| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | INFANT JESUS SMITH AND ENNG WORKS L1 |
|---|---|---|---|---|
| 1.00Dismantling, Testing and Re-fixing of safety Reliefs valves at top of the LPG, Hydrogen Bullets and Ammonia Tank in Main Tank Farm and Ammonia handling areas of FACT, Petro Plants-UC. | ||||
| 1.01 | Dismantling, and Transporting the Safety Relief valves one by one to valve test bench, for carrying out valve testing, transporting back and fixing at the LPG bullets top. Scope of work also includes disconnecting and reconnecting of lines, providing dummies/slip plates etc. flange face cleaning, gaskets replacement etc. and rectification of leak of aforementioned joints, if any. | 6 | NO | 60,000 ₹70,800 Lowest |
| 1.02 | LPG Bullets Safety Relief valve servicing & Testing. If machining required, it shall be undertaken by the contractor at outside the company. | 6 | NO | 54,000 ₹63,720 Lowest |
| 1.03 | Dismantling and Transporting the Safety Relief valves one by one to valve test bench, for carrying out valve testing, transporting back and fixing at the Hydrogen bullets top. Scope of work also includes disconnecting and reconnecting of lines, providing dummies/slip plates etc. flange face cleaning, gaskets replacement etc. and rectification of leak of aforementioned joints, if any. | 2 | NO | 12,600 ₹14,868 Lowest |
| 1.04 | Hydrogen Bullets Safety Relief valve servicing & Testing. If machining required, it shall be undertaken by the contractor at outside the company. | 2 | NO | 10,800 ₹12,744 Lowest |
| 1.05 | Dismantling, and Transporting the Safety Relief valves one by one to valve test bench, for carrying out valve testing, transporting back and fixing at the Ammonia storage tank top. Scope of work also includes disconnecting and reconnecting of lines, providing dummies/slip plates etc. flange face cleaning, gaskets replacement etc. and rectification of leak of aforementioned joints, if any. | 4 | NO | 1,00,000 ₹1,18,000 Lowest |
| 1.06 | Ammonia tank Safety Relief valve servicing & Testing. If machining required, it shall be undertaken by the contractor at outside the company. | 4 | NO | 42,000 ₹49,560 Lowest |
| 1.07 | Assistance for various mechanical works (In Man days of 8 hour shift) in connection with the maintenance activities. | 15 | MDY | 36,000 ₹42,480 Lowest |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
28 Aug 2026, 3:00 pmClosed
AGM(P and P)UC
ASSISTANT GENERAL MANAGER PROJECTS AND PLANNING PD ADMINISTARTION FACT
Dismantling, Testing and Re-fixing of safety Reliefs valves at top of the LPG, Hydrogen Bullets and Ammonia Tank in Main Tank Farm and Ammonia handling areas of FACT, Petro Plants-UC.
2026_FACT_921028_1
5061/2026-2027/E33976
Limited
Miscellaneous Works
Item Rate
180 days
UDYOGAMANDAL, FACT
As per tender documents
5 documents required · 5 mandatory
₹0
₹5,000
Yes
31 Aug 2026
7 Aug 2026
29 Aug 2026
7 Aug 2026
28 Aug 2026
7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling, Testing and Re-fixing of safety Reliefs valves at top of the LPG, Hydrogen Bullets and Ammonia Tank in Main Tank Farm and Ammonia handling areas of FACT, Petro Plants-UC. | |||||
| 1.01 | Dismantling, and Transporting the Safety Relief valves one by one to valve test bench, for carrying out valve testing, transporting back and fixing at the LPG bullets top. Scope of work also includes disconnecting and reconnecting of lines, providing dummies/slip plates etc. flange face cleaning, gaskets replacement etc. and rectification of leak of aforementioned joints, if any. | 6 | NO | - | - |
| 1.02 | LPG Bullets Safety Relief valve servicing & Testing. If machining required, it shall be undertaken by the contractor at outside the company. | 6 | NO | - | - |
| 1.03 | Dismantling and Transporting the Safety Relief valves one by one to valve test bench, for carrying out valve testing, transporting back and fixing at the Hydrogen bullets top. Scope of work also includes disconnecting and reconnecting of lines, providing dummies/slip plates etc. flange face cleaning, gaskets replacement etc. and rectification of leak of aforementioned joints, if any. | 2 | NO | - | - |
| 1.04 | Hydrogen Bullets Safety Relief valve servicing & Testing. If machining required, it shall be undertaken by the contractor at outside the company. | 2 | NO | - | - |
| 1.05 | Dismantling, and Transporting the Safety Relief valves one by one to valve test bench, for carrying out valve testing, transporting back and fixing at the Ammonia storage tank top. Scope of work also includes disconnecting and reconnecting of lines, providing dummies/slip plates etc. flange face cleaning, gaskets replacement etc. and rectification of leak of aforementioned joints, if any. | 4 | NO | - | - |
| 1.06 | Ammonia tank Safety Relief valve servicing & Testing. If machining required, it shall be undertaken by the contractor at outside the company. | 4 | NO | - | - |
| 1.07 | Assistance for various mechanical works (In Man days of 8 hour shift) in connection with the maintenance activities. | 15 | MDY | - | - |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
ComplianceE33976.pdf
Tender Documents • 0.01 MB
BOQ_967887.xls
BOQ • 0.26 MB
TermsandconditionsE33976.pdf
Tender Documents • 15.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .