, Overhauling, Leak testing, required Refrigerant Gas charging, Cleaning (also see the scope of work) up keeping of VRV Air Conditioning units. For this purpose all essential tools, consumable & cleaning materials viz. Cloth, Cotton west, Soap detergent etc. are to be arranged by the maintenance contractor. All the spare materials to use shall be of OEM make and consumable shall be reputed make or shall be used in consultation of Concerned Engineer In-charge.
scientific refregeration
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .